ENGINEERING WORK Clause Samples

ENGINEERING WORK. The Contractor shall properly and accurately lay out the work, perform all engineering work, and furnish all engineering materials and equipment required to establish and maintain all lines, grades, dimensions and elevations called for in the drawings or required in the progress of construction, unless otherwise noted in the contract documents. The Contractor will be held definitely and absolutely responsible for any errors in lines, grades, dimensions and elevations and shall at once, on instruction from the Project Manager, correct and make good such errors or any errors, or faults in the work resulting from errors in engineering performed under the requirements of its contract to the entire satisfaction of the Project Manager. Full compensation for the work shall be included in the prices paid for contract items of work. No additional allowance will be made for the correction of incorrect engineering work. 5.9.3.1 The Project Manager shall furnish the requisite bench elevations. 5.9.3.2 The Contractor shall locate and verify all lines, grades, dimensions and elevations indicated on the drawings before any excavation, or construction begins. Any discrepancy shall be immediately brought to the attention of the Project Manager; any change shall be made in accordance with the Project Manager’s instruction. 5.9.3.3 The Contractor shall verify all street survey monuments (horizontal and vertical alignment) prior to final acceptance by the Project Manager in accordance with any governmental requirements. 5.9.3.4 The Contractor shall provide a surveyor or Civil Engineer licensed in the State of Hawaii to verify and establish all lines, grades, dimensions and elevations.
ENGINEERING WORK. The DHHL may engage the Consultants for limited construction observations to supplement the inspections performed by the State and respective Counties. The Consultant’s authority shall be as described in the DHHL Interim General Conditions 5.4.
ENGINEERING WORK. The Contractor shall properly and accurately lay out the work, perform all engineering work, and furnish all engineering materials and equipment required to establish and maintain all lines, grades, dimensions and elevations called for in the drawings or required in the progress of construction, unless otherwise noted in the contract documents. The Contractor will be held definitely and absolutely responsible for any errors in lines, grades, dimensions and elevations and shall at once, on instruction from the Project Manager, correct and make good such errors or any errors, or faults in the work resulting from errors in engineering performed under the requirements of its contract to the entire satisfaction of the Project Manager. Full compensation for the work shall be included in the prices paid for contract items of work. No additional allowance will be made for the correction of incorrect engineering work.
ENGINEERING WORK. 2.1. Subject to the terms and conditions of the Agreement and any delays caused by Uncontrollable Conditions, promptly after the Closing Date of the Agreement, Vendor shall commence the Engineering Work required to, where applicable, assess, evaluate, plan and tender the work necessary to complete the Relocation/Demolition Work set out in Section 4.2 below.
ENGINEERING WORK. STATE OF HAWAII
ENGINEERING WORK. As part of Contractor's design and engineering services, Contractor will prepare heat and material balances and design calculations, prepare flow and process diagrams, and one-line diagrams, prepare electrical, structural, foundation, piping and instrument drawings, prepare general arrangement drawings and plot plans for the Facility, make drawings and prepare specifications of all equipment and materials and prepare the other Drawings and Specifications required in order to comply with Good Industry Practices in the performance of the Work, including all interconnections, and furnish necessary technical and Quality Control inspection services. Such engineering services shall include a review and approval of the engineering of the HRSG and its auxiliary equipment.
ENGINEERING WORK. As of the Effective Date, the engineering work for the Infrastructure Work as described in Schedule 2.5.2(B) (the “Engineering Work”) and for the Monument Trailhead Improvements (as defined below) have not commenced, and will not be commenced by Seller or Master Developer. From and after the Effective Date, Buyer shall have the right to and shall be responsible for pursuing and negotiating any and all engineering, architect and other consultant contracts necessary for the Engineering Work (collectively, the “Engineering Contracts”). The cost of the engineering work for the Monument Trailhead Improvements shall be reimbursed to Buyer from the Monument Trailhead Subaccount (as described in Section 6.7.2 below). ▇▇▇▇▇’s pursuit and submission of any Engineering Work at any time prior to the Phase 2 Closing shall be subject to Seller’s prior review and approval pursuant to the Seller Review Standard (it being agreed that Seller’s approval rights under this Agreement shall terminate as of the Phase 2 Closing).

Related to ENGINEERING WORK

  • THE WORK The Work comprises the completed construction required by the Contract Documents and includes all labor necessary to produce such construction, and all materials and equipment incorporated or to be incorporated in such construction.

  • Extra Work At any time during the Term of this Agreement, City may request that Consultant perform Extra Work. As used herein, “Extra Work” means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.