RESPONSIBILITY FOR AWARDS The Supplier acknowledges that each Contracting Body is independently responsible for the conduct its award of Call-Off Contracts under this Framework Agreement and that the Authority is not responsible or accountable for and shall have no liability whatsoever in relation to: 6.1 the conduct of Other Contracting Bodies in relation to this Framework Agreement; or 6.2 the performance or non-performance of any Call-Off Contracts between the Supplier and Other Contracting Bodies entered into pursuant to this Framework Agreement.
Responsibility for Subcustodians Except as provided in the last sentence of this Section 8.6, the Custodian shall be liable to the Fund for any loss or damage to the Fund caused by or resulting from the acts or omissions of any Subcustodian to the extent that such acts or omissions would be deemed to be negligence, gross negligence or willful misconduct in accordance with the terms of the relevant subcustodian agreement under the laws, circumstances and practices prevailing in the place where the act or omission occurred. The liability of the Custodian in respect of the countries and Subcustodians designated by the Custodian, from time to time on the Global Custody Network Listing shall be subject to the additional condition that the Custodian actually recovers such loss or damage from the Subcustodian.
Responsibility for Use (a) The Company alone will be responsible for furnishing, or arranging for a third party to furnish, all data and information required by the Documentation and the specifications therein for the Licensed System to function and perform in accordance with the Documentation, other than the data and information residing in the Licensed System in connection with BNYM’s performance of the Core Services. BNYM shall have no liability or responsibility for any Loss caused in whole or in part by the Company’s or a Permitted User’s exercise of the Licensed Rights or use of the Licensed System or by data or information of any nature inputted into the Licensed System by or under the direction or authorization of Company or a Permitted User; provided, however, this Section 2.5 shall not relieve BNYM of its obligation to act in accordance with its obligations under the Main Agreement. Company shall be responsible and solely liable for the cost or expense of regenerating any output or other remedial action if the Company, a Permitted User or an agent of either shall have failed to transmit properly and in the correct format any data or information, shall have transmitted erroneous or incorrect information or data, or shall have failed to timely verify or reconcile any such data or information when it is generated by the Licensed System (“Data Faults”).
Responsibility for Property Except as expressly set forth in Section 3.25, Contractor shall limit its operations to the Stage 2 Site. Contractor shall plan and conduct its operations so that neither Contractor nor any of its Subcontractors or Sub-subcontractors shall (i) enter upon lands (other than the Stage 2 Site and Off-Site Rights of Way and Easements) or waterbodies in their natural state unless authorized by the appropriate owner or entity; (ii) close or obstruct any utility installation, highway, waterway, harbor, road or other property unless Permits are obtained and authorized by the appropriate entity or authority; or (iii) disrupt or otherwise interfere with the operation of any portion of any pipeline, telephone, conduit or electric transmission line, ditch, navigational aid, dock or structure unless otherwise specifically authorized by the appropriate entity or authority. The foregoing includes damage arising from performance of the Work through operation of Construction Equipment or stockpiling of materials. If damage occurs to Subproject 1 or Subproject 2 prior to substantial completion of such applicable Subproject 1 or Subproject 2, liability for such damage shall be governed by the Stage 1 EPC Agreement.
Responsibility for Performance Participation in state Centralized Contracts by Authorized Users is permitted upon the following conditions: (i) the responsibility with regard to performance of any contractual obligation, covenant, condition or term thereunder by any Authorized User other than State Agencies shall be borne and is expressly assumed by such Authorized User and not by the State; (ii) a breach of the Contract by any particular Authorized User shall neither constitute nor be deemed a breach of the Contract as a whole which shall remain in full force and effect, and shall not affect the validity of the Contract nor the obligations of the Contractor thereunder respecting non-breaching Authorized Users, whether State or otherwise; (iii) for a breach by an Authorized User other than a State Agency, the State specifically and expressly disclaims any and all liability for such breach; and (iv) each non-state agency Authorized User and Contractor guarantees to save the State, its officers, agents and employees harmless from any liability that may be or is imposed by their failure to perform in accordance with its obligations under the Contract.