Uncontrolled copy Clause Samples

Uncontrolled copy. Refer to the Department of Education and Training Policy and Procedure Register at ▇▇▇▇://▇▇▇.▇▇▇.▇▇▇.▇▇▇.▇▇ to ensure you have the most current version of this document.- effective November 2021.
Uncontrolled copy. Refer to the Department of Education Policy and Procedure Register at ▇▇▇▇▇://▇▇▇.▇▇▇.▇▇▇.▇▇▇.▇▇/pp/obtaining-and-managing-student-and-individual-consent-procedure to ensure you have the most current version of this document. There will not be any negative repercussions for not completing the State School Consent Form or for giving limited consent. All students will continue to receive their education regardless of whether consent is given or not. Consent may be limited or withdrawn at any time by you. If you wish to limit or withdraw consent please notify the school in writing (by email or letter). The school will confirm the receipt of your request via email if you provide an email address. If in doubt, the school may treat a notice to limit consent as a comprehensive withdrawal of consent until the limit is clarified to the school’s satisfaction. Due to the nature of the internet and social media (which distributes and copies information), it may not be possible for all copies of information (including images of student materials) once published by consent, to be deleted or restricted from use. The school may take down content that is under its direct control, however, published information and materials cannot be deleted and the school is under no obligation to communicate changes to consent with other entities/ third parties. Following is a list of online and social media websites and traditional media sources where the school may publish your child’s personal information or student materials subject to your consent. • School website: ▇▇▇.▇▇▇▇▇▇▇▇▇▇▇.▇▇.▇▇▇.▇▇ • Facebook: ▇▇▇▇▇://▇▇▇.▇▇▇▇▇▇▇▇.▇▇▇/MurrumbaStateSecondaryCollege • YouTube: ▇▇▇▇▇://▇▇▇.▇▇▇▇▇▇▇.▇▇▇/channel/UCsh86s5FMwb_2KWbk-jM7hg • Instagram: ▇▇▇▇▇://▇▇▇.▇▇▇▇▇▇▇▇▇.▇▇▇/murrumbastatesecondarycollege8/ • Twitter: N/A • LinkedIn: ▇▇▇▇▇://▇▇.▇▇▇▇▇▇▇▇.▇▇▇/company/murrumba-state-secondary-college • Other: ▇▇▇▇▇://▇▇▇▇▇▇▇▇▇▇.▇▇▇.▇▇/ • Local newspaper • School newsletter • Traditional and online media, printed materials, digital platformspromotional materials, presentations and displays. The State School Consent Form does not extend to P&C run social media accounts or activities, or external organisations.
Uncontrolled copy. Refer to the Department of Education and Training Policy and Procedure Register at ▇▇▇▇▇://▇▇▇.▇▇▇.▇▇▇.▇▇▇.▇▇/pp/enrolment-in-state-primary-secondary-and-special-schools-procedure to ensure you have the most current version of this document.
Uncontrolled copy. Refer to the Department of Education Policy and Procedure Register at ▇▇▇▇://▇▇▇.▇▇▇.▇▇▇.▇▇▇.▇▇ to ensure you have the most current version of this document. Page 3 of 4 An Individual’s copyright material may include written work (e.g. stories and poems), paintings, pictures, drawings, designs, photographs, videos, films, music, performance, recordings, computer programs, websites, sculptures, fashion, metal- or wood-works made by them or to which they contributed. In the case of students, it includes, but is not limited to, work that they create in the course of their studies during the time they are enrolled at a State school. These materials may form part of their academic assessment or be part of their studies generally and may attract copyright. The Department understands that students and volunteers generally own the intellectual property rights in the material they create and that this Consent Form is not meant to transfer the Individual’s ownership of the intellectual property in their copyright material. This Consent Form does not provide for copyright consent in relation to copyright works an Individual creates in the course of employment (whether or not the material is created in normal work hours or using departmental facilities or equipment). Where copyright material is created by a State employee while performing their duties under the terms of their employment, the copyright is owned by the State as the employer (section 35 Copyright Act 1968). There are limited exceptions to this including, for example, where the copyright material is created by an employee pursuant to a prior agreement with the employer. Generally, the deciding factor is whether the employee is performing their official duties. In addition, section 176 of the Copyright Act 1968 applies where the work was created by or under the direction or control of the State. However, moral rights may still apply to copyright material created by an employee. The Queensland Public Sector Intellectual Property Principles provide further information on intellectual property. If as an employee you have any further queries about the ownership of the intellectual property in respect of the works you create you should contact the Legal and Administrative Law Branch. Personal information includes information or opinions, whether true or not, about an individual whose identity is apparent or can reasonably be ascertained from the information or opinion. This includes the Individual’s name, image...
Uncontrolled copy. Refer to the Department of Education, Training and Employment Policy and Procedure Register at
Uncontrolled copy. Refer to the Department of Education Policy and Procedure Register at Voluntary Consent may be limited or withdrawn Media sources used

Related to Uncontrolled copy

  • Unbundled Copper Loops (UCL) 2.4.1 BellSouth shall make available Unbundled Copper Loops (UCLs). The UCL is a copper twisted pair Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters) and is not intended to support any particular telecommunications service. The UCL will be offered in two types – Designed and Non-Designed.

  • Unbundled Copper Sub-Loop (UCSL) is a copper facility of any length provided from the cross-box in the field up to and including the end-user’s point of demarcation. If available, this facility will not have any intervening equipment such as load coils between the end-user and the cross-box.

  • Unbundled Copper Loop – Designed (UCL-D) 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters). The UCL-D will be offered in two versions - Short and Long. 2.4.2.2 A short UCL-D (18,000 feet or less) is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 ohms of resistance. 2.4.2.3 The long UCL-D (beyond 18,000 feet) is provisioned as a dry copper twisted pair longer than 18,000 feet and may have up to 12,000 feet of bridged tap and up to 2800 ohms of resistance. 2.4.2.4 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Granite. 2.4.2.5 These loops are not intended to support any particular services and may be utilized by Granite to provide a wide-range of telecommunications services so long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the loop to the customer’s inside wire. 2.4.2.6 BellSouth will make available the following UCL-Ds:

  • Controlled Substance Bodily injury" or "property damage" arising out of the use, sale, manufacture, delivery, transfer or possession by any person of a Controlled Substance as defined by the Federal Food and Drug Law at 21 U.S.C.A. Sections 811 and 812. Controlled Substances include but are not limited to cocaine, LSD, marijuana and all nar- cotic drugs. However, this exclusion does not apply to the legitimate use of prescription drugs by a person following the orders of a licensed physician. Exclusions A. Motor Vehicle Liability", B. "Water- craft Liability", C. "Aircraft Liability", D. "Hovercraft Liability" and E.4. "Insured's" Premises Not An "In- sured Location" do not apply to "bodily injury" to a "residence employee" arising out of and in the course of the "residence employee's" employment by an "insured".

  • Unbundled Copper Loop – Non-Designed (UCL-ND 2.4.3.1 The UCL–ND is provisioned as a dedicated 2-wire metallic transmission facility from BellSouth’s Main Distribution Frame (MDF) to a customer’s premises (including the NID). The UCL-ND will be a “dry copper” facility in that it will not have any intervening equipment such as load coils, repeaters, or digital access main lines (DAMLs), and may have up to 6,000 feet of bridged tap between the End User’s premises and the serving wire center. The UCL-ND typically will be 1300 Ohms resistance and in most cases will not exceed 18,000 feet in length, although the UCL-ND will not have a specific length limitation. For Loops less than 18,000 feet and with less than 1300 Ohms resistance, the Loop will provide a voice grade transmission channel suitable for Loop start signaling and the transport of analog voice grade signals. The UCL-ND will not be designed and will not be provisioned with either a DLR or a test point. 2.4.3.2 The UCL-ND facilities may be mechanically assigned using BellSouth’s assignment systems. Therefore, the Loop Makeup (LMU) process is not required to order and provision the UCL-ND. However, CBX One-Stop can request LMU for which additional charges would apply. 2.4.3.3 For an additional charge, BellSouth also will make available Loop Testing so that CBX One-Stop may request further testing on the UCL-ND. Rates for Loop Testing are as set forth in Exhibit A of this Attachment. 2.4.3.4 UCL-ND Loops are not intended to support any particular service and may be utilized by CBX One-Stop to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. The UCL- ND will include a NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire. 2.4.3.5 OC will be provided as a chargeable option and may be utilized when the UCL-ND provisioning is associated with the reuse of BellSouth facilities. OC-TS does not apply to this product. 2.4.3.6 CBX One-Stop may use BellSouth’s Unbundled Loop Modification (ULM) offering to remove excessive bridged taps and/or load coils from any copper Loop within the BellSouth network. Therefore, some Loops that would not qualify as UCL-ND could be transformed into Loops that do qualify, using the ULM process.