Operating Requirements Any operating and technical requirements that may be applicable due to Regional Transmission Organization, Independent System Operator, control area, or the Connecting Transmission Owner’s requirements, including those set forth in the Small Generator Interconnection Agreement. Operating Requirements shall include Applicable Reliability Standards.
Trunking Requirements The Parties will provide designed Interconnection facilities that meet the same technical criteria and service standards, such as probability of blocking in peak hours and transmission standards, in accordance with current industry standards.
Maintenance Requirements The Contractor shall ensure and procure that at all times during the Maintenance Period, the Project Highway conforms to the maintenance requirements set forth in Schedule-E (the “Maintenance Requirements”).
Developer Operating Requirements The Developer must comply with the Transmission Owner’s operating instructions and requirements including but not limited to Transmission Owner’s Operation Coordination Agreement, as it may change from time to time. The Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. Whether or not the Large Generating Facility is eligible for the Transition Period LVRT Standard set forth in Appendix G will be determined by the Commission. The Large Generating Facility will comply with the Transition Period LVRT Standard pending issuance of an order by the Commission determining the appropriate LVRT standard. For purposes of compliance with Appendix G, the Transmission Owner has determined that the Developer shall maintain the Large Generating Facility in service during a three-phase fault for 7 cycles. Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. All personnel working in Transmission Owner’s facilities will require security background checks prior to entering and working in such facilities. New York Independent System Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Senior Vice President of Transmission New York Power Authority ▇▇▇ ▇▇▇▇ ▇▇. ▇▇▇▇▇ ▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇-▇▇▇▇ Re: Large Generating Facility Dear : On [Date] [Developer] has completed Trial Operation of Unit No. . This letter confirms that [Developer] commenced Commercial Operation of Unit No. at the Large Generating Facility, effective as of [Date plus one day]. Thank you. NYISO: