Prepare Report Sample Clauses

The "Prepare Report" clause requires a party to create and deliver a formal document summarizing specific information or activities related to the agreement. Typically, this clause outlines the type of report to be prepared, the frequency or deadlines for submission, and the required content or format, such as financial statements, progress updates, or compliance summaries. By mandating regular or event-driven reporting, this clause ensures transparency and accountability between the parties, helping to monitor performance and address issues proactively.
Prepare Report. Within two (2) weeks of the sampling event, a comprehensive report will be prepared that summarizes the results of the sampling event.
Prepare Report. MSA will prepare a short technical memorandum with supporting tables and figures documenting the findings of the study. It is anticipated that this memorandum will be no longer than two pages, not including figures.
Prepare Report. Within four (4) weeks of the sampling event, a comprehensive report will be prepared that summarizes the results of the sampling event. The results of the on-site sampling will be used along with USEPA SCREEN3 dispersion modeling to show the maximum extent of odor impacts that may result based on the measured on-site odor emissions.
Prepare Report. Evaluate analysis results and develop conclusions about the impact VNM has on the application of solar for affordable housing. Special attention will be paid to the impact of applying VNM to individual service deliver points compared with applying VNM as a metering point for whole site.
Prepare Report. Consultant will prepare and submit a Draft Report to the City. We will incorporate comments received from the city and submit a Final Report. • Submit a Draft Report and a Final Report.
Prepare Report. Prepare a report documenting the work in Tasks 2 and 3 and making recommendations for PRV setting adjustments, noting any redundant PRVs, and any other recommended PRV modifications. A. Provide draft report for City review. B. Meet with City staff after a minimum two week review period to discuss the draft report. C. Prepare final report incorporating City comment. • Draft report. • Final report.
Prepare Report. The findings of Tasks 1 through 5 will be presented in a draft report. The report will summarize the data collection, evaluations, conclusions and recommendations of the study. Following Town review of the draft report, CDM ▇▇▇▇▇ will hold a workshop to discuss the Town’s comments. Comments will then be addressed and a final report submitted. CDM ▇▇▇▇▇ will provide an electronic copy and five hard copies of the draft report to the Town for review. One meeting is included in this task to discuss the draft report. After the meeting, CDM ▇▇▇▇▇ will address comments and prepare an electronic copy and five hard copies of the final report for the Town.
Prepare Report. Consultant shall prepare a report which presents the findings and recommendations of the pilot testing program described in this scope of services. consultant will prepare 4 hard copies of a pilot testing report in draft format and attend one meeting to discuss these findings. Consultant shall provide a draft report for review and shall update the report incorporating the comments discussed at review meetings and submit four (4) hard copies of the final report.
Prepare Report. Prepare and submit a Draft Report to the City. Incorporate comments received from the city and submit a Final Report. • Submit a Draft Report and a Final Report
Prepare Report. Contractor shall prepare and submit to District draft and final reports summarizing the analysis, results, findings, and recommendations of the study. Findings shall 1) address the adequacy of the existing pump station, 2) define the water level in the ▇▇▇▇▇ that should not be exceeded prior to precipitation events, and 3) describe potential flooding scenarios along ▇▇▇▇ Creek (including upstream of the Camino Alto Bridge) under a range of tidal and operating conditions. Recommendations shall be made, as indicated as appropriate by the study, for 1) pump station operation, 2) pump station modification, and 3) operation or modification of other flood control and drainage facilities to mitigate flooding along ▇▇▇▇ Creek (including upstream of the Camino Alto Bridge). The District shall have a minimum of 3 weeks to review and provide comment on the draft report prior to the Contractor incorporating comments into the final report. Deliverables: (2) – Draft Report, Final Report This is a time and materials contract with a maximum not to exceed sum indicated in Section 4 of this agreement. Payment shall be made to Contractor upon receipt of regular itemized invoices.