Construction Phase Services 3.1.1 – Basic Construction Services
Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in ▇▇▇▇▇, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.
Project Maintenance The Local Government shall be responsible for maintenance of locally owned roads and locally owned facilities after completion of the work. The State shall be responsible for maintenance of the State highway system after completion of the work if the work was on the State highway system, unless otherwise provided for in existing maintenance agreements with the Local Government.
System Maintenance The Trust understands that USBFS will perform periodic maintenance to the System(s), which may cause temporary service interruptions. To the extent possible, USBFS shall notify the Trust of all planned outages and will perform any necessary maintenance during non-business hours.
Basic Services Fee 6.1.1 For Basic Services, as described in Article 1, and including all disciplines identified in Paragraph 15.1 as part of Basic Services, Architect/Engineer’s fee shall be a negotiated Basic Services Fee to cover all costs and profit. 6.1.2 The Architect/Engineer’s Basic Services Fee will be based on the Amount Available for the Construction Contract identified in the Program of Requirements. 6.1.3 In multiple package projects, the Basic Services Fee for each package shall be determined in a manner agreed to by A/E and Owner. The Architect/Engineer’s total Basic Services Fee will be the sum of the basic services fees for all packages. 6.1.4 If the description of the Architect/Engineer’s Basic Services is changed materially, the applicable fee shall be adjusted equitably.