ADDITIONAL TECHNICAL REQUIREMENTS Clause Samples

ADDITIONAL TECHNICAL REQUIREMENTS. 25.1. Each Party shall comply with their respective obligations as set out in Schedules E, F and G. 25.2. Each Party shall ensure that its facilities meet the technical requirements set out in Schedules E, F and G.
ADDITIONAL TECHNICAL REQUIREMENTS. The Contractor shall be responsible for the installation of fire stopping at all internal and external penetrations. The Contractor shall provide a lockable AC disconnect switch to disconnect the Project from the electric distribution system of the Local Electric Utility. Placement of such a disconnect switch shall meet the requirements of the Local Electric Utility.
ADDITIONAL TECHNICAL REQUIREMENTS. 51 11.1.7 Affiliate........................................................................... 51 11.1.8 Agreement........................................................................... 51 11.1.9 Amdocs.............................................................................. 51 11.1.10
ADDITIONAL TECHNICAL REQUIREMENTS. If necessary, EDI shall provide the End-Users with additional information regarding technical measures to protect the account, the use of Services and other digital content provided, as well as information relevant to the interoperability of the Services with the End-User’s computer hardware and software.
ADDITIONAL TECHNICAL REQUIREMENTS. (a) TasNetworks will ensure the fault current contribution from the transmission system to the three phase and single phase fault levels on the connection site busbars is not more than specified in Clause S5.2.8 of the Generator Performance Standards (b) Each party will ensure that the design of its electricity infrastructure allows for a maximum fault current contribution from Network User to the three phase and single phase fault levels on the connection site busbars as specified in Clause S5.2.8 of the Generator Performance Standards.
ADDITIONAL TECHNICAL REQUIREMENTS. ‌ a. SLA of 99.95 uptime. Describe remediation if SLA is not met. EPR’s solution guarantees 99.95% uptime. If that is not met, it is considered a breach of the SLA. b. For top finalists, the City requests access to a demo environment/install of the proposed solution for a period of 14 days to conduct an evaluation. EPR will provide a demo environment for the City for fourteen (14) days upon request. c. Project Plan shall include tasks, milestones, specific resources responsible, deliverables, and overall timeline for completion, including durations for each task Please see implementation plan in Section 12. Installation & Implementation. d. Specify responsibilities of both the vendor and the City for the implementation, including an estimate of which City employees are needed, how many hours and the role each resource will play in the project (Fire Staff, Project Manager, IT Staff, and vendor resources) EPR is responsible for all aspects of the implementation. We recommend a stakeholder from each of the above listed departments be on the Kickoff call, this will determine the required staff and time needed. Generally, there is not a big time on task for City staff during the implementation phase. It is recommended that all stakeholders attend the admin and system training. This is an eight-hour commitment over two sessions.

Related to ADDITIONAL TECHNICAL REQUIREMENTS

  • Technical Requirements Signaling Link Transport shall consist of full duplex mode 56 kbps transmission paths and shall perform in the following two ways:

  • Additional Requirements As a condition precedent to the execution and Delivery, the registration of issuance, transfer, split-up, combination or surrender, of any ADS, the delivery of any distribution thereon, or the withdrawal of any Deposited Property, the Depositary or the Custodian may require (i) payment from the depositor of Shares or presenter of ADSs or of an ADR of a sum sufficient to reimburse it for any tax or other governmental charge and any stock transfer or registration fee with respect thereto (including any such tax or charge and fee with respect to Shares being deposited or withdrawn) and payment of any applicable fees and charges of the Depositary as provided in Section 5.9 and Exhibit B, (ii) the production of proof reasonably satisfactory to it as to the identity and genuineness of any signature or any other matter contemplated by Section 3.1, and (iii) compliance with (A) any laws or governmental regulations relating to the execution and Delivery of ADRs or ADSs or to the withdrawal of Deposited Securities and (B) such reasonable regulations as the Depositary and the Company may establish consistent with the provisions of the representative ADR, if applicable, the Deposit Agreement and applicable law.

  • Software Requirements 7 Developer shall prepare the Project Schedule using Oracle’s Primavera P6.

  • Additional Requirements for Sleeping Rooms The Contractor shall provide departing Attendees a secured area for storing belongings.

  • Closet I Urinal Requirements Employees Closets Urinals