Generating Facility Location Clause Samples

Generating Facility Location. 2.5.1 This agreement is applicable only to the Generating Facility described below and installed at the above location. The Generating Facility may not be relocated or connected to AEC’s system at any other location without AEC’s express written permission. 2.5.2 This Agreement is applicable only to Renewable Electrical Generating Facilities, which includes biomass, solar thermal, photovoltaic, wind, geothermal, fuel cells (using renewable fuel), small hydroelectric generation, digester gas, municipal solid waste conversion, landfill gas, and any additions or enhancements using such technology. 2.5.3 Renewable Electrical Generating Facilities using fuel cells, municipal solid waste conversion, and small hydroelectric generating will be required to sign an Affidavit certifying the following criteria have been met: a) For purposes of this Agreement, qualifying “solid waste conversion” is defined pursuant to Public Resources Code Section 25741(b)(3). b) For purposes of qualifying under “fuel cell” using renewable fuels, the Generating Facility must use technology the California Public Utilities Commission (“Commission”) determines will achieve reductions in emissions of greenhouse gases and meet emissions requirements for eligibility for funding pursuant to the Self-Generation Incentive Programs.
Generating Facility Location. 2.5.1 This agreement is applicable only to the Generating Facility described below and installed at the above location. The Generating Facility may not be relocated or connected to SCE’s system at any other location without SCE’s express written permission. 2.5.2 This agreement is applicable only to solar and/or wind Generating Facilities, or a hybrid system of both with an aggregate capacity of 10 kW or less that is located on Customer’s premises as defined in SCE’s Electric Rule 1 Definitions and operates in parallel with SCE’s Distribution System
Generating Facility Location. 2.5.1 This agreement is applicable only to the Generating Facility described below and installed at the above location. The Generating Facility may not be relocated or connected to AEC’s system at any other location without AEC’s express written permission. 2.5.2 This agreement is applicable only to solar and/or wind Generating Facilities, or a hybrid system of both with an aggregate capacity of 1 megawatt (MW) or less that is located on Member’s premises as defined in AEC’s By-laws and Board Policies, as amended from time-to-time, and operates in parallel with AEC’s Distribution System.
Generating Facility Location. 2.5.1 This agreement is applicable only to the Generating Facility described below and installed at the above location. The Generating Facility may not be relocated or connected to SCE’s system at any other location without SCE’s express written permission. 2.5.2 This Agreement is applicable only to Renewable Electrical Generating Facilities, which includes biomass, solar thermal, photovoltaic, wind, geothermal, fuel cells (using renewable fuel), small hydroelectric generation, digester gas, municipal solid waste conversion, landfill gas, ocean wave, ocean thermal, or tidal current, and any additions or enhancements using such technology. 2.5.3 Renewable Electrical Generating Facilities using fuel cells, municipal solid waste conversion, and small hydroelectric generating will be required to sign an Affidavit (Form 14-912) certifying the following criteria have been met: a) For purposes of this Agreement, qualifying “solid waste conversion” is defined pursuant to Public Resources Code Section 25741(b)(3). b) For purposes of qualifying under “fuel cell” using renewable fuels, the Generating Facility must use technology the California Public Utilities Commission (“Commission”) determines will achieve reductions in emissions of greenhouse gases and meet emissions requirements for eligibility for funding pursuant to the Self-Generation Incentive Programs.

Related to Generating Facility Location

  • Project Location [Insert the location of the Project, if applicable]

  • Parking Facilities The parking facilities appurtenant to the Building include asphalt surface parking with some covered spaces (“Parking Area”). Tenant shall be entitled to use six (6) vehicle parking spaces within the covered portions of the Parking Area and fifteen (15) vehicle parking spaces within the uncovered portions of the Parking Area for the monthly parking of Tenant’s employees. Tenant’s use of the Parking Area shall be based upon a non-exclusive use in common with Landlord, other tenants of the Building, and their guests and invitees. Tenant shall not use more parking spaces than said number, or any spaces (a) which have been specifically assigned by Landlord to other tenants or for such other uses as visitor parking or (b) which have been designated by governmental entities of competent jurisdiction as being restricted to certain uses. Landlord reserves the right to erect such security and access and egress control devices as it may reasonably deem to be appropriate (including, without limitation card controlled gates) and Tenant agrees to cooperate fully with Landlord in such matters. Tenant shall not permit or allow any vehicles that belong to or are controlled by Tenant or Tenant’s employees, suppliers, shippers, customers, or invitees to be loaded, unloaded, or parked in areas other than those designated by Landlord for such activities. If Tenant permits or allows any of such prohibited activities, then Landlord shall have the right, without notice, in addition to such other rights and remedies that it may have, to remove or tow away the vehicle involved and charge the cost to Tenant, which cost shall be immediately payable upon demand by Landlord.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner. 4.1.2 The Interconnection Customer shall be responsible for its share of all reasonable expenses, including overheads, associated with (1) owning, operating, maintaining, repairing, and replacing its own Interconnection Facilities, and