Drawing Review Clause Samples

Drawing Review. Upon a determination by the Connecting Transmission Owner that a package is complete, the Connecting Transmission Owner shall commence its review of such package. After completing its review of a package, the Connecting Transmission Owner shall send written notice to Developer detailing the deficiencies and non-conformance with the Connecting Transmission Owner’s criteria and specifications and applicable design requirements, and shall send copies of any relevant design criteria documents and information. After correcting any deficiencies and non-conformance, Developer shall submit revised design criteria information to the Connecting Transmission Owner for further review and acceptance.
Drawing Review. The Consultant shall provide engineering services to complete a shop drawing review for bridge and structural component submittals.
Drawing Review. Review by Company of any drawing(s) submitted by Contractor is only to determine the general conformance with the design concepts and shall not relieve Contractor of its responsibility to comply with all requirements of the Contract and for the accuracy of the drawings or the materials fabricated from such drawings.
Drawing Review. A. Drawings and documents submitted for PURCHASER’S review will be returned to SOIL CONTRACTOR with two (2) stickers on each document. One (1) sticker will indicate the equipment tag number and PURCHASER’S SOIL CONTRACTOR print Jog number. The second sticker will indicate, by ▇▇▇▇, one (1) of the following review codes: Code 1 Work may proceed. Code 2 Revise and resubmit. Work may proceed subject to incorporation of changes indicated Code 2b Revise. Incorporate changes as indicated. Resubmittal not required. Work may proceed. Code 3 Revise and resubmit. Work may not proceed. Code 4 Review not required. Work may proceed. Although work may proceed on receipt of a drawing with a Code 2 notation, SOIL CONTRACTOR must resolve the comments indicated, resubmit and obtain a Code 1 notation. Any drawing or document receiving a review Code 2 or 3 must be resubmitted until it achieves either a Code 1 or 4 review status. Final invoice will not be processed until all drawings and documentation requirements are fulfilled. B. All SOIL CONTRACTOR data will be logged in and assigned a unique log number by the PURCHASER, Subsequent submittals of the same documents will receive the same log number, which was assigned to the initial submittal, except that the submittal number will be changed. For example, the initial drawing received would be assigned: On subsequent submittals, only the submittal will change. If the SOIL CONTRACTOR incorporates this data into a manual, the data becomes part of the manual and the manual is togged in and assigned its own log number. Code 1 or 4 approval of a manual does not eliminate the requirements for all individually submitted documents to receive a Code 1 or 4 review code. Status and Log Sticker Sample ¨ 1. Work may proceed Date Received: ¨ 2. Revise & Resubmit. Work may proceed. Subject to incorporation of Changes as indicated. IMPORTANT: Permission to proceed does not constitute acceptance or approval of design details, calculations, analysis, test methods or materials developed or selected by the supplier and does not relieve supplier from full compliance with contractual obligations. DWG. Status ¨ 2b. Revise, Incorporate changes as indicated. Resubmittal not required. Work may proceed. Signed ¨ 3. Revise & Resubmit. Work may not proceed. Date ¨ 4. Review not required. Work may proceed BECHTEL Job & V. P. NO Equipment # 1. Reason for resubmittal ¨ Bechtel Design ¨ Supplier Design ¨ Supplier Correction ¨ Client Required ¨ Not Necessary C...
Drawing Review a) S-321: New metal bollards (protective pipe barriers) detail shall be surface mounted and bolted, not recessed as shown on Detail 3. Please let us know if you require any further information or clarification regarding our review and due diligence at this Permit Document Phase. Respectfully, ▇▇▇▇▇ ▇▇▇▇▇▇▇▇ Senior Vice President HILLSBOROUGH COUNTY AVIATION AUTHORITY | GMP PROPOSAL | 1 Project No. 6505 17 | March 20, 2018
Drawing Review. Final review of architectural drawings for fire protection and life safety issues.
Drawing Review. The Engineer shall review and approve all shop drawings provided by the State, prepared and submitted by the contractor or fabricator of materials and work related to the construction of this project.

Related to Drawing Review

  • Log Reviews All systems processing and/or storing PHI COUNTY discloses to 11 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY 12 must have a routine procedure in place to review system logs for unauthorized access.