Documents Constituting the Contract. 4.1 The following documents together constitute the Contract:
Documents Constituting the Contract. 4.1 The following documents together constitute the Contract:
a. this document that consists of Part A and Part B, entitled “Umbrella Contract for the Supply, Transport and Installation of Components for Hydro Power Plant”;
b. Annex 1 – Price List: List of Components with related Prices which include Supply, Transport and Installation ;
c. Annex 2 - Draw Down Orders issued in accordance with Clause 8,
e. Annex 4 – Health, Safety and Environmental Terms
f. Annex 5 – Local Activation Letter, if any, provided it has become effective in accordance with Clause 7; g. Annex 6 - Form of Acceptance Certificate h. Annex 7 – Insurance Requirements.
i. Annex 8 - Enel Group General Contract Conditions with the relevant Country Annex available on ▇▇▇▇▇://▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇▇.▇▇▇/it/documenti.html (hereinafter the “GCC”).
Documents Constituting the Contract. The following are to be considered collectively as one agreement/contract and the term Contract whenever used herein shall be deemed to include all such documents: • this ATTACHMENT A – Mutual Promises and Agreements; • ATTACHMENT B – Scope of Work (“Scope of Work”); • EXHIBIT A – Accounting Codes and Budget; • EXHIBIT B – Consultant Credentials; • EXHIBIT C – Certificate of Insurance; and (where applicable) • EXHIBIT D – ; and • EXHIBIT E – .
Documents Constituting the Contract. This Agreement and the following documents shall constitute the contract documents:
(1) Letter of Acceptance;
(2) Bidding Letter and its attachments;
(3) Special Terms and Conditions of the Contract and attachments thereto;
(4) General ▇▇▇▇▇ andConditions of the Contract;
(5) Technical Standards and Requirements;
(6) Drawings (approved drawings provided by the Employer to the Contractor);
(7) Priced Bill of Quantities or Budget Statement;
(8) Production Base Project for Optical Communication Products of GLOBAL Technology
(9) RFI documents 1 of GLOBAL Technology Inc.
Documents Constituting the Contract. In derogation of Article 4.2.1 of the NF P 03-001 standard, the constituent documents of the contract are as follows in order of priority (only the original copy of each of the documents below held in the Contracting Party’s archives is deemed authentic):
Documents Constituting the Contract. 2.1 If, after this Contract is formed, the Supplier discovers a discrepancy within the documents forming the Contract which is not resolved by the order of precedence in the Formal Instrument of Agreement, the Supplier must immediately seek SCE’s instructions to resolve the discrepancy.
2.2 The Supplier must comply with SCE's instructions and is not entitled to any Claim in relation to the instructions and the resolution of the discrepancy referred to in clause 2.1.
2.3 Subject to SCE giving the Supplier instructions to the contrary, the discrepancies within the documents forming the Contract referred to in clause 2.1 will be resolved by applying the following rules:
(i) the requirement that requires the higher standard of materials prevails;
(j) the requirement that requires the higher standard of workmanship prevails;
(k) the requirement that requires the most work prevails;
(l) the requirement that requires the higher capacity or higher performance prevails; and
(m) if there is any discrepancy between the drawings and the specification which is not resolved by applying the rules in paragraphs (i) to (l), then:
(i) the specification will take precedence over the drawings;
(ii) large scale drawings and detail drawings will take precedence over small scale drawings; and
(iii) figured dimensions will take precedence over scaled dimensions.
Documents Constituting the Contract. 4.1 The following documents and drawings (herein collectively called "the Contract Documents") constitute and contain the terms of the Agreement between the parties hereto (herein and in the other Contract Documents sometimes referred to as "the Contract") for the performance of the project: