System Design Approval Clause Samples

The System Design Approval clause establishes the requirement for formal acceptance of a project's system design by a designated party, typically the client or project owner. In practice, this clause outlines the process by which the proposed design documents, specifications, or plans must be submitted for review and cannot proceed to the next project phase until explicit approval is granted. This ensures that all stakeholders agree on the technical and functional aspects of the system before further work is undertaken, thereby minimizing misunderstandings and reducing the risk of costly changes or disputes later in the project.
System Design Approval. Seller shall provide Purchaser with a copy of the System design for approval prior to commencement of construction. Purchaser shall have ten (10) days after receipt to approve or disapprove the design. Failure by Purchaser to respond within such ten (10) day period shall be deemed approval of the design. If Purchaser disapproves the design, Seller shall modify the design and resubmit it for Purchaser’s approval. If the System design modifications requested by Purchaser render the System non-viable, Seller may terminate this Agreement under Section 2(c) above.
System Design Approval. Seller has provided Purchaser with a copy of the System design, and Purchaser has approved such design. Should any subsequent changes to the System design be made prior to Commencement of Installation, Purchaser shall be provided with a copy of any such revised System design and any resulting changes to the Contract Price, Section 6 of Exhibit 1, any of the data on Exhibit 2 and/or Table 1.A of Exhibit 4, and Purchaser shall have ten (10) business days after receipt to approve or disapprove the revised design and any such resulting changes in writing, such approval not to be unreasonably withheld. Failure by Purchaser to respond within such ten
System Design Approval. Seller shall provide each Homeowner with a copy of each System design as submitted for approval to the authority having jurisdiction for the necessary zoning, land use and building permits (“Authority Having Jurisdiction”) prior to installation of that System. Failure by the Homeowner to respond within such [five (5)] day period shall be deemed approval of the design. If AHJ or Homeowner disapproves the design, Seller shall modify the design and resubmit it for AHJ and/or Homeowner’s approval. If the System design modifications requested render the System non-viable, including inadequate economics, as determined by Seller in its sole discretion, Seller may terminate this Agreement with respect to that System under Section 3(c) above.
System Design Approval. Direct Energy Solar will install the System at the Property (the “Installation”) in the areas to be marked on a diagram to be approved by Customer prior to beginning work (the "System Diagram").
System Design Approval i. Seller shall provide Purchaser with a copy of the System design for approval prior to commencement of construction. Purchaser shall have ten (10) days after receipt to approve or disapprove the design. Failure by Purchaser to respond within such ten (10) day period shall be deemed approval of the design. If Purchaser disapproves the design, Seller shall modify the design and resubmit it for Purchaser’s approval. If the System design modifications requested by Purchaser render the System non-viable, Seller may terminate this Agreement under Section 2(c) above. If solar energy panels and other System assets documented in Exhibit 2 (such panels and System assets, the “System Equipment”) are not readily available when Seller installs the System, Seller may make substitutions of such System Equipment at Seller’s sole discretion; provided Seller shall obtain Purchaser’s prior consent for System Equipment substitutions that would materially affect the appearance or capacity of the System, or require a change to the Contract Price. ii. The description of the approved System design shall be incorporated into Exhibit 2 and Schedule A to Exhibit 2 shall be updated to reflect the final approved drawing depicting the Premises, Delivery Point, System design and location. Upon the completion of System installation, Seller shall provide Purchaser with “as-built” drawings setting forth in detail the location of all components of the System. Purchaser and Seller agree to treat such plans and specifications as well as the “as-built” drawings as Confidential Information of Seller, in accordance with Section 18(a).

Related to System Design Approval

  • Approval of Plans and Specifications The Plans and Specifications will conform to the requirements and conditions set out by applicable law or any effective restrictive covenant, and to all governmental authorities which exercise jurisdiction over the Leased Premises or the construction thereon.

  • Application Approval Our representative will notify you (or one of you, if there are co-applicants) of the Application approval, execute the Lease agreements for signature prior to occupancy, and, once complete, credit the application deposit of all applicants toward the required security deposit.

  • Preliminary Design Phase 30 percent plans) A. Proceed with Preliminary Design Phase after the completion of the Conceptual phase which includes: Acceptance by Owner of the Conceptual Report and any other Study and Report Phase deliverables; selection by Owner of a recommended solution; issuance by Owner of any instructions for use of Project Strategies, Technologies, and Techniques, or for inclusion of sustainable features in the design, and Indication by Owner of any specific modifications or changes in the scope, extent, character, or design requirements of the Project desired by Owner. 1. Prepare Preliminary Design Phase documents consisting of final design criteria, preliminary drawings, outline specifications, and written descriptions of the Project. 2. Include on plans, property lines, structure locations, ownership names and contact information. 3. In preparing the Preliminary Design Phase documents, use any specific applicable Project Strategies, Technologies, and Techniques authorized by Owner during or following the Study and Conceptual Phase, and include sustainable features, as appropriate, pursuant to Owner’s instructions. 4. Provide necessary field surveys, topographic and utility mapping for Engineer’s design purposes. Comply with the scope of work and procedure for the identification and mapping of existing utilities as defined by Section A1.03 “Utility Requirements” and Section A1.04 “Survey Services” 5. Visit the Site as needed to prepare the Preliminary Design Phase documents. 6. Advise Owner if additional reports, data, information, or services of the types described are necessary and assist Owner in obtaining such reports, data, information, or services. 7. Continue to assist Owner with Project Strategies, Technologies, and Techniques that Owner has chosen to implement. 8. Based on the information contained in the Preliminary Design Phase documents, prepare a revised opinion of probable Construction Cost, and assist Owner in tabulating the various cost categories which comprise Total Project Costs. 9. Obtain and review Owner’s instructions regarding Owner’s procurement of construction services (including instructions regarding advertisements for bids, instructions to bidders, and requests for proposals, as applicable), Owner’s construction contract practices and requirements, insurance and bonding requirements, electronic transmittals during construction, and other information necessary for the finalization of Owner’s bidding-related documents (or requests for proposals or other construction procurement documents), and Construction Contract Documents. Also obtain and review copies of Owner’s design and construction standards, Owner’s standard forms, general conditions, supplementary conditions, text, and related documents or content for Engineer to include in the draft bidding-related documents (or requests for proposals or other construction procurement documents), and in the draft Construction Contract Documents, when applicable. 10. Development communication plan for project: considering the use of door hangers, letters, public meetings, changeable message boards. 11. Furnish 6 review copies of the Preliminary Design Phase documents, opinion of probable Construction Cost, and any other Preliminary Design Phase deliverables to Owner by established due date, and review them with Owner. Owner shall submit to Engineer any comments regarding the furnished items. 12. Revise the Preliminary Design Phase documents, opinion of probable Construction Cost, and any other Preliminary Design Phase deliverables in response to Owner’s comments, as appropriate, and furnish to Owner 6 copies of the revised Preliminary Design Phase documents, revised opinion of probable Construction Cost, and any other deliverables by the specified due date. 13. Engineer’s services under the Preliminary Design Phase will be considered complete on the date when Engineer has delivered to Owner the revised Preliminary Design Phase documents, revised opinion of probable Construction Cost, and any other Preliminary Design Phase deliverables.

  • Schematic Design Phase 1.2.1 Based on the mutually agreed upon Program of Requirements, Amount Available for the Construction Contract and the Project Schedule, the Architect/Engineer shall prepare sufficient alternative approaches utilizing BIM for design and construction of the Project to satisfy Owner’s project requirements and shall, at completion of this phase, submit Schematic Design Documents derived from the model in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review alternative approaches to design and construction for the Project as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by the Owner within the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Schematic Design. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.2.2 Architect/Engineer shall provide all services necessary to perform the services of this phase (preparation of model(s), relevant data, decision support model views and Schematic Design Documents) including, without limitation, unless otherwise approved by Owner, the preparation and prompt delivery of all items specified in the BIM Execution Plan and “Facility Design Guidelines”. 1.2.3 Architect/Engineer shall work closely with Owner in preparation of schematic drawings and shall specifically conform to Owner’s requirements regarding aesthetic design issues. 1.2.4 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.2.5 Before proceeding into the Design Development Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Schematic Design documents and approval of the Architect/Engineer’s preliminary Estimated Construction Cost and schedule. 1.2.6 The Architect/Engineer shall participate in a final review of the Schematic Design Documents and model(s) with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Schematic Design Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments, any of which may be appealed for good cause.