Specific Project Data Clause Samples
The 'Specific Project Data' clause defines and records key information unique to a particular project within a contract. This typically includes details such as project location, start and completion dates, names of involved parties, and any special requirements or conditions relevant to the work. By clearly outlining these specifics, the clause ensures that all parties have a shared understanding of the project's essential parameters, reducing the risk of misunderstandings and disputes over project scope or obligations.
Specific Project Data. A. Owner: City of Mount ▇▇▇▇▇▇
▇. Title: ▇▇▇▇▇▇ Street Improvements
C. Description: Engineering design services for reconstruction of 1,100 linear feet of ▇▇▇▇▇▇ Street, north of its intersection with Intersetate 30 Service Road. Pavement reconstruction to include pulverizing, cement treating, reshaping of existing pavement, and concrete paving. Proposed pavement section is 24 feet wide with open channel road side ditches.
D. Number of Construction Contracts: 1
Specific Project Data. A. Title: Consulting services for the strategy, funding, financing, development, procurement, and implementation of the Fargo ▇▇▇▇▇▇▇▇ Metropolitan Area Flood Risk Management Project.
Specific Project Data. A. Owner: City of Mount ▇▇▇▇▇▇
▇. Title: Mount ▇▇▇▇▇▇ Design Guidelines and Engineering Standards
C. Description: Development of Design Guidelines and Engineering Standards for Water Utilities, Sanitary Sewer, Drainage, Sidewalks, Driveways and Streets.
Specific Project Data. A. Title: Husband St. Bicycle Corridor and Connection to Kameoka Trail
B. Description: Project will provide a low-stress bicycle corridor along Husband St. from 6th Ave. to Boomer Rd. by encouraging and supporting cyclist traffic while restricting and discouraging through traffic on Husband Street. Connecting Husband St. to the Kameoka Trail is included with the project. The project includes an estimated 1.16 miles of on-street bicycle facility improvements and 0.40 miles of off-street bicycle shared path improvements. Project services will include the following phases:
1. Study Phase
2. Public Involvement
3. Preliminary Design
4. Final Design 5. Bidding Phase
6. Construction/Post Construction
7. Project Administration
Specific Project Data. A. Title: South Lake WTP and 1178 Transmission Main
Specific Project Data. A. Title: South Lake Water Treatment Plant Intake and Raw Waterline
B. Description: Preliminary Engineering, Final Design, Bidding and Construction Services for the new South Lake Water Treatment Plant (SLWTP) raw water pump station and pipeline The plant will have a treatment capacity of 22 million gallons per day (MGD) with capabilities for expanding to 44 MGD in the future. The raw water supply facilities will include a raw water intake and pump station and 3,800 LF of raw water pipeline to carry water to the SLWTP. The SLWTP raw water pump station and raw water pipeline will be designed and packaged as two sets of construction documents. The work will be constructed in two separate construction contracts.
C. City of Georgetown Project Number: 2BN
D. City of Georgetown General Ledger Account No.: 660-9-0580-90-049 E. City of Georgetown Purchase Order No.:
F. Master Services Agreement, Contract Number: 2016-738-MSA
Specific Project Data. A. Title: Water Filter Replacement
B. Description: Design plans for permit approval.
Specific Project Data. 1.1. Title: 26th Street Guardrail
1.2. Description: Design improvments to the damaged guardrail spanning from 26th street to State St.
1.3. Fee Basis: Lump Sum Amount $15,635.00 Estimated Cost (figured on time and materials basis)
Specific Project Data. A. Owner: City of Mount ▇▇▇▇▇▇
▇. Title: Oaks on 37 RV Park Utility Improvements
C. Description: Provide engineering design services for the water distribution and collection system improvements required to serve the proposed Oaks on 37 RV Park. Improvements will include coordination of topographic survey and land or easement acquisition. *Collection system will include evaluation of the existing collection system's gravity sewer main downstream of the proposed tie-in for capacity analysis.
D. Number of Construction Contracts: 1
Specific Project Data. A. Title: East Lake Street
B. Description: Engineer will assist City in vacating and reestablishing East Lake Street Right of Way.