Information regarding Interconnection Facilities Sample Clauses

Information regarding Interconnection Facilities. 4.2.1 The RPD shall be required to obtain all information from the STU/CTU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the RPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the RPD at its own cost. 4.2.2 Penalties, fines and charges etc. imposed by the CTU/ STU under any statute or / guidelines in relation to delay in commissioning of the RE Project shall be entirely dealt by the RPD and any such amounts claimed by such agency(ies) shall be payable by the RPD. 4.2.3 The responsibility of getting connectivity with the transmission system up to the Interconnection Point, will lie with the RPD. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the RPD to be obtained at his own cost. The maintenance of transmission system up to the designated point as per the applicable terms and conditions shall be also the responsibility of the RPD to be obtained at his own cost. All costs and charges including but not limited to the wheeling charges and losses up to and including at the Interconnection Point associated with this arrangement will also be borne by the RPD. 4.2.4 In case of Pooling substation, losses in the transmission line shall be apportioned among the RPDs who share such a Pooling arrangement and duly signed by all RPDs, based on their monthly generation. 4.2.5 The arrangement of connectivity shall be made by the RPD through a dedicated transmission line. The entire cost of transmission including cost of construction of line, any other charges, losses etc. from the Project up to the Interconnection Point will be borne by the RPD. In case of non-availability of Grid and Transmission System during Term of this Agreement, for reasons not attributable to the RPD, provisions of Article 4.10 shall be applicable. 4.2.6 ISTS charges and losses on transmission of power, including waiver for RE power, shall be applicable as per extant regulations. Government of India/CERC at its sole discretion, from time to time, issue order for waiver of inter-state transmission system (ISTS) charges and losses on transmission of wind and solar power till a certain date. In case c...
Information regarding Interconnection Facilities. The Solar Power Developer shall be required to obtain all information with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the Solar Power Developer’s side of the Delivery Point to enable delivery of electricity at the Delivery Point.
Information regarding Interconnection Facilities. 4.2.1 The SPD shall be required to obtain all information from the STU/CTU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost. 4.2.2 Penalties, fines and charges, etc. imposed by the STU under any statute or guidelines in relation to delay in commissioning of the Project shall be entirely dealt by the SPD and any such amounts claimed by such agency(ies) shall be payable by the SPD. 4.2.3 The responsibility of getting connectivity with the transmission system up to the Interconnection Point, will lie with the SPD. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost. The maintenance of Transmission system up to the designated point as per the applicable terms and conditions shall be the responsibility of the SPD to be obtained at his own cost. All costs and charges including but not limited to the wheeling charges and losses up to and including at the Interconnection Point associated with this arrangement will also be borne by the SPD. 4.2.4 The arrangement of connectivity shall be made by the SPD through a transmission line. The entire cost of transmission including cost of construction of line, any other charges, losses etc. from the Project up to the Interconnection Point will be borne by the SPD. In case of non-availability of Grid and Transmission System during Term of this Agreement, for reasons not attributable to the SPD, provisions of Article 4.10 shall be applicable.
Information regarding Interconnection Facilities. The Developer shall be required to obtain all information with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the Developer’s side of the Delivery Point to enable delivery of electricity at the Delivery Point.
Information regarding Interconnection Facilities. 4.2.1 The SPD shall be required to obtain all information with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD‟s side of the Delivery Point to enable delivery of electricity at the Delivery Point. 4.2.2 The responsibility of getting connectivity and open access with the transmission system owned by the STU / CTU or any other transmission utility, as may be required, will lie with the SPD. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost. The maintenance of Transmission system upto the inter- connection point shall be the responsibility of the SPD. 4.2.3 The arrangement of connectivity can be made by the SPD through a dedicated transmission line which the SPD may construct itself or get constructed by STU or any other agency. The entire cost of transmission including cost of construction of line, wheeling charges, losses etc. from the Project upto the interconnection point will be borne by the SPD and will not be met by the STU. This connectivity can also be achieved through a shared line with any agency or any existing line of Discom or STU, provided the energy accounts are bifurcated and clearly demarcated for the power generated at solar project and are issued by the STU/ SLDC concerned. 4.2.4 The SPD may, however, shift interconnection point closer to its project if 33 kV (or above voltage level) substation comes closer to the Project during the tenure of PPA provided that the interconnection shall be maintained at 33 kV or above and energy at the project is clearly demarcated for the power generated at the solar project and energy accounts are issued by the STU/ SLDC concerned. The costs associated with this arrangement will also be borne by the SPD including the wheeling charges and losses up to the interconnect point. In case of nearby projects with Pooling point arrangement, the SPDs may decide to share the cost of transmission charges and other associated charges from the Pooling Point up to the Inter-connection Point, amongst themselves
Information regarding Interconnection Facilities. 4.2.1 The SPD shall be required to obtain all information from the STU/CTU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost. 4.2.2 Penalties, fines and charges imposed by the CTU/ STU under any statute or regulation in relation to delay in commissioning of Project shall be payable by the SPD to the extent the delay is attributable to the SPD. 4.2.3 The responsibility of getting connectivity with the transmission system up to the Interconnection Point as per the SPIA terms and conditions, will lie with the SPD. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost. The maintenance of Transmission system up to the designated point as per the terms and conditions of SPIA shall be the responsibility of the SPD. All costs and charges including but not limited to the wheeling charges and losses up to the Interconnection Point associated with this arrangement will also be borne by the SPD.
Information regarding Interconnection Facilities. The Procurer shall provide the Seller, on a timely basis, all information with regard to the Interconnection and Transmission Facilities as is reasonably necessary to enable the Seller to design, install and operate all interconnection plant and apparatus on the Seller's side of the Interconnection Point.
Information regarding Interconnection Facilities. 4.4.1 The SPP shall be required to obtain all information with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on both sides i.e. transmission side (Discom / Transco side ) and SPP‟s side (power plant side) of the injection Point to enable delivery of electricity to injection point / interconnection point.
Information regarding Interconnection Facilities. 4.2.1 The SPD shall be required to obtain all information from the SPIA/STU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD‟s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost. 4.2.2 Penalties, fines and charges imposed by the STU under any statute or regulation in relation to delay in commissioning of Project shall be payable by the SPD to the extent the delay is attributable to the SPD. 4.2.3 The responsibility of getting connectivity with the transmission system up to the Interconnection Point as per the SPIA terms and conditions, will lie with the SPD. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost. The maintenance of Transmission system up to the designated point as per the terms and conditions of SPIA shall be the responsibility of the SPD. All costs and charges including but not limited to the wheeling charges and losses up to the Interconnection Point associated with this arrangement will also be borne by the SPD. 4.2.4 [Not Used] 4.2.5 The arrangement of connectivity shall be made by the SPD through a dedicated transmission line as instructed by the SPIA. The entire cost of transmission including cost of construction of line, any other charges, losses etc. from the Project up to the Interconnection Point will be borne by the SPD. In case of non-availability of Grid and Transmission System during Term of this Agreement, for reasons not attributable to the SPD, provisions of Article 14 shall be applicable. 4.2.6 Interconnection Delivery point will be at the Grid substation and therefore from Generators substation/switchyard transmission line will be in scope of SPIA. The maintenance of Transmission system up to the Inter-connection Point shall be adhered to as per the Terms and Conditions of SPIA.
Information regarding Interconnection Facilities. 4.2.1 The SPD shall be required to obtain all information with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point.