The 'Reducing fittings' clause defines the requirements and standards for the use of pipe fittings that connect pipes of different diameters within a system. It typically specifies the types of reducing fittings permitted, such as concentric or eccentric reducers, and may outline acceptable materials, installation methods, and pressure ratings. By establishing clear guidelines for these components, the clause ensures compatibility and safety in piping systems, preventing leaks or failures that could arise from improper connections.
Reducing fittings. Where fittings have reducing ends or branches they are described as 'reducing'. In the case of pipes with diameters not exceeding 60mm only the largest end or branch size is given. Should the Contractor wish to use other fittings and bushes or reducers he may do so on the understanding that no claim in this regard will be entertained. In the case of pipes with diameters exceeding 60mm all sizes are given and no claim for extra bushes, reducers, etc will be entertained.
Reducing fittings. Where fittings have reducing ends or branches they are described as 'reducing'. In the case of pipes with diameters not exceeding 60mm only the largest end or branch size is given. Should the Contractor wish to use other fittings and bushes or reducers he may do so on the understanding that no claim in this regard will be entertained. In the case of pipes with diameters exceeding 60mm all sizes are given and no claim for extra bushes, reducers, etc will be entertained. 22 15mm Pipe chased into brick walls. A1 : 2 A2 : 3 A3 : 2 A4 : 4 23 22mm Ditto. A1 : 2 A2 : 7 A3 : 2 A4 : 4 m 11 m 15 Section 2 Bill No. 10 Plumbing and Drainage (Provisional) 24 15mm Fittings. No 11 A1 : 2 A2 : 3 A3 : 2 A4 : 4 25 22mm Fittings. A1 : 2 A2 : 3 A3 : 2 A4 : 4 No 11 Carried to Collection Section 2 Bill No. 10 Plumbing and Drainage (Provisional) Section 2 Bill No. 10 Plumbing and Drainage (Provisional) Total Brought Forward from Page No. Section 2 Bill No. 10 Plumbing and Drainage (Provisional) 66 67 68 R Amount SECTION 2 BILL No. 11 PAINTWORK Note that the total quantity per each item is split into the various buildings and appears below each description as follows: A1 - DWG 04 - Staff Ablutions (2M2F1D) A2 - DWG 06 - Grade R Ablution (3R1T) A3 - DWG 14 - Male Ablutions (6B) A4 - DWG 35 - Female Ablutions (6G)
Reducing fittings. Where fittings have reducing ends or branches they are described as "reducing" and only the largest end or branch size is given. Should the contractor wish to use other fittings and bushes or reducers he may do so on the understanding that no claim in this regard will be entertained Fixing of pipes. Unless specifically otherwise stated, descriptions of pipes shall be deemed to include fixing to walls, etc, casting in, building in or suspending not exceeding 1m below suspension level. Pipes chased into brickwork must be wrapped with two layers of ▇▇▇▇▇ brown paper tied with wire. Rates are to include for wrapping around joints and fittings. Section No. 2 Bill No. 11 Plumbing & Drainage (Measured Provisionally) Water pipework is to be disinfected at completion. Pipes to be taped shall be coated with the appropriate primer and the tape shall be applied in the appropriate widths and with overlaps. Couplings and fittings to pipes shall be taped in strict accordance with the manufacturer's instructions. Prices for wrapping of pipes shall include for all work as described to couplings in the length. Laying, backfilling, bedding, etc of pipes: Pipes shall be laid and bedded in accordance with manufacturers' instructions and trenches shall be carefully backfilled. Where no manufacturers' instructions exist, pipes shall be laid in accordance with the relevant section of SANS 2001. Section No. 2 Bill No. 11 Plumbing & Drainage (Measured Provisionally) Descriptions of cast iron roof outlets shall be deemed to include joints to pipes and casting into concrete (adaptors for joints to PVC pipes, etc are given separately). Descriptions of overflow pipes where measured in number, shall be deemed to include joints to cisterns and splay cut ends. Descriptions of pipes laid in and including trenches and of inspection ▇▇▇▇▇▇▇▇, catchpits, etc shall be deemed to include excavation, bedding, backfilling, compaction to a minimum of 95% Mod AASHTO density and disposal of surplus material on site. Descriptions of service pipes and flexible connecting pipes shall be deemed to include connections to taps, cisterns, etc and to steel pipes (adaptors for connections to copper pipes, etc are given separately). Descriptions of WC pans, slop hoppers, etc shall be deemed to include for joints to soil pipes (pan connectors are separately measured). Ogee profile seamless aluminium guttering fixed to fascia boards (fascias esewhere measured). 1 125 x 85mm OGEE ▇▇▇▇▇ gutter m 155 2 75 x 50mm fl...
Reducing fittings. Where fittings have reducing ends or branches they are described as "reducing". In the case of pipes with diameters not exceeding 60mm only the largest end or branch size is given. Should the contractor wish to use other fittings and bushes or reducers he may do so on the understanding that no claim in this regard will be entertained. In the case of pipes with diameters exceeding 60mm all sizes are given and no claim for extra bushes, reducers, etc will be entertained Exposed surfaces of concrete stormwater channels, cover slabs, inspection eye marker slabs, ▇▇▇▇▇▇ tops, cleaning eye tops, catchpits, inspection ▇▇▇▇▇▇▇▇, etc shall be finished smooth with plaster No claim for rock excavation will be entertained unless the contractor has timeously notified the quantity surveyor thereof prior to backfilling Pipes shall be laid and bedded and trenches shall be carefully backfilled in accordance with manufacturers' instructions Where no manufacturers' instructions exist, pipes shall be laid in accordance with clauses 5.1 and 5.2 of each of the following: SABS 1200 L : Medium-pressure pipelines LD : Sewers LE : Stormwater drainage Pipe trenches etc shall be backfilled in accordance with clauses 3, 5.5, 5.6, 5.7 and 7 of SABS 1200 DB : Earthworks (Pipe trenches) Pipes shall be bedded in accordance with clauses 3.1 to 3.4.1, 5.1 to 5.3 and 7 of SABS 1200 LB : Bedding (Pipes). Unless otherwise described bedding of rigid pipes shall be class B bedding Section No. 5 Bill No. 3 STORMWATER (PROVISIONA) 1 110mm Slotted uPVC pipes laid in and including trenches not exceeding 1m deep, including 19mm crushed stone encasing size 300 x 300mm and Bidum Type U24 filter fabric blanket wrapped around encasing with 150mm side and 300mm end laps including stitching, complete with excavations and carting away of excavated material and backfilling of trenches with clean river sand m 200 25MPa/19mm unreinforced concrete with rounded salient edges and finished on exposed surfaces with 2:1 cement mortar, laid to falls in panels not exceeding 2m long with 12mm bitumen impregnated softboard movement joints with exposed edges raked out for a depth of 10mm and sealing with "Sikaflex-1a" joint sealant including all necessary formwork, excavations, compaction, etc 3 Surface channel size 1500mm wide x average 120mm thick with 50mm deep V-shaped waterway (concrete = 0,18 m3/m) m 240 4 Extra over 1200mm wide channel for closed ends, angle intersection, tee intersections, etc No 2

Related to Reducing fittings

  • Fittings 2.2.1 Support structure and attachment fittings for the flap structure 2.2.2 Support structure and attachment fitting for the engine pylons 2.2.3 Support structure and attachment fitting for the main landing gear 2.2.4 Support structure and attachment fitting for the center wing box

  • Fencing The SPD shall Fence the demarcated boundary of the Demised Premises at the SPD’s own expense in every respect.

  • FLOORING All Bed Rooms, Dinning-cum-Living, and would be finished with Ivory Vitrified tiles (24'' X 24'') flooring and 4'' skirting. Bath-room, Kitchen & Balcony would be finished with Ivory Ceramic tiles (12'' X 12'') flooring. The walls of the Toilets/Bathrooms would finish with white glazed tiles in 60'' height. Roof would be finished with roof tiles.

  • Plumbing fixtures and appliances shall be used only for the purposes for which designed, and no sweepings, rubbish, rags or other unsuitable material shall be thrown or deposited therein. Damage resulting to any such fixtures or appliances from misuse by a tenant or its agents, employees or invitees, shall be paid by such tenant.

  • Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.64 – DEBARMENT AND SUSPENSION CERTIFICATION (3/18). Pursuant to 2 CFR 180 and 2 CFR 417, Purchaser shall certify and obtain certifications from its Subcontractors regarding debarment, suspension, ineligibility, and voluntary exclusion, including additional Subcontractors obtained after award of this contract. “Subcontractors” are participants in lower tier covered transactions. Purchaser may rely upon a certification of a prospective Subcontractor that it is not proposed for debarment under 48 CFR 9.4, debarred, suspended, ineligible, or voluntarily excluded from participating in covered transactions or timber sales, unless Purchaser knows that the certification is erroneous. Purchaser shall keep the certifications of its Subcontractors on file until timber sale Termination Date and any extensions thereof, and will provide a copy at the written request of Contracting Officer. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this Subsection. The knowledge and information of Purchaser is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. If Purchaser knowingly enters into a timber sale transaction with a person who is proposed for debarment under 48 CFR 9.4, suspended, debarred, ineligible, or voluntarily excluded from participation in covered transactions or timber sales, in addition to other remedies available to the Government, Forest Service may pursue available remedies, including suspension and/or debarment. Contracting Officer shall provide a copy of Forms AD-1047 Certification Regarding Debarment, Suspension and Other Responsibility Matters – Primary Covered Transactions and AD-1048 Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – Lower Tier Covered Transactions to the Purchaser. Purchaser shall complete form AD-1047 and provide to the Contracting Officer upon request. Purchaser shall require each subcontractor to complete form AD-1048 and provide to the Contracting Officer upon request.