Phasing of Work. As part of the preparation of Construction Documents, and if so directed by the DISTRICT, the Construction Documents shall be prepared so that portions of the work may be deferred and performed at a later date under subsequent contracts. The DISTRICT shall provide such direction to ARCHITECT before commencement of work on the Construction Documents. In the event the DISTRICT provides direction after work on the Construction Documents has proceeded, such direction being to prepare the documents in a manner enabling the deferral of a portion of the work under a subsequent contract, ARCHITECT may be entitled to additional fees beyond the Basic Services Fees provided in this Agreement. In the event of the foregoing, the DISTRICT and the ARCHITECT shall mutually agree to the specific additional services that may be required and the corresponding fees. The phasing strategies to be indicated on the Construction Documents shall be consistent with the DISTRICT’S ability to fund the work. For the purposes of this Agreement the ARCHITECT may be required to furnish Construction Documents that enable the DISTRICT to bid and construct all of the work at a particular Project site in separate phases. The Construction Documents must be prepared in a manner that upon completion of each phase, the Project site is operable and can be approved by DSA and occupied by the DISTRICT. ARCHITECT shall review with Construction Manager and the DISTRICT and determine the requirements and approach for phasing of the work. ARCHITECT shall incorporate and prepare as part of the Construction Documents all design and documents necessary to enable construction phasing and logistics in order to obtain the minimum disruption of the educational program at the Project, to facilitate efficient construction, and to enable the construction of the Project within the duration prescribed by the Contract Documents.
Appears in 2 contracts
Sources: Architectural Services Agreement, Architectural Services Agreement
Phasing of Work. As part of the preparation of Construction Documents, and if so directed by the DISTRICT, the Construction Documents shall be prepared so that portions of the work may be deferred and performed at a later date under subsequent contracts. The DISTRICT shall provide such direction to ARCHITECT before commencement of work on the Construction Documents. In the event the DISTRICT provides direction after work on the Construction Documents has proceeded, such direction being to prepare the documents in a manner enabling the deferral of a portion of the work under a subsequent contract, ARCHITECT may be entitled to additional fees beyond the Basic Services Fees provided in this Agreement. In the event of the foregoing, the DISTRICT and the ARCHITECT shall mutually agree to the specific additional services that may be required and the corresponding fees. The phasing strategies to be indicated on the Contract Documents and Construction Documents shall be consistent with the DISTRICT’S ’s ability to fund the work. For the purposes of this Agreement the ARCHITECT may be required to furnish Construction Documents and Contract Documents that enable the DISTRICT Contractor to bid and construct all of the work at a particular Project site in separate phases. The Construction Documents and the Contract Documents must be prepared in a manner that upon completion of each phase, the Project site is operable and can be approved by DSA and occupied by the DISTRICT. ARCHITECT shall review with Construction Manager the DISTRICT and the DISTRICT Preconstruction Consultant and determine the requirements and approach for phasing of the work. ARCHITECT shall incorporate and prepare prepare, as part of the Construction Documents all design and documents necessary to enable the Contract Documents, the DISTRICT and Preconstruction Consultant’s recommendations regarding construction phasing and logistics in order an effort to obtain the minimum minimize disruption of to the educational program at the Project, to facilitate efficient construction, Project site and to enable expeditiously facilitate the construction of the Project within the duration prescribed by the Contract Documents.Project.
Appears in 1 contract
Sources: Architectural Services Agreement