Utility Mapping Clause Samples

Utility Mapping. As a part of the ▇▇▇▇ ▇▇▇▇▇▇ team, CSW will use the information obtained from the utility companies and field reviews to map the existing utilities over a topographic survey to reflect the existing conditions.
Utility Mapping. ▇▇▇▇ ▇▇▇▇▇▇ will send proposed project plans/limits map to utility owners with a County approved letter requesting verification of the location, size, and depth of each facility within the Project area. ▇▇▇▇ ▇▇▇▇▇▇ will map and identify all public or private utilities that may be affected by the Project and identify utilities requiring relocation. Task 2 Deliverables:  Survey Request Exhibit (pdf)  30% Plans (pdf)  30% Estimate (pdf)  Draft and Final Traffic Analysis Memo (pdf)  Draft and Final Geotechnical Design/Materials Report (pdf)  Draft and Final Drainage Memo (pdf)  Basis of Design Memo (pdf)  Utility “A” Letters (pdf)  Existing Utility Base Mapping (Civil 3D)
Utility Mapping. Consultant will perform research at the City and State, and utility companies and other agencies to obtain as‐builts and record maps of the project limits. This includes preparation and mailing of the Utility “A” letter upon City approval. The Consultant will obtain utility mapping from utility companies and develop a utility base map. A Utility Matrix will be created to track discussions and data received from utility agencies.
Utility Mapping. The Company shall make available all technical data relative to the water distribution and sanitary sewer collection systems. The Owner will assume the day to day acquisition and inputting of new record drawings and system data.
Utility Mapping. Continue to assist PCCA with Specific Project Strategies, Technologies, and Techniques that PCCA has chosen to implement.
Utility Mapping. The Design Professional will develop a Base Map of the existing utilities using as-built records, franchise utility mapping and field pothole and GRP scanning data collected. The utility base map will be referenced into the design drawings.
Utility Mapping. Consultant will contact utility providers in the area to request updated information regarding their facilities in the project area. Information received will be incorporated into the base mapping and used to identify high risk and low risk utilities and other information for the ROW Data Sheet. Potholing and assisting with the preparation of Utility Policy Variance Requests will not be performed with this task.

Related to Utility Mapping

  • MAINTENANCE OF THE SAID BUILDING / APARTMENT / PROJECT The Promoter shall be responsible to provide and maintain essential services in the Project till the taking over of the maintenance of the project by the association of the allottees. The cost of such maintenance has been included in the Total Price of the [Apartment/Plot].

  • Utility Any service provided by an outside source or manufactured in-house that facilitates building operations (e.g., gas, water, electricity, fire suppression water, fire alarm systems).

  • Utility Services Company agrees to pay the full cost and expense associated with its use of all utilities, including but not limited to water, sanitary sewer, electric, storm drainage, and telecommunication services.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Utilities The Landlord shall provide the following utilities and services to the Tenant: _