Construction Phase Services 3.1.1 – Basic Construction Services
Title Commitment and Survey (a) Buyer has received and reviewed a copy of the Title Commitment and the Existing Survey. Buyer is solely responsible for obtaining any updated title commitments, surveys, or any other title related matters Buyer desires with respect to the Assets at Buyer’s sole cost and expense. Buyer shall have until not later than 5:00 p.m. Eastern Time on the date that is no later than ten (10) days prior to the end of the Due Diligence Period (the “Title Report Objection Date”), to notify Seller’s attorney in writing (the “Title Report Objection Notice”) as to any items shown on the Title Commitment (as updated if applicable) that Buyer believes are not Permitted Exceptions. Buyer’s failure to timely deliver the Title Report Objection Notice on or prior to the 5:00 p.m. Eastern Time on the Title Report Objection Date shall constitute Buyer’s irrevocable acceptance of the Title Commitment and Buyer shall be deemed to have unconditionally waived any right to object to any matters set forth therein. If Buyer timely delivers a Title Report Objection Notice, Seller shall have seven (7) days after receipt of such notice to notify Buyer (i) that Seller will remove or cause to be removed such objectionable exceptions from title on or before the Closing, in which case the provisions of subsection 8.3(b) shall apply; or (ii) that Seller elects not to cause such exceptions to be removed at which time Buyer may elect, prior to the end of the Due Diligence Period, to accept the Title in its current condition or terminate this Agreement in which event the Deposit shall be promptly delivered to Seller and the parties shall have no further obligations to each other except for those that expressly survive the termination of this Agreement. Nothing in this subsection shall require Seller, despite any election by Seller to attempt to discharge any title exceptions, to take or bring any action or proceeding or any other steps to remove any title exception or to expend any moneys therefor, other than with respect to the Pre-Effective Date Seller Encumbrances, Post Effective Date Monetary Encumbrances and Post Effective Date Seller Encumbrances (as hereinafter defined) pursuant to Section 8.3 of this Agreement.
Project Closeout a. Participate in final inspection to prepare punch lists for project contractor to correct and/or to complete listed items. Verify that items on punch lists have been completed successfully assist COUNTY Project Manager or designee to determine completion date and coordinate project close out. a. Coordinate the preparation, acceptance and distribution of project closeout documents in accordance with COUNTY Project Manager or designee procedures to clients.
Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.
Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.