Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:
Surgery Services and Mastectomy Related Treatment This plan provides benefits for mastectomy surgery and mastectomy-related services in accordance with the Women’s Health and Cancer Rights Act of 1998 and Rhode Island General Law 27-20-29 et seq. For the member receiving mastectomy-related benefits, coverage will be provided in a manner determined in consultation with the attending physician, physician assistant, or an advance practice registered nurse and the patient, for: • all stages of reconstruction of the breast on which the mastectomy was performed; • surgery and reconstruction of the other breast to produce a symmetrical appearance; • prostheses; and • treatment of physical complications at all stages of the mastectomy, including lymphedema. See the Summary of Medical Benefits for the amount you pay.
Access Management The Engineer shall coordinate and evaluate access management within the project limits in accordance with the latest State Access Management Manual or as directed by the State.
Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.
Virus Management DST shall maintain a malware protection program designed to deter malware infections, detect the presence of malware within DST environment.