Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.
Continuing Professional Development If, during the life of the Agreement, Continuing Professional Development (CPD) is introduced for plumbers, all time spent in complying with the CPD obligations will be the responsibility of each plumber.
Professional Development 9.01 Continuous professional development is a hallmark of professional nursing practice. As a self-regulating profession, nursing recognizes the importance of maintaining a dynamic practice environment which includes ongoing learning, the maintenance of competence, career development, career counselling and succession planning. The parties agree that professional development includes a diverse range of activities, including but not limited to formal academic programs; short-term continuing education activities; certification programs; independent learning committee participation. The parties recognize their joint responsibility in and commitment to active participation in the area of professional development.
Sustainable Development 4.1 The Authority will review the Contractor’s Sustainable Development Policy Statement and Sustainable Development Plan submitted by the Contractor in accordance with the Schedule (Sustainable Development Requirements) and then at least annually thereafter. 4.2 Sustainable Procurement Risk Assessment Methodology (SPRAM) is a tool used by the Authority to identify and mitigate any potential risks to sustainability in contracts. The process requires that each Contract be assessed for its potential social, economic and environmental risks, throughout the various stages of its lifetime. Where risks are identified, appropriate mitigation action is required to reduce or eliminate the risk to sustainability. The Authority may at times require input from the Contractor in order to ensure that this process is given the required levels of consideration.
Joint Development If joint development is involved, the Recipient agrees to follow the latest edition of FTA Circular 7050.1, “Federal Transit Administration Guidance on Joint Development.”