Pole Foundations a. Existing foundations will be removed to a depth of 3 feet below the finished grade. Where a pole has to be replaced in place due to space constraint, the existing foundation will be removed entirely and new foundation installed in place. b. New standard pole foundations will be in accordance with MUNI Standard Drawing CL-7971, Rev.
Pole Foundations. A. OCS and other poles supported on Transportation Structures shall fail before their foundations and anchorages. The factored resistances of the foundations and anchorages as determined in accordance with CAN/CSA S6 shall be a minimum of 120% of the elastic factored resistances of the poles they support as determined in accordance with CAN/CSA S6. 1. The factored resistance of an OCS or other pole may be assumed to be limited to the factored resistance of a weaker link placed between the pole and pole anchorage/foundation which limits the amount of force that can be transferred between the pole and pole foundation/anchorage to the factored resistance of the link.
Pole Foundations.  After the conformed plan set for Phase 2 was distributed, it was determined that the light pole foundations would need to be deeper in the ground. An Engineering Supplemental Instruction was issued to the contractor to increase the depth of the light pole foundation by 2’ from 48” to 72”. The contractor provided a change order cost of $2,000.04 for this scope change. ▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇ Engineers, LLC, a ▇▇▇▇▇▇▇▇ & ▇▇▇▇▇▇, LLP sub-consultant, offered to pay for this additional cost via a credit for future work in the amount of $2,000. The $.04 difference between the contractor pricing and the change order amount is a result of tracking these changes on a per unit basis.
Pole Foundations. Billing Type Description Charge per Month per Unit FND-Flush-A Flush - Pre-fabricated - Style A Pole $10.23 FND-Flush-B Flush - Pre-fabricated - Style B Pole $9.22 FND-Flush-C Flush - Pre-fabricated - Style C Pole $10.84 FND-Flush-D Flush - Pre-fabricated - Style E Pole $10.23 FND-Flush-E Flush - Pre-fabricated - Style F Pole $9.22 FND-Flush-F Flush - Pre-fabricated - Style D Pole $8.98 FND-Reveal-A Reveal - Pre-fabricated - Style A Pole $10.87 FND-Reveal-B Reveal - Pre-fabricated - Style B Pole $11.61 FND-Reveal-C Reveal - Pre-fabricated - Style C Pole $11.61 FND-Reveal-D Reveal - Pre-fabricated - Style D Pole $11.61 FND-Reveal-E Reveal - Pre-fabricated - Style E Pole $11.61 FND-Reveal-F Reveal - Pre-fabricated - Style F Pole $10.14 FND-Screw-in Screw-in Foundation $5.70
Pole Foundations. The Contractor shall employ a professional service provider to assist with geotechnical studies and soil nomination and nominate the relevant foundation for a particular pole foundation, record shall be submitted as part of As built. The nominations shall be split between Rock, Type 1, Type 2, Type 3 and Type 4 as per the BOQ specifications.

Related to Pole Foundations

  • Foundations nor shall the Contractor be responsible for correction of leaks resulting from said failure.

  • Foundation In their respective agreements, the parties have recommended that a temporary manpower/resource pool of permanent employees be set up to cover normal absences (Section 20 of the Agreement). The parties agree that the employees working in such a pool can also be used to cover peak activities or in other temporary situations that call for extra ▇▇▇▇▇▇▇.

  • University Any notice may be served upon the University by delivering it, in writing, to the University at the address set forth on the last page of this Agreement, by depositing it in a United States Postal Service deposit box with the postage fully prepaid and with the notice addressed to the University at the aforementioned address, or by sending a facsimile of it to the University facsimile number set forth on the last page of this Agreement.

  • NO HARDSTOP/PASSIVE LICENSE MONITORING Unless an Authorized User is otherwise specifically advised to the contrary in writing at the time of order and prior to purchase, Contractor hereby warrants and represents that the Product and all Upgrades do not and will not contain any computer code that would disable the Product or Upgrades or impair in any way its operation based on the elapsing of a period of time, exceeding an authorized number of copies, advancement to a particular date or other numeral, or other similar self-destruct mechanisms (sometimes referred to as “time bombs,” “time locks,” or “drop dead” devices) or that would permit Contractor to access the Product to cause such disablement or impairment (sometimes referred to as a “trap door” device). Contractor agrees that in the event of a breach or alleged breach of this provision that Authorized User shall not have an adequate remedy at law, including monetary damages, and that Authorized User shall consequently be entitled to seek a temporary restraining order, injunction, or other form of equitable relief against the continuance of such breach, in addition to any and all remedies to which Authorized User shall be entitled.

  • REAL ESTATE LICENSE HOLDERS A BROKER is responsible for all brokerage activities, including acts performed by sales agents sponsored by the broker. • A SALES AGENT must be sponsored by a broker and works with clients on behalf of the broker. • Put the interests of the client above all others, including the broker’s own interests; • Inform the client of any material information about the property or transaction received by the broker; • Answer the client’s questions and present any offer to or counter-offer from the client; and • Treat all parties to a real estate transaction honestly and fairly.