Construction Operations. Construction of all Improvements shall be expedited so that none shall remain in a partially finished condition any longer than reasonably necessary for the completion thereof.
Construction Operations. Limited to areas required for new construction. No area outside construction limits may be used for any purpose by the Service Providers contractor or subcontractors. Contractors shall provide temporary partitions to prevent pedestrian traffic through work area when any work is required in corridors or beyond construction operations. a) Contractors shall confine their equipment, storage of materials and operations of their workmen to area of work, and shall not bring materials onto site until reasonably required for progress of Work. b) Storage space will be confined to area of Work. MPS assumes no responsibility for materials stored in building or on site. Contractors assume full responsibility for damage due to storing of materials.
Construction Operations. Construction operations shall be planned and organized to minimize conflicts with railroad operations. All operations are to be conducted in accordance with CSXT Safe Way policies and procedures, and are subject to CSXT approval. 1. Pre-construction conferences shall be held prior to beginning work on the right of way. Additional progress meetings and/or teleconferences may be required during the course of the work. Coordination shall be provided as outlined in CSXT MWI 1905. Complete work schedules will be presented at the pre-construction conference. The schedules are to be updated monthly at a minimum. 2. All construction operations shall be conducted in compliance with CSXT MWI 1905 and the CSXT Fiber Optic Program Safety Requirements approved 09-09-98, refer to Attachment No.
Construction Operations. To reconstruct ▇▇▇▇▇ ▇▇▇▇▇ Parkway along the frontage of the Land with a divided landscape median as depicted in Exhibit B attached requires removing the existing road. This will result in the closing of ▇▇▇▇▇ ▇▇▇▇▇ Parkway to existing traffic during construction. City and Owner acknowledge these constraints. As such, the plans and specifications will include measures for local traffic to be re- routed during construction.
Construction Operations. Construction activities that include significant noise generating activities will generally occur between the hours of 7:00 a.m. and 7:00 p.m., unless dusk occurs later. While not anticipated, in the event construction needs to occur outside of these hours or after dusk, residences within ¼ mile of where such activities are actually occurring within the Site will be notified. Developer shall not deploy significant noise generating mechanisms to protect the solar array from damage during hailstorms, such as the use of so called “cranberry cannons” or similar devices.
Construction Operations. 2.01 All delivery of materials to the site shall be to the loading dock. No materials may be delivered through the main entrance doors or through any building lobbies. The Contractor must have its own supervisor on-site at any time material is delivered or moved. 2.02 Deliveries and movement of materials into and out of the Property or Building must be done prior to 7:30 am. Monday through Friday unless otherwise approved by Project Manager. 2.03 Any work which requires access to another tenant's space e.g. floor coring. plumbing, etc., must be scheduled with the Project Manager. This work will be done during premium time hours, most likely on a Saturday or Sunday. 2.04 The Contractor and all subcontractors will use rubber wheeled carts when moving material through the Property or the Building or removing trash from the Property or the Building. 2.05 Protection of all public corridor surfaces and elevator lobbies is the responsibility of the Contractor. Masonite floor protection and cardboard wall protection will be required throughout the period of work. 2.06 The Contractor is responsible for having "walk-off" mats at the exit(s) from the Tenant construction area. If necessary, mats are to be wetted to reduce the tracking of dust and debris outside the construction area. 2.07 The Contractor is responsible for vacuuming public corridors as necessary (at least daily). Contractor is to provide vacuum. 2.08 Under no circumstances will construction debris be allowed to remain in the Property or Building longer than twenty-four (24) hours. The construction area shall be kept clean and organized at all times. 2.09 Any construction worker caught stealing, drinking alcohol, or using any 66 illegal substance will be immediately banned from the Property. Expected behavior in a fully-occupied building is to be professional, especially in public. 2.10 While on-site, construction workers will be confined to the construction area only and all personnel involved in work shall park in the general parking area of the Property or as the Property Manager may from time to time designate. 2.11 Absolutely no food, beverages, or smoking will be allowed on the construction site after painting or installation of carpet has begun. 2.12 Electrical Contractor as part of his contractual obligation will advise Manager of meter(s) number for the Tenant improvement. 2.13 No cooking of any kind will be allowed on the construction site or Property. 2.14 Radios will not be allowed. 2.15 Noi...
Construction Operations. The construction of the joint box and manhole comprises the following operation: - (a) The digging of pilot holes to determine the proper location of the works. (b) The excavation of the required trench. (c) The construction of the joint box or manhole as per the standard drawing.
Construction Operations. A. Do not open the trench any further ahead of pipe laying operations than is necessary. Backfill and remove excess material immediately behind laying operations. Complete excavation and backfill for any portion of the trench in the same day. B. Construction operations shall be limited to 400 feet along the water main route, including clean-up and utility exploration. C. The Contractor shall insure that all work areas and roadways are free from excess excavated material, debris, mud, soil, rocks etc. at the end of each work day. Contractor shall be responsible for sweeping all areas at the end of each work day.
Construction Operations. 6.8.1 CONTRACTOR will confine operations at the Project Site to those areas permitted by all Legal Requirements, and will not unreasonably encumber the Project Site with 6.8.2 CONTRACTOR will establish the exterior lines and elevations of all buildings and structures to be erected on the Project Site, and lines and grades of site work such as roads, utilities, and site grading, based on reference points, the location of existing structures and improvements, or benchmarks identified in the site surveys provided by the OWNER. CONTRACTOR will provide a professional certification by a professional engineer or land surveyor as to the actual location of building lines prior to constructing any foundations. CONTRACTOR will establish the building grades, lines, and levels, and column, wall, and partition lines required by Sub-contractors in laying out the Work. At the completion of the Work, CONTRACTOR will provide another professional certification by a registered engineer or land surveyor as to the location of completed improvements in relation to property lines, building lines, easements, and other boundaries. 6.8.3 CONTRACTOR will not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor will CONTRACTOR subject any part of the Work, the Project Site, or adjacent property to stresses or pressures that will endanger it. 6.8.4 Except as otherwise provided in the Contract Documents, all Work will be performed solely during Working Hours, unless (i) more restrictive hours are required by City ordinances or other Legal Requirements governing CONTRACTOR’s performance of the Work, or (ii) the Contract Administrator approves expanded Working Hours in writing, such as in the event of emergencies, in which instance the Contract Administrator’s approval may be terminated at any time and for any reason without recourse to CONTRACTOR. The OWNER has the right to impose further restrictions on working hours reasonably related to the use of occupied facilities. No delays resulting from compliance with applicable Legal Requirements may form the basis for any claim by CONTRACTOR for delay damages or additional compensation or for any extensions of the Contract Time; any delays arising from restrictions related to the use of occupied facilities are non-compensable and any claims for extensions of the Contract Time relating to them will be filed in accord with Article 11 or the same will be conclusively deemed to have been waive...
Construction Operations. During all times when construction activities are being performed CNGEPLJ shall provide, or shall require its contractors to provide, the following insurance coverage naming City and CNG, as applicable, as additional insureds: Builders All-Risk Coverage contract amount Commercial general liability $1,000,000 per occurrence, $2,000,000 aggregate Business automobile liability $1,000,000 per occurrence Workers’ Compensation: statutory limits