Milestone Description Clause Samples

Milestone Description. Mobilization Permit in hand, have mobilization scheduled 100% Racking Installed All racking installed, all slip sheet installed, all ballast installed, all wind screens installed, all flashing completed and installed. Modules Mounted and wired All string wiring installed under panels, panel strings plugged together and optimizers installed but home run ends not connected to strings, all modules mounted and all clamps installed Inverters installed, wired and Monitoring All inverters set in place, all DC string wiring terminated into inverters, all DC strings connected at panels, all inverters programmed, all monitoring components installed, programmed, and showing on monitoring portal Exception: Monitoring systems must be physically installed to meet this milestone but if backfeed power is not available due to issues out of control of Contractor, achievement of this milestone shall still be considered met even without monitor reporting Substantial Completion All AHJ inspections complete, Utility interconnection/PTO issued/system operating, all AHJ certificates issued (electrical, building, and C of A), start up, commissioning, testing (including string and megger) complete and results sent to Plankton, punch list generated and given to installer, punch list repairs under way, all wiring tied up not touching roof, all labeling installed, As-builts submitted to Plankton, system complete and operating, possibly a few small punch list items to complete from QAQC walk. Final Completion All punch list/QAQC items complete, Facility manager sign off, site demobilized and cleaned up, system operating and production data verified, all invoices/change orders/lein wavers/ exhibits submitted and approved, QAQC signed off (any deficiencies have been corrected, pictures of corrections sent to QAQC, and QAQC signed off), binders complete and submitted.
Milestone Description. Project Start Project Complete $ 1/20/2020 12/31/2022 Environmental Information Please check the following environmental options. Grant Staff will contact Project Staff for more information. x Categorical Exclusion: Part C: Project have little to no environmental impact. This is often true for non-construction projects. By selecting this option, project staff is not required to provide additional documentation. Categorical Exclusion: Part D: Project may have some environmental impact that has not yet been determined. This is often true for projects with some form of construction activities. By selecting this option, project staff will be required to provide additional environmental documentation. Please contact grant staff for the appropriate forms and guidance. Class I (▇▇▇▇) Environmental Impact Statements: Project will have significant affect on the environment require an EIS. Projects like: rapid rail, light rail, commuter rail, automated guideway transit. Please contact grant staff for additional guidance. Class III (EAs). Environmental Assessments - Project in which the significance of the environmental impact is not clearly established. Please contact grant staff for additional guidance. Fleet Status: This table needs to be filled out if you are buying buses or rail vehicles. If buying replacements, please fill out figures for active and inactive fleet. If you are buying expansion vehicles, just fill out the active fleet portion. Budget Item # 47 Item Description or Purpose
Milestone Description. Masterplan and Feasibility Review [OPTIONAL] Completion of Design Documentation comprising masterplan and feasibility review (notionally 5%) for submission to the relevant siting board. Concept Design Report and cost estimates Completion of Design Documentation comprising Concept Design Report (notionally 30%) and cost estimates to achieve cost certainty of +/-10% for inclusion in Detailed Business Case and subsequent approvals in respect of the Works. Schematic Design Report and cost estimates Completion of Design Documentation comprising Schematic Design Report (notionally 50%) and updated cost estimates. Detailed Design Report and cost estimates Completion of Design Documentation comprising Detailed Design Report (notionally 90%, including specifications) and updated cost estimates. Tender Report and cost estimates Completion of Design Documentation (notionally 100%) for issue of tenders for Construction Contracts and updated cost estimates. Completion under Construction Contracts [OPTIONAL] As defined in the Construction Contract. Principal (Clause 19.1) .................................................................................................
Milestone Description. [Insert description of Milestone or cross refer to the relevant section of the Brief as appropriate] [insert]
Milestone Description. Responsible:
Milestone Description. RFP/IFB Issued Contract Award Date First Vehicle Delivered Last Vehicle Delivered Contract Complete Date $ For all other budget items that need Milestones, use the example below and change the Milestone descriptions as needed to relate to the project. (In some cases, all that is needed are two Milestones: Project Start and Project Complete.) Make a copy of the Milestone Description box for each additional set of Milestones you need to identify.
Milestone Description. Activities: ● Program preparation Deliverables: 1. Final Project Management Plan, including Work Plan, Implementation Plan, Monitoring, Evaluation and Learning (▇▇▇) Plan, and Risk Management Plan 2. Copy of project staff CVs and scopes of work Upon completion of the above milestone/ deliverables and their acceptance by the Grantor, a payment not to exceed local currency of IDR 364,387,775.00 be made to the Grantee. and will be implemented as follows:
Milestone Description. Activities: ● Conduct Pancasila module guideline workshops and module preparation. Deliverables:
Milestone Description. Zaxis or any of its subsidiaries, taken as a whole, obtaining five medical service providers (e.g., hospitals, clinics) as pilot customers within two years of Closing. Second Milestone Zaxis or any of its subsidiaries, taken as a whole reaching an agreement with an insurer or medical service provider (e.g., insurance company or HMO), insuring or serving at least 300,000 customers, within two years of Closing.

Related to Milestone Description

  • Milestone Schedule Please state the status and progress of each Milestone and identify any completed Milestone(s) for the previous calendar quarter.

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

  • SERVICE LEVEL DESCRIPTION The Fund Accounting Agreement is hereby amended by deleting the Service Level Description attached thereto and replacing it in its entirety with the Service Level Description attached hereto.

  • Product Description The lead products covered by this Settlement Agreement are limited to following Amazon Identification Number (ASIN) B07CYPCHM3, with the description, "60-40 Tin Lead Rosin Core Solder Wire with 2% Flux for Electrical Soldering and DIY, 2 Sizes, Include 0.6mm & 0.8mm, 2pcs (0.6mm&0.8mm Solder Wire)," which was offered for sale by the Settling Entity on ▇▇▇▇▇▇.▇▇▇, hereinafter the “Product” or “Products.”

  • Service Description 2.1 General