Additional Engineering Fee Sample Clauses

Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling COMPASS-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, COMPASS agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per Request $15.53 $3,248.00 PE1CA Subsequent Application Fee (Note 1) Per Request NA $1600.00 Minimum PE1BB Space Preparation Fee (Note 2) Mechanical / HVAC* Ground Bar* Project Management* Cable Racking / Fiber Duct Frame / Aisle Lighting Framework Ground Conductors Extraordinary Modifications Per ton (one ton minimum) Per Connection Per arrangement Per arrangement, square foot Per arrangement, square foot Per arrangement Per arrangement $2,400.00 $720.00 $1675.00 ICB ICB ICB ICB PE1BW PE1BC PE1BF PE1CW PE1CC PE1CF Space Enclosure (Note 3) Requested Prior to 6/1/99 Wire Cage Gypsum Board Cage Fire Rated Cage Wire Cage Gypsum Board Cage Fire Rated Cage Per first 100 sq. Ft. Per first 100 sq. Ft. Per first 100 sq. Ft. Per add’l 50 sq. Ft. Per add’l 50 sq. Ft. Per add’l 50 sq. Ft. $41.99 $84.10 $99.73 $4.14 $9.35 $11.30 ▇▇ ▇▇ ▇▇ ▇▇ ▇▇ ▇▇ ▇▇▇▇▇ ▇▇▇▇▇ Space Per sq. Ft. $4.25 NA PE1BD Cable Installation Per Cable $2.77 $1,056.00 PE1PM Cable Support Structure $22.94 NA PE1PL Power -48V DC Power 120V AC Power single phase * 240V AC Power single phase* 120V AC Power three phase* 277V AC Power three phase* Per amp $7.14 ICB Per breaker amp $5.50 ICB Per breaker amp $11.00 ICB Per breaker amp $16.50 ICB Per breaker amp $38.20 ICB Cross Connects (Note 4) 2-wire 4-wire DS-1/DCS DS-1/DSX DS-3/DCS DS-3/DSX Optical Cross Connects Per Cross Connect PE12C $.0524 $11.57 PE14C $.0524 $11.57 PE11S $8.085 $69.64 PE11X $.4110 $69.64 PE13S $56.97 $528.00 PE13X $10.06 $528.00 PE1F2 $6.46 $2,431.00 PE1ES Co-Carrier Cross-Connect (Note 5) Fiber Cable Support Structure, existing Copper or Coaxial Cable Support Structure, existing Cable Support Structure Construction, new Per linear foot $0.06 NA PE1DS Per linear foot $0.03 NA (TBD) Per new construction NA ICB PE1A2 Security Access System Security System* New Access Card Activation* Administrative change, existing card* Replace lost or stolen card* Per Central Office Per request-5 cards Per Card $95.00NA $85.12 $35.00 $250.00 Per Card Space Availa...
Additional Engineering Fee. BellSouth’s engineering and other labor costs associated with establishing the Physical Collocation Arrangement shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling COMPASS-requested modifications to requests in progress or augmentations for existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, COMPASS agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. Page 1 of 4 The following principles provide basic guidance on environmental and safety issues when applying for and establishing Physical Collocation arrangements.
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling ALEC, Inc.-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling CTSI-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, CTSI agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. The following principles provide basic guidance on environmental and safety issues when applying for and establishing Physical Collocation arrangements.
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling Network Telephone-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, Network Telephone agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. Page 1 of 4 The following principles provide basic guidance on environmental and safety issues when applying for and establishing Physical Collocation arrangements.
Additional Engineering Fee. ▇▇▇▇▇▇▇▇▇’s additional engineering, and other labor costs associated with handling ALEC, Inc. requested modifications to requests in progress for Physical Collocation Arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, ALEC, Inc. agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted.
Additional Engineering Fee. BellSouth’s engineering and other labor time associated with establishing the Physical Collocation Arrangement will be billed as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling ALEC, Inc.-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, ALEC, Inc. agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted.
Additional Engineering Fee. BellSouth’s additional engineering, and other labor costs associated with handling CLEC-1-requested modifications to requests in progress or augmentations to existing arrangements shall be recovered as Additional Engineering charges, under provisions in BellSouth’s F.C.C. Number 1 Tariff, Sections 13.1 and 13.2. Should Additional Engineering rates not be included, CLEC-1 agrees not to make changes to collocation arrangement after a Bona Fide Firm Order is submitted. PE1BA Application Fee Per request NA $3,850.00 PE1CA Subsequent Application Fee (Note 1) Per request NA $1,600.00 Minimum PE1BB Space Preparation Fee (Note 2) Per sq. ft. NA $100.00 ▇▇▇▇▇ ▇▇▇▇▇ Space Enclosure (Note 3) Requested prior to 6/1/99 Welded Wire-mesh Welded Wire-mesh Per first 100 sq. ft. Per add’l 50 sq. ft. $170.64 $17.33 NA NA PE1PJ PE1PK Floor Space Zone A Zone B Per sq. ft. Per sq. ft. $7.50 $6.75 NA NA PE1BD Cable Installation Per cable NA $2,750.00 PE1PM Cable Support Structure Per entrance cable $13.35 ▇▇ ▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇ Power -48V DC Power 120V AC Power single phase* 240V AC Power single phase* 120V AC Power three phase* 277 AC Power three phase* Per amp Per breaker amp Per breaker amp Per breaker amp Per breaker amp $7.14 $5.50 $11.00 $16.50 $38.20 ICB ICB ICB ICB ICB PE1P2 PE1P4 PE1P1 PE1P3 ▇▇▇▇▇ ▇▇▇▇▇ Cross Connects 2-wire 4-wire DS-1 DS-3 2-fiber 4-fiber Per cross connect $0.30 $0.50 $8.00 $72.00 $15.64 $28.11 First/Add’l $12.60/$12.60 $12.60/$12.60 $155.00/$27.00 $155.00/$27.00 $41.56/$29.82 $50.53/$38.78 Co-Carrier Cross-Connect (Note 4) PE1ES Fiber PE1DS Copper (TBD) Fiber Cable Support Structure, existing Copper or Coaxial Cable Support Structure, existing Cable Support Structure Construction, new Per linear ft. Per linear ft. Per new construction $0.06 $0.03 ▇▇ ▇▇ ▇▇ ▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇ Security Access System Security System* New Access Card Activation* Administrative change, existing card* Replace lost or stolen card* Per premises Per card Per card Per card $52.00 $55.00 $35.00 $250.00 PE1SR Space Availability Report* Per premises requested $550.00 PE1PE ▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇ POT Bay Arrangements Prior to 6/1/99 2-Wire Cross-Connect 4-Wire Cross-Connect DS1 Cross-Connect DS3 Cross-Connect 2 Fiber Cross-Connect 4 Fiber Cross-Connect Per cross-connect $0.40 $1.20 $1.20 $8.00 $38.79 $52.31 NA NA NA NA NA NA AEH Additional Engineering Fee (Note 5) Per request, First half hour/add’l half hour First/Add’l Basic Time $31.00/$22.00 Overtime $37.00/$...