Installation Planning Clause Samples

The Installation Planning clause outlines the requirements and procedures for organizing and scheduling the setup of equipment or systems at a project site. It typically details the responsibilities of each party in preparing for installation, such as providing site access, coordinating delivery of materials, and ensuring necessary utilities are available. By clearly defining these steps, the clause helps prevent delays, miscommunication, and logistical issues, ensuring that the installation process proceeds smoothly and efficiently.
Installation Planning. Post-Installation planning (includes testing and validation).
Installation Planning. To ensure trouble-free, efficient installation, inspect the vehicle and determine how and where the an- ▇▇▇▇▇, radio and accessories are to be mounted. It is possible to remote-mount the T2020II, T2040II and T2050II models as these have alphanumeric keypads, with the control head separate from the radio chassis. This enables the radio to be mounted in a discrete location, e.g. the rear luggage space, with the control head mounted in a convenient position for the vehicle’s occupants. See the M2000 service manual, available from your ▇▇▇▇ dealer, for details of this modification. Check that the chosen locations for the radio and accessories do not endanger the vehicle occupants. Overhead mounting is not recommended, especially without an additional safety strap. Check that the radio may be conveniently operated when seat belts are worn.
Installation Planning. To ensure trouble-free, efficient installation, inspect the vehicle and determine how and where the antenna, radio and accessories are to be mounted. It is possible to remote-mount the T2020II, T2040II and T2050II models as these have alphanumeric keypads, with the control head separate from the radio chassis. This enables the radio to be mounted in a discrete location, e.g. the rear luggage space, with the control head mounted in a convenient position for the vehicle’s occupants. See the M2000 service manual, available from your ▇▇▇▇ dealer, for details of this modification.
Installation Planning. Vendor will be responsible for the installation procedures and skill sets required for the project. Vendor will prepare Site-specific installation, test and acceptance documents, including rollback procedures, and conduct review with Owner prior to installation to get Owner approval. Vendor shall perform all integration of Vendor Equipment into the System with the support from Owner.
Installation Planning. Establish Meeting .
Installation Planning. The purpose of Installation Planning is to prepare detailed plans for each network element site. The planning will be preceded by a site survey. During the site survey the site is checked for compliance with the site requirements specified by MANUFACTURER for the network element in question. Telemetrix is responsible for site acquisition and construction works. The objective of the site survey is to obtain detailed information from a site to serve as the basis for the actual Installation Planning.
Installation Planning. Planning for and installing demonstration projects presents a specific set of logistical challenges but also numerous community- building opportunities. From material identification and storage, to permit applications and material construction and deployment, every step of the installation process should be considered as a tool for building social capital and community capacity.
Installation Planning. An estimated one day planning session to be held at the site of the installing county. The purpose of this session will be to assist the installing county in: 1) planning the implementation of a client-server capable local area network (LAN) or single personal computer, 2) reviewing application implementation procedures and responsibilities, 3) assessing the .approach for and effort of converting historical data, 4) scheduling system implementation, application training, and historical data conversion, and 5) scoping local system interfaces, if any.
Installation Planning 

Related to Installation Planning

  • Procurement Planning Prior to the issuance of any invitations to bid for contracts, the proposed procurement plan for the Project shall be furnished to the Association for its review and approval, in accordance with the provisions of paragraph 1 of Appendix 1 to the Guidelines. Procurement of all goods and works shall be undertaken in accordance with such procurement plan as shall have been approved by the Association, and with the provisions of said paragraph 1.

  • Installation Services The Bitstream 2a Service includes a Standard Install as set out below (in each case to the extent that the relevant provisioning works are not already complete for the relevant Service Order).1

  • Project Planning GOVERNMENTAL APPROVALS; ENVIRONMENTAL COMPLIANCE; PUBLIC INFORMATION 30 4.1 Planning and Engineering Activities 30 4.2 Site Conditions 30 4.3 Governmental Approvals 30 4.4 Environmental Compliance 34 4.5 Community Outreach and Public Information 35

  • Business Continuity Planning Supplier shall prepare and maintain at no additional cost to Buyer a Business Continuity Plan (“BCP”). Upon written request of Buyer, Supplier shall provide a copy of Supplier’s BCP. The BCP shall be designed to ensure that Supplier can continue to provide the goods and/or services in accordance with this Order in the event of a disaster or other BCP-triggering event (as such events are defined in the applicable BCP). Supplier’s BCP shall, at a minimum, provide for: (a) the retention and retrieval of data and files; (b) obtaining resources necessary for recovery, (c) appropriate continuity plans to maintain adequate levels of staffing required to provide the goods and services during a disruptive event; (d) procedures to activate an immediate, orderly response to emergency situations; (e) procedures to address potential disruptions to Supplier’s supply chain; (f) a defined escalation process for notification of Buyer, within two (2) business days, in the event of a BCP-triggering event; and (g) training for key Supplier Personnel who are responsible for monitoring and maintaining Supplier’s continuity plans and records. Supplier shall maintain the BCP and test it at least annually or whenever there are material changes in Supplier’s operations, risks or business practices. Upon ▇▇▇▇▇’s written and reasonable request, Supplier shall provide Buyer an executive summary of test results and a report of corrective actions (including the timing for implementation) to be taken to remedy any deficiencies identified by such testing. Upon ▇▇▇▇▇’s request and with reasonable advance notice and conducted in such a manner as not to unduly interfere with Supplier’s operations, Supplier shall give Buyer and its designated agents access to Supplier’s designated representative(s) with detailed functional knowledge of Supplier’s BCP and relevant subject matter.

  • Infrastructure Modification of the location and/or sizing of the infrastructure for the Project that does not materially change the functionality of the infrastructure.