Connection Points Sample Clauses
The Connection Points clause defines the specific locations or interfaces where a service, utility, or system will physically or virtually connect to another party’s infrastructure. In practice, this clause typically outlines the exact points—such as electrical panels, data ports, or pipeline junctions—where the provider’s equipment will link to the customer’s facilities, and may specify technical standards or responsibilities for installation and maintenance at these points. Its core function is to ensure both parties have a clear, mutual understanding of where and how connections will be made, thereby preventing disputes and facilitating smooth integration of systems.
POPULAR SAMPLE Copied 1 times
Connection Points. The "Connection Points" at which water is delivered by CIWW to CIWW Member Agencies. Including DMWW, shall be as follows:
(a) In the case of water sold by CIWW to a specific CIWW Member Agency with a metered point of connection, the Connection Point shall be the point of delivery to the tee or main tap connected to the meter.
(b) In the case of water produced by the DMWW Designated Water Supply Facilities and sold by CIWW to DMWW for delivery to any retail or wholesale customer of DMWW for which there is no metered point of connection, the Connection Points shall be the points at which the DMWW Water Distribution Facilities connect to the Water Supply Facilities owned by, or dedicated to, CIWW under the CIWW 28E-28F Agreement.
Connection Points. Toledo shall deliver water to the Contracting Jurisdiction at the locations identified in Exhibit I.
Connection Points. (a) For the sake of clarity, a Transfer does not transfer any Connection Point attached to the Source Water Entitlement to the Recipient Water Entitlement.
(b) An application under clause 6.5 is necessary to change the Connection Points attached to a Water Entitlement.
Connection Points. The locations at which the Municipality System connects to the Acquired Collection System or a Third-Party System as described in the list and plan attached on Exhibit A.
Connection Points. (a) The Customer will install a Connection Point for the purpose of metering the volume of treated water supplied, at each location as agreed between the parties in writing, generally in accordance with the locations specified in SCHEDULE 2.
(b) The Customer may request CWW to install Further Connection Points. CWW in its absolute discretion may agree, subject to such conditions as it may specify, or decline, to install any Further Connection Point.
(c) The Customer must promptly reimburse CWW for any reasonable costs incurred by CWW in installing a Further Connection Point.
(d) Nothing in this Agreement prevents or restricts CWW from installing or connecting Third- Party Connection Points (at CWW’s cost) to the Project Infrastructure for the purpose of supplying surplus harvested water to third-party sites. The Customer must cooperate with any reasonable request from CWW to install or connect a Third-Party Connection Point and the Customer must not unreasonably deny or prevent access to harvested water for these third-party sites.
(e) The parties acknowledge that clause 4.3(d) does not reduce or affect the Customer’s right to access water harvested and supplied in accordance with this Agreement.
Connection Points. 72 SECTION 14: PERMITS . . . . . . . . . . . . . . . . . . . . . . . . . . 72
Connection Points. 1.4.1 Location.
Connection Points. Bayer and EDNC shall agree upon the connections at the Battery Limits between the Delivery Systems and EDNC's connections thereto. Bayer shall be responsible for operating and maintaining and shall own the Delivery Systems outside of the Battery Limits of the EDNC Baytown Plant. EDNC shall be responsible for operating and maintaining and shall own or lease from the Owner Trustee (on terms that have been approved by Bayer) all of the improvements inside the Battery Limits of the EDNC Baytown Plant.
Connection Points. Unless otherwise agreed, all utilities connection points shall be within five feet – in any direction, vertical or horizontal – of the Premises boundary.
Connection Points. The "Connection Points" at which water is delivered by CIWW to CIWW Member Agencies. Including POLK CITY, shall be as follows:
(a) In the case of water sold by CIWW to a specific CIWW Member Agency with a metered point of connection, the Connection Point shall be the point of delivery to the tee or main tap connected to the meter.
(b) In the case of water produced by the POLK CITY Designated Water Supply Facilities and sold by CIWW to POLK CITY for delivery to any retail or wholesale customer of POLK CITY for which there is no metered point of connection, the Connection Points shall be the points at which the POLK CITY Water Distribution Facilities connect to the Water Supply Facilities owned by, or dedicated to, CIWW under the CIWW 28E-28F Agreement.