Work Required Sample Clauses

POPULAR SAMPLE Copied 1 times
Work Required. The City requires that the successful bidder perform a complete and satisfactory job in accordance with the Contract Documents.
Work Required. Required to pack, ship and receive all materials, pertaining to the Company. May be responsible for the receipt, pick-up and/or delivery and custody of all materials in his charge. Arrange for shipping of customers' parts and materials. To follow up on late or missing shipments, pickup and delivery of packages. Any other duties required by Supervisor.
Work Required. Employee may, at the City’s option, be required to work for the ▇▇▇▇▇▇▇ Police Department while attending the Training, and may be required to patrol, dispatch, operate computer systems, perform clerical tasks, or do other duties as assigned by the Chief of Police or the Chief’s designee. The hours expended by Employee in attending the Training and service to the ▇▇▇▇▇▇▇ Police Department will be subject to the same limitations and compensatory time policies as apply to all police officers of the City.
Work Required. The term “Work” includes all labor, materials, services, equipment, tools, transportation, power, water, permanent and temporary utilities, connections, provisions for safety, and all incidental and other things necessary to produce the finished construction of the Project as described by the Contract Documents. ▇▇▇▇ agrees to provide all labor, materials, equipment, tools and services necessary, and to do everything required by the Contract Documents as necessary to complete all Work required for the Project within the time specified for Substantial Completion and Final Completion of the Work.
Work Required. Buyer acknowledges that the locomotive requires modification of the couplers to conform to Union Pacific requirements for alignment control before placement for interchange. If it so chooses Buyer agrees to provide all required parts and labor to convert this locomotive to acceptable condition for interchange. If locomotive is modified for interchange, Seller agrees to place the Locomotive at the interchange of the Union Pacific Railroad in Portola, CA, at no charge to Buyer following acceptance of the Locomotive for interchange. Exact timing of interchange will be coordinated by the Seller and Buyer separate from this agreement.
Work Required. The Specifications and Drawings are intended to be complementary, and what is called for by either shall be as binding upon Contractor as if called for by both. The Work shall be complete in every detail. However, should any of the Work or any material be required which Work or material is not set forth in the Specifications or on the Drawings, either directly or indirectly, but which is nevertheless necessary for the proper carrying out of the intent thereof, including variations as may be necessary to conform to the conditions of the actual Work, Contractor agrees the same to be implied and required and shall perform all Work and furnish all such material as fully as if said Work and/or material were particularly delineated or described without additional costs to Owner. Contractor shall not be relieved of any obligations or responsibilities with respect to the Work except by written consent of Owner.
Work Required. Area A - 1.3ha – Intact peat with 0.75x0.75m semi impeded drains. This surface is very wet Area B - 3.7ha - Intact peat containing drains around 0.75x0.75m, standing dead trees and previously cut but still growing rhododendron clumps. This surface is very wet and soft. Area C - 13.0ha - Intact peat containing drains varying from 0.50x0.50m to 1x1m, mulched tree and rhododendron residues as well as rootstocks which will be above the surface in places. This surface is very wet and soft.
Work Required a. Research Title: "Development of Technologies that Control Scar Contracture after Burn Injuries " b. The contractor shall, for the period of six months following contract award, furnish the necessary personnel, facilities, equipment, and supplies to conduct Phase I of the study cited above. The statement of work, as contained in the contractor's proposal date submitted 27 June 2012 in response to the Army SBIR Solicitation No. 2012.2, Phase I that closed 27 June 2012, is incorporated by reference.
Work Required. Buyer acknowledges that the locomotive requires repairs to be ready for interchange. The Seller will provide assistance to the Buyer by allowing the Buyer or designated agents of the Buyer access to the Museum property and the locomotive. Any use of Museum assets, equipment and supplies for the repairs will be subject to a separate agreement and subject to reasonable fees where applicable under Seller’s policies. Outside of such agreement, any access to Museum assets, equipment and supplies for the repairs will be allowed only with express permission of the FRRS President or other designated official. Times and dates for access to the locomotive for repairs must be submitted to Seller at least 2 weeks ahead of time and be approved by Seller. Seller agrees to place the Locomotive at the interchange of the Union Pacific Railroad in Portola, CA, at no charge to Buyer following acceptance of the Locomotive for interchange. Exact timing of interchange will be coordinated by the Seller and Buyer separate from this agreement.
Work Required. A further inspection will be made approximately four weeks from the date of this letter and should there not be a marked improvement in the cultivation of the plot (at least % of