Stormwater Pollution Control Sample Clauses

The Stormwater Pollution Control clause establishes requirements for managing and preventing pollution caused by stormwater runoff during a project or operation. Typically, it obligates parties to implement best management practices such as installing silt fences, using sediment traps, or maintaining proper site grading to minimize contaminants entering local water systems. This clause serves to ensure compliance with environmental regulations and helps protect water quality by proactively addressing potential sources of pollution from construction or industrial activities.
Stormwater Pollution Control. Prior to commencing the Work, if applicable, the Contractor shall obtain a National Pollutant Discharge Elimination System (NPDES) permit from Nevada Division of Environmental Protection (NDEP) for construction activities. The Contractor shall perform the Work directed in the Stormwater Permit so as to not discharge storm water runoff containing pollutants or sediment into the waters of the United States (including municipal separate storm sewer systems [MS4s]) in violation of federal and state laws, rules, and regulations. The Contractor shall: i. Comply with the provisions of Nevada Revised Statutes, Chapter 445A: ii. Adhere to all Federal regulations under 40 CFR 122.26(b)(14). iii. Provide to the Owner, prior to commencing construction operations, copies of all associated permits or waivers. All information and forms pertaining to Nevada’s Stormwater NPDES Permitting Program can be found on the following website: ▇▇▇▇://▇▇▇▇.▇▇.▇▇▇/bwpc/storm01.htm. The Owner, state, and federal regulations identified above are hereby incorporated by reference as preconditions of this Contract. The Contractor shall familiarize itself with these regulations and practices, and is advised that prior to engaging in any construction activities, the Contractor shall submit a Notice Of Intent (NOI) to the Nevada Division of Environmental Protection. A Storm Water Pollution Prevention Plan (SWPPP) must be completed prior to submission of the NOI and must remain on the project site and be updated as necessary for the duration of the project. As applicant, the Contractor is responsible for insuring that all persons on the project site, including contractor and subcontractor personnel, abide by the conditions of the permit. As the applicant, the Contractor is responsible for supplying complete copies of the NOI and SWPPP to all project subcontractors. Upon completion of the project, the Contractor must (at no additional cost to the owner) permanently stabilize the construction area and file a Notice Of Termination (NOT) with NDEP to terminate the permit. The Contractor shall not be granted any time extensions for delays due to compliance with or violations of the aforementioned laws, rules, regulations, and requirements and shall pay all compliance costs and violation fines and penalties. Such imposed fines and penalties shall not result in an increase in the Contract Amount, and are not subject to reimbursement by the Owner.
Stormwater Pollution Control. LESSEE will comply with all applicable State and Federal water pollution control requirements regarding storm water and non- stormwater discharges from the PROPERTY with respect to construction of the PROJECT and use and maintenance of the PROPERTY for PASSENGER RAIL SERVICE and will be responsible for all applicable permits, including but not limited to the National Pollutant Discharge Elimination System (NPDES) General Permit and Waste Discharge Requirements for Discharges of Stormwater Associated with Industrial Activities (Excluding Construction), the NPDES General Permit for Stormwater Discharges Associated with Construction and Land Disturbance Activities, and the Caltrans Municipal Separate Storm Sewer System NPDES Permit. Copies of current storm water related NPDES permits are available on the State Water Resources Control Board website at ▇▇▇.▇▇▇▇▇.▇▇.
Stormwater Pollution Control. The Contractor shall remain in compliance with the "City of San Mateo Storm Water Management and Discharge Rules and Regulations," and shall exercise every reasonable precaution to prevent the discharge of any material which is not solely stormwater (i.e., rain) to the storm drain system. Non- allowable discharges include, but are not limited to, eroded soil from stockpiles or disturbed earth on-site, concrete and concrete washout water, sawcut slurry, fuel, oil, and other vehicle fluids, solid wastes, and construction chemicals. The Contractor shall review the "Best Management Practices for the Construction Industry" brochures as available from City and implement such management practices as are appropriate to the work to be performed. The Contractor will be responsible for the complete cleanup of all material that is discharged from the project in violation of the Discharge Rules. Should the Contractor fail to promptly and effectively clean up such discharges, City may cause the cleanup to be performed by others, the costs to be deducted from any monies due or to become due the Contractor.
Stormwater Pollution Control. The intent of these requirements is to comply with federal, state, and other local agencies’ regulations that prohibit non-stormwater discharges to storm drain sewer systems, creeks and San Francisco Bay. Storm drain sewers discharge directly to creeks and the Bay without treatment, and discharge of pollutants (any substance, material, or waste other than rainfall derived stormwater) into the storm drain sewer system is strictly prohibited. Further, the Contractor is informed that Federally Endangered species have been identified in creeks within the City Limits. The storm drain sewer system, pollutants, and other relevant information are further defined in Berkeley Municipal Code (BMC) Chapter 17.20 – DISCHARGE OF NON-STORMWATER INTO CITY’S STORM DRAIN SYSTEMREDUCTION OF STORMWATER POLLUTION, and the City’s stormwater NPDES (National Pollutant Discharge Elimination System) Permit No. CA0029831. These documents are available upon request.
Stormwater Pollution Control. The intent of these requirements is compliance with federal, state, City, and other local agencies’ regulations that prohibit non-stormwater discharges from construction sites. Pollutants (any substance, material, or waste other than rainfall derived stormwater) discharged to storm drains is strictly prohibited. Further, the Contractor is informed that Federally Endangered species have been identified in creeks within the City limits. Point source, pollutants, stormwater, and other relevant information are defined in Berkeley Municipal Code (BMC) Chapter 17.20 – DISCHARGE OF NON- STORMWATER INTO CITY’S STORM DRAIN SYSTEMREDUCTION OF STORMWATER POLLUTION, and the City’s stormwater NPDES (National Pollutant Discharge Elimination System) Permit No. CAS612008. These documents are available upon request.
Stormwater Pollution Control. ‌ A. REGULATIONS‌

Related to Stormwater Pollution Control

  • Pollution Control The Employer and the Union agree to limit all forms of environmental pollution.

  • Federal Water Pollution Control Act The contractor agrees to comply with all applicable standards, orders, or regulations issued pursuant to the Federal Water Pollution Control Act, as amended, 33 U.S.C. 1251 et seq.

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following: A. Company is required to submit a Notice of Intent to use the State of Florida Multi-Sector Generic Permit for Stormwater Discharge Associated with Industrial Activity. Authority and Company both acknowledge that close cooperation is necessary to ensure compliance with any stormwater discharge permit terms and conditions, as well as to ensure safety and to minimize the cost of compliance. Company acknowledges further that it may be necessary to undertake actions to minimize the exposure of stormwater to “significant materials” (as such term may be defined by applicable stormwater rules and regulations) generated, stored, handled, or otherwise used by Company by implementing and maintaining “best management practices” (BMPs) (as such term may be defined in applicable stormwater rules and regulations). Company will establish a BMP plan for the Premises and submit a copy to Authority. B. Company will be knowledgeable of any stormwater discharge permit requirements applicable to Company and with which Company will be obligated to comply. The submittal of a Notice of Intent will be made by Company to the FDEP, and a copy will be submitted to Authority. Company is required to comply with the following requirements including, but not limited to, certification of non-stormwater discharges; collection of stormwater samples; preparation of a Stormwater Pollution Prevention Plan or similar plans; implementation of BMPs; and maintenance and submittal of necessary records. In complying with such requirements, Company will observe applicable deadlines set by the regulatory agency that has jurisdiction over the permit. Company agrees to undertake, at its sole expense, those stormwater permit requirements for which it has received written notice from the regulatory agency and that apply to the Premises, and Company agrees that it will hold harmless and indemnify Authority for any violations or non-compliance with any such permit requirements.

  • CLEAN AIR ACT AND THE FEDERAL WATER POLLUTION CONTROL ACT (a) If the Sub-Recipient, with the funds authorized by this Agreement, enters into a contract that exceeds $150,000, then any such contract must include the following provision: Contractor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42 U.S.C. 7401-7671q) and the Federal Water Pollution Control Act as amended (33 U.S.C. 1251-1387), and will report violations to FEMA and the Regional Office of the Environmental Protection Agency (EPA).

  • Stormwater Management a) The Owner AGREES to implement the requirements incorporated in the Draft Plan Conditions attached as Schedule “F” and any reports submitted to Kawartha Region Conservation Authority and the City pertaining to: i) pre and post development run-off flows and water balance calculations, and the intended means of conveying stormwater flow from each Lot, Block and the entire proposed Plan of Subdivision; ii) the anticipated impact of the Plan of Subdivision on water quality and phosphorus control, as it relates to fish and fish habitat once adequate protective measures have been taken; iii) the means whereby erosion and sedimentation and their effects will be minimized on the site during and after construction; iv) the site soil conditions, including grain size distribution profiles; v) a site grading plan. b) The Owner AGREES to erect and maintain all stormwater management and erosion and sedimentation control structures operating and in good repair during the construction period, in a manner satisfactory to Kawartha Region Conservation Authority and the City. c) Prior to the execution of this Agreement, the Owner AGREES to confirm to the City that Conservation Authority has reviewed and approved the stormwater management report and plan, erosion and sedimentation plan, and final Lot Grading Plans as required under this Section. a) UPGRADES TO EXISTING STORM SEWER b) UPGRADES TO EXISTING SANITARY SEWER