CONDITIONS FOR TECHNICAL UNITS Sample Clauses

CONDITIONS FOR TECHNICAL UNITS. II.3.1 The VSP operates Technical Units that are able to produce and/or absorb the Reactive Power to and from the ▇▇▇▇ ▇▇▇▇ or has concluded an agreement with one or more ▇▇▇▇ ▇▇▇▇ User(s) or CDS User(s) that operate(s) Technical Units that are able to produce and/or absorb the Reactive Power to and from the ▇▇▇▇ ▇▇▇▇. II.3.2 The Technical Units used by the VSP to provide the Service are listed in Annex 1 (including the necessary technical and measurement information). The list of these Technical Units may change at any time subject to agreement by and between the Parties throughout the term of the Service delivery period. II.3.3 The Technical Unit may participate in the Service under the following conditions: a) The Technical Units shall meet the requirements of the articles of the Federal Grid Code and of the requirements of general application in accordance with article 7(4) of the RfG related to the Service as defined in the table below and, for the automatic service, comply with the relative Sensitivity Coefficient αeq. The Sensitivity Coefficient is determined by ▇▇▇▇ following discussions between ▇▇▇▇ and the VSP as described in Annex 13 and in coherence with the criteria defined to that end in the Connection Contract (in which the technical characteristics of the Technical Unit are described).This coefficient is set in Annex 1. Technical Unit Articles from the Federal Grid Code Articles from the requirements of general application in accordance with article 7(4) of the RfG3 New Type B,C,D SPGM Art. 89 and 234 Art. 4.3.1/5.5.1 New Type B,C,D PPM Art. 93 and 234 Art. 4.4.2/5.6.2 New Type B, C, D SPM Art. 99 and 234 n.a.4 New HVDC interconnector Art. 104 and 234 New generators connected on a HVDC link Art. 106 and 234 New HVDC conversion stations at isolated extremity Art. 107 and 234 4 This table may be subject to evolutions of the legislation framework such as the adaptation of the regional grid codes New offshore PPM with onshore connection points Art. 118, 119 and 234 New offshore PPM with offshore connection points Art. 130, 131 and 234 Existing SPGM and PPM type C,D Art. 62 to 68 and 234 Existing SPGM and PPM type B Art. 62 to 68 and 234 Other Technical Units without obligation to provide the Service (such as Demand facilities directly connected to the ▇▇▇▇ Grid, Technical Units connected to CDS/Public Distribution Grid, existing HVDC interconnector…) Art. 234 b) ▇▇▇▇ is entitled to evaluate, at any time during the Service delivery period, wheth...
CONDITIONS FOR TECHNICAL UNITS. The VSP operates Technical Units that are able to generateproduce and/or absorb the Reactive Power to and from the ▇▇▇▇ Grid or has concluded an agreement with one or more ▇▇▇▇ Grid User(s) that operate(s) Technical Units that are able to generateproduce and/or absorb the Reactive Power to and from the ▇▇▇▇ Grid.

Related to CONDITIONS FOR TECHNICAL UNITS

  • SPECIFIC TERMS FOR THIRD PARTY COMPONENTS The specific terms relating to the use of certain third party components or products not developed by or for a DS Group Company and granted to Customer to be used in connection with or within a DS Offering are defined hereafter:

  • Contractor’s Warranties Tenant waives all claims against Landlord relating to any defects in the Tenant Improvements; provided, however, that if, within 30 days after substantial completion of the Tenant Improvement Work, Tenant provides notice to Landlord of any non-latent defect in the Tenant Improvements, or if, within 11 months after substantial completion of the Tenant Improvement Work, Tenant provides notice to Landlord of any latent defect in the Tenant Improvements, then Landlord shall promptly cause such defect to be corrected.

  • Manufacturer’s Warranties If a Lease Vehicle is covered by a Manufacturer’s warranty, the Lessee, during the Vehicle Term for such Lease Vehicle, shall have the right to make any claims under such warranty that the Lessor could make.

  • Contractor’s Warranty ‌ 3.5.1 In addition to the guarantee to repair referenced in Article 12 and any specific warranty mentioned in the Project specifications, Contractor warrants to City that all materials and equipment used in or incorporated into the Work will be of good quality, new and free of liens, Claims and security interests of third parties; that all labor, installation, materials and equipment used or incorporated into the Work will be of good quality and free from defects; and that the Work will conform with the requirements of the Contract Documents and Applicable Code Requirements. If required by City, Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. Manufactured items installed in the Work and not specifically covered in the Contract Documents are to be installed in strict accordance with manufacturers' current printed instructions. 3.5.2 All materials to be incorporated in the Work shall be protected from damage during delivery, storage, and handling, and after installation until Acceptance of the Work, and Contractor shall, without charge to City, be responsible for all damage to the materials or the Work due to Contractor's failure to provide such proper protection.

  • Manufacturer Warranties Prior to the transfer to the Interconnected Transmission Owner of title to the Transmission Owner Interconnection Facilities built by the Interconnection Customer, the Interconnection Customer shall produce documentation satisfactory to the Interconnected Transmission Owner evidencing the transfer to the Interconnected Transmission Owner of all manufacturer warranties for equipment and/or materials purchased by the Interconnection Customer for use and/or installation as part of the Transmission Owner Interconnection Facilities built by the Interconnection Customer.