Need and Purpose. The Engineer, through coordination with the State, Agencies, and stakeholders, shall formally document the needs of the corridor as analyzed within the existing conditions and No-build analysis reports. The needs of the corridor shall be used to draft the purpose for continued study of the corridor to alleviate these needs. DocuSign Envelope ID: F30041C2-2CD0-40EA-B2F7-45DA235A97DB 1. Draft Need and Purpose Technical Memorandum 2. Final Need and Purpose Technical Memorandum
Appears in 1 contract
Sources: Contract for Engineering Services
Need and Purpose. The Engineer, through coordination with the State, Agencies, and stakeholders, shall formally document the needs of the corridor as analyzed within the existing conditions and No-build analysis reports. The needs of the corridor shall be used to draft the purpose for continued study of the corridor to alleviate these needs. DocuSign Envelope ID: F30041C2-2CD0-40EA-B2F7-45DA235A97DBDeliverables:
1. Draft Need and Purpose Technical MemorandumMemorandum (PDF only)
2. Final Need and Purpose Technical MemorandumMemorandum (5 copies and/or PDFs)
Appears in 1 contract
Sources: Contract for Engineering Services
Need and Purpose. The Engineer, through coordination with the State, Agencies, and stakeholders, shall formally document the needs of the corridor as analyzed within the existing conditions and No-build analysis reports. The needs of the corridor shall be used to draft the purpose for continued study of the corridor to alleviate these needs. DocuSign Envelope ID: F30041C2-2CD0-40EA-B2F7-45DA235A97DBAdditionally, the transportation goals and objectives to realize the expected corridor vision shall be included in the technical memorandum.
1. Draft Need and Purpose Technical MemorandumMemorandum (5 copies and PDF)
2. Final Need and Purpose Technical MemorandumMemorandum (5 copies and PDF)
Appears in 1 contract
Sources: Contract for Engineering Services