The Program/Production Reviews clause establishes the right for one or both parties to periodically assess the progress, quality, or compliance of a program or production. Typically, this clause outlines the frequency and format of such reviews, which may include scheduled meetings, submission of progress reports, or on-site inspections. Its core function is to ensure ongoing oversight and communication, allowing parties to identify and address issues early, thereby maintaining standards and minimizing the risk of project delays or non-compliance.
Program/Production Reviews. The contractor shall hold program reviews commencing after contract award which shall cover progress, schedules and problems. These reviews will be used to assess the contractor’s progress and status. During these reviews, the contractor shall provide, at a minimum, overall comprehensive status of:  Production, procurement and material issues;  Risk analysis activities;  Quality program status;  Defect reduction program status;  Safety program status;  Configuration management activities;  GFP status; and  Delivery schedules. For planning purposes, the program review location will be at the contractor’s facility. The contractor shall also conduct management meetings regarding delivery on a regular basis (to be mutually agreed upon between the Government and contractor) between the program reviews. The meetings will be conducted via teleconference or at the contractor’s facility. The contractor shall provide presentation material in accordance with CDRL A008. The Government shall reserve and exercise the right to hold additional informal reviews at mutually convenient times to follow progress and problems, which may exist. Attendance at program reviews may include Government personnel, Government support service contractor personnel, and other Government representatives as appropriate (contractor personnel are not permitted for all reviews addressing matters pertaining to competitive contracting and actual pricing).
Program/Production Reviews. The Production Readiness Review (PRR) will be conducted by the Government to ensure the Contractor has accomplished adequate production planning and preparations to produce LCU and associated components that meet performance requirements in accordance with the contract schedules and without unacceptable risks. During these reviews, the Contractor shall provide, at a minimum, overall comprehensive status of:  Production, Procurement and Material Issues  Subcontractor and Vendor Procurement  Integrated Master Schedule including the Critical Path  Make-or-Buy Program ChangesRisk Analysis Activities  Quality Program StatusDefect Reduction Program Status  Manufacturing Planning;  Manufacturing Schedules;  Configuration Management;  Quality Assurance;  Material Procurement & Supplier Control;  Facility and Equipment;  Production Processing & Fabrication;  Calibration, Tool and Test Equipment;  Non-Conforming Material Control  Completed Item Inspection and Test;  Handling, Storage and Delivery The Contractor shall demonstrate the ability to manufacture and test the LCU and associated components by providing various documents to include, but not be limited to, Manufacturing, Testing, Quality Assurance, Configuration Management, Calibration, and Supplier Management Plans. Policies, procedures, processes & plans demonstrating production processing & fabrication capability, facilities & equipment capacity, production scheduling, manpower resources & training, supplier management, parts & material procurement and shop loading will also be required. On-Site examination of the plans/documents described above, as well as examination of the manufacturing equipment and facility, review of support functions/groups, and interviews with project personnel, are all integral parts of the PRR. Processes must be able to produce repeatable conforming hardware within time constraints of the contract. During the PRR, the Contractor shall be prepared to discuss manufacturing & procurement planning status, issues, problems, risks and schedules associated with the production program, and provide requested supporting objective evidence. A successful review is predicated on the Government’s determination that there are no unacceptable risks, performance & quality requirements are fully met in the production configuration, and production capability demonstrates a satisfactory basis for proceeding into production. The Government in its sole discretion will determine wh...
Program/Production Reviews. The Production Readiness Review (PRR) will be conducted by the Government to ensure the Contractor has accomplished adequate production planning and preparations to produce MTP and associated cables that meet performance requirements in accordance with the contract schedules and without unacceptable risks. During PRR, the Contractor shall provide, at a minimum, overall comprehensive status of: • Producibility; • Manufacturing Planning; • Manufacturing Schedules; • Configuration Management; • Quality Assurance; • Material Procurement & Supplier Control; • Facility and Equipment; • Production Processing & Fabrication; • Calibration, Tool and Test Equipment; • Non-Conforming Material Control • Completed Item Inspection and Test; • Handling, Storage and Delivery The Contractor shall demonstrate the ability to manufacture and test the MTP and associated cables by providing various documents to include, but not be limited to, Manufacturing, Testing, Quality Assurance, Configuration Management, Calibration, and Supplier Management Plans. Policies, procedures, processes & plans demonstrating production processing & fabrication capability, facilities & equipment capacity, production scheduling, manpower resources & training, supplier management, parts & material procurement and shop loading will also be required. On-Site examination of the plans/documents described above, as well as examination of the manufacturing equipment and facility, review of support functions/groups, and interviews with project personnel, are all integral parts of the PRR. Processes must be able to produce repeatable conforming hardware within time constraints of the contract. During the PRR, the Contractor shall be prepared to discuss manufacturing & procurement planning status, issues, problems, risks and schedules associated with the production program, and provide requested supporting objective evidence. A successful review is predicated on the Government’s determination that there are no unacceptable risks, performance & quality requirements are fully met in the production configuration, and production capability demonstrates a satisfactory basis for proceeding into production. The Government in its sole discretion will determine whether the PRRs are successful. The Government will provide a report summarizing the proceedings and identifying deficiencies and issues, as applicable. The Contractor shall provide a written response within 30 working days that addresses all identified defici...

Related to Program/Production Reviews

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Concession Area, including its abandonment.