Conduct of the Work Clause Samples

The 'Conduct of the Work' clause defines the standards and procedures that must be followed during the performance of contractual tasks or services. It typically outlines expectations regarding quality, compliance with laws and regulations, adherence to schedules, and the use of qualified personnel or materials. For example, it may require the contractor to follow specific safety protocols or to coordinate with the client on project milestones. This clause ensures that the work is carried out in a professional and consistent manner, reducing the risk of disputes and helping to maintain project quality and timelines.
Conduct of the Work. Contractor shall:
Conduct of the Work. A. The work must be completed in a continuous uninterrupted operation. The Contractor must use sufficient workforce and adequate equipment to complete all the necessary work requirements within a minimum period of time. B. The work shall be conducted between the hours of 8:00 a.m. and 5:00 p.m. on Monday through Friday. No work shall be done on holidays, Saturdays or Sundays except as specifically requested and authorized by the City. C. Under no circumstances will the contractor be paid at a premium or overtime rate for any work performed without the express advance authorization of the City. D. The Contractor is responsible for the security of partially completed work until the project is finally accepted by the City.
Conduct of the Work. Dendreon shall undertake and conduct the work, including the Clinical Trials, as set forth in the Collaboration Research Plan in accordance with appropriate standards articulated in current good clinical practices (GCP), current good manufacturing practices (GMP) and current good laboratory practices (GLP). Dendreon will use reasonable efforts to carry out the work in accordance with the Collaboration Research Plan.
Conduct of the Work. Except as otherwise provided in this Article XIV, the conditions under which any Work is to be performed and the method of proceeding with and performing the same shall be governed by all of the provisions of Article IX hereof.
Conduct of the Work. 11.1 SUBCONTRACTOR agrees to be bound by all rules and regulations of Federal, State and local laws, codes And ordinances applicable to the Work. 11.2 SUBCONTRACTOR is an independent contractor and shall be responsible for all construction means and Methods employed in the Work, the direction of its employees, sub-subcontractors and suppliers. SUBCONTRACTOR shall enforce compliance by its employees, sub-subcontractors and suppliers with those Regulations and practices set forth herein and shall remove or cause to be removed from the Project premises any such Employee whose presence is detrimental to safety or the orderly prosecution of the Work. 11.3 Prior to commencing the Work, SUBCONTRACTOR shall furnish to CONTRACTOR, upon request, the Name, qualifications and experience of a competent superintendent who shall be acceptable to ▇▇▇▇▇▇▇▇▇▇, with whom CONTRACTOR may communicate relative to the performance of the Work. The superintendent shall be present at the Project at all times during the course of the Work.
Conduct of the Work. Contractor shall: • Do all things necessary to faithfully perform and c manner. mplete the Work in a competent sa • All work shall be performed by experienced personnel directly employed and supervised by the Contractor. The Contractor shall provide management and technical supervision daily through competent supervisor as required • The Contractor shall be responsible for the skills, methods and actions of all employees. • The Contractor shall cooperate to enable the Administrator to determine the Contractor’s conformity wi h these specificatio s and the adequacy of the work being performed. The Contractor shall give personal daily supervision of the work and be available for consultation with the Administrator or an engineer or inspector designated by Administrator. • Submit all required samples, product data, certificates, operations and maintenance instr ctions, guarantees, and other submittals no later than five (5) days after the date the City issues a Notice to Proceed. • Ensure all necessary permits and approvals for the Work have been obtained. • Protect all materials to be used in the Work in accordance with the specifications. • Protect existing facilities and personal property. • Remove from the project site all debris resulting from performance of the Work no less often than daily. If Contractor fails to do so, City may, after twenty-four (24) hours' notice to Contractor, clean up the site and deduct the cost from the Contract Price. • For projects scheduled to require more than three (3) days to complete, prepare and submit a written daily activity report to City for each day on which work is performed, including weekends and holidays when worked, and submit the reports to the City no later than the next day that the City is open for business. The daily reports shall, at a minimum, include the following information: construction activities and locations, start or completion of activities, progress on construction activities (including units o portions of work completed), tests or inspections performed, deliveries of material or equipment, delays or potential delays, visitors to the site, weather conditions, construction equipment used, and personal injuries or damage to property. • Unload, hoist and otherwise handle its own materials, supplies and equipment. • Keep itself fully informed of all applicable laws including existing and future state and federal laws and county and municipal ordinances and regulations which in any manner affect tho...
Conduct of the Work. In undertaking this work, the service provider will report to the CEO through the Manager, Human Resource. The Manager, human resource as the client will only accept the work once satisfied with the quality of the output.
Conduct of the Work. Upon termination of this Agreement, EID shall promptly remove and close the MW-15 in accordance with all applicable laws and shall leave the Property in substantially the same condition as existed on the Property before this Agreement.
Conduct of the Work. 3.1 CDKX shall carry out the Work with all due and reasonable diligence and despatch. 3.2 CDKX shall keep APL informed on all matters related to the Work within the knowledge of CDKX and shall answer all reasonable enquiries received from APL. 3.3 The parties shall procure that their respective representatives will meet at the interval specified in the Implementation Plan and after live running of the System to discuss and minute the progress of the System's development. 3.4 CDKX shall, if reasonably practicable, attend any other meetings (by telephone if necessary) convened by APL and shall advise and assist APL on all matters relating to the duties and obligations it has assumed under this Agreement at a time reasonably convenient to both parties.
Conduct of the Work. 9.1 Scope of the Work (Refer Concept plan 2017.1053 attached ): (1) Construct an access road, ▇▇▇▇▇ Place between Flinders Street and Yanikas Drive, plus a heavy vehicle parking bay/pull-off/rest area being 3 lanes wide on the western side of ▇▇▇▇▇ Place and a single lane truck parking bay on the eastern side of ▇▇▇▇▇ Place (2) Construct a new sealed junction with ▇▇▇▇▇ Place and Flinders Street (3) Alterations to Yanikas Drive to facilitate car/caravan pullover area/parking bay (3) Upgrade the Junction of ▇▇▇▇▇▇▇▇▇ Street and Yanikas Drive in 2 stages (This will require a separate Deed with DPTI to facilitate these works) 9.2 Work Start Date: To start within 3 years of the Commencement Date 9.3 Date for Practical Completion: To be completed within 2 years of the Work Start Date 10: SITE SURVEILLANCE AND HOLD POINTS Site Surveillance or Hold Point Required (Yes or no) Notice Period 10.1 Drainage installation prior to backfill Yes 7 Working days 10.2 Sub-grade inspection and proof rolling Yes 7 Working days 10.3 Testing of pavement layers Yes 7 Working days 10.4 Pre-seal inspection Yes 7 Working days 10.5 Spotting out prior to line marking Yes 7 Working days 10.6 Commissioning of road lighting Yes 7 Working days