Connecting Transmission Owner’s Scope of Work and Responsibilities The Connecting Transmission Owner will design, construct, own, operate and maintain all Connecting Transmission Owner’s Interconnection Facilities, except as otherwise stated above and in the Project Specific Specifications. The Connecting Transmission Owner will complete all engineering reviews, field verifications and witness testing, etc. in accordance with the ESBs and the Project Specific Specifications. Connecting Transmission Owner shall provide the revenue metering CT/PT units and meter socket enclosure. The Connecting Transmission Owner shall: • provide, run, and wire both ends of the color-coded cable for the revenue metering instrument transformer secondary wiring; • perform all terminations; and • supply and install the meter. The revenue meter may require a communications link to the RTU. The Connecting Transmission Owner will specify and run those communications cables. The Connecting Transmission Owner shall complete all wiring, testing and commissioning of the RTU.
HOURS OF WORK AND OVERTIME A. The normal work week shall be from Monday to Friday both inclusive and shall comprise five (5) days of eight (8) hours each. B. All hours worked in excess of eight (8) hours in any day shall be paid at the rate of 1 ½ times the regular hourly rate. C. Any work performed on Saturday shall be considered overtime and shall be paid at the rate of 1 ½ times the hourly rate of pay except as provided in “E” or except for the Tuesday/Saturday shift at the high school and middle schools. D. All hours worked on a Sunday, shall be considered overtime, and shall be paid a rate of two (2) times the normal rate of pay, except as provided in “E” below. E. Part-time employees must satisfy the forty (40) hour week require- ment prior to receiving overtime pay for Saturdays or Sundays. F. Employees called to work prior to the start of their normal shift shall be paid overtime for any such time worked, but such overtime pay- ment shall not apply to any of the hours of the normal shift. G. Whenever possible, the Board shall notify the employees of any Sat- urday or Sunday work not later than the end of the shift on Thursday of that week only if such Saturday or Sunday work is scheduled prior to the end of the shift on Thursday of that week, except in cases of emergency. Nothing contained in this paragraph shall be construed to be a guarantee of overtime if such is scheduled nor shall the right of the Board to cancel such scheduled overtime be limited. Employees who are required to work on a Saturday or a Sunday shall be ▇▇▇▇▇▇- ▇▇▇▇ a minimum of four hours of work at the overtime rates provided in B and C above. H. Overtime shall be distributed equally as practical by building and/or department among the employees qualified and capable of performing the work available. Individuals declining overtime will be required to sign off acknowledging refusal. During emergencies or when a re- placement is unavailable, working overtime may be mandatory. I. In the event an employee is called back to work after the conclusion of a normal work shift, the employee will be entitled to a minimum of four (4) hours pay at the overtime rate and the Board reserves the right to assign four (4) hours of work in such situations. If the call- back is for an open window or door, the payment shall be two (2) hours at the overtime rate. Failure of an employee to properly secure his/her area of responsibility shall result in disciplinary action. J. Except in case of emergency, or in the event of performance on an assigned job, or during July and August, no seasonal or substitute employees shall perform in excess of forty (40) hours per week the duties of employees in the bargaining unit, nor shall seasonal or sub- stitute employees be hired or retained if regular permanent employees are on a temporary lay-off due to a reduction in force. K. Employees shall be granted no more than a fifteen (15) minute coffee break in the morning. L. When an employee is required to work in excess of ten (10) hours or more, said employee shall be granted a second one-half (1/2) hour lunch period at no loss of pay for such lunch period, and shall be granted an additional one-half (1/2) hour lunch period for each five
Final Working Drawings After the Final Space Plan has been approved by Landlord, Tenant shall supply the Engineers with a complete listing of standard and non-standard equipment and specifications, including, without limitation, B.T.U. calculations, electrical requirements and special electrical receptacle requirements for the Premises, to enable the Engineers and the Architect to complete the “Final Working Drawings” (as that term is defined below) in the manner as set forth below. Upon the approval of the Final Space Plan by Landlord and Tenant, Tenant shall cause the Architect and the Engineers to complete the architectural and engineering drawings for the Premises, and Architect shall compile a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is complete to allow subcontractors to bid on the work, to the extent applicable, and to obtain all applicable permits (collectively, the “Final Working Drawings”) and shall submit the same to Landlord for Landlord’s approval, which approval shall not be unreasonably withheld. Tenant shall supply Landlord with four (4) hard copies and one (1) electronic copy of such Final Working Drawings. Landlord shall advise Tenant within ten (10) business days after Landlord’s receipt of the Final Working Drawings for the Premises if the same are approved, or, if the Final Working Drawings are not reasonably satisfactory or are incomplete in any respect, disapproved, in which event Landlord shall include in its notice of disapproval a reasonably detailed explanation as to which items are not satisfactory or complete and the reason(s) therefor. If Tenant is so advised that the Final Working Drawings are not satisfactory or complete, Tenant shall promptly revise the Final Working Drawings in accordance with such review and any disapproval of Landlord in connection therewith, and Landlord shall approve or disapprove the resubmitted Final Working Drawings, based upon the criteria set forth in this Section 3.3, within five (5) business days after Landlord receives such resubmitted Final Working Drawings. Such procedure shall be repeated until the Final Working Drawings are approved; provided, however, that if Landlord fails to notify Tenant of Landlord’s approval or disapproval of any iteration of the Final Working Drawings within the initial ten (10) business day review period or any subsequent five (5) business day review period for approval or disapproval thereof, Tenant shall deliver Landlord an additional notice requesting approval and if Landlord thereafter fails to respond within five (5) business days of receipt of such additional notice, Landlord will be deemed to have approved such iteration of the Final Working Drawings.
HOURS OF WORK & OVERTIME Section 15.1 This Article is intended to define the normal hours of work per day or per week in effect at the time of execution of this Agreement. Nothing contained herein shall be construed as preventing the Employer from restructuring the normal workday or workweek as necessary to promote efficiency or improve services, or from establishing the work schedules of employees. However, nothing in this Section shall relieve the Employer of its duty to bargain the affects of such decisions on employee wages, hours, terms and other conditions of employment. This Article shall be used as the basis for computing overtime for employees who are not exempt from the overtime provisions of the Fair Labor Standards Act and shall not be construed as a guarantee of hours of work per day or per week. Section 15.2 Employees may take one paid fifteen (15) minute break for every four (4) hour block worked. Employees may combine breaks to take up to one (1) sixty (60) minute paid break. Employees may not leave campus on their paid breaks. Section 15.3 Bargaining unit employees who are not exempt from the provisions of the Fair Labor Standards Act will be paid one and one-half times their normal hourly rate for all hours actually worked in excess of forty (40) hours per work week. All overtime shall have prior supervisory approval, except when it is necessary for a nurse to remain on duty to protect patient safety. Only hours actually worked are counted for the purpose of computing an employee's eligibility for overtime pay. There shall be no pyramiding of hours or pay. Section 15.4 The Board serves individuals 24 hours per day, 7 days per week. To meet this need for service to our individuals evening and weekend hours may be required of any bargaining unit employee. The Employer will establish the standard work day as beginning at 6:00 a.m. and ending at 5:59 a.m. and starting and ending times for each shift in each department. Supervisors will establish daily workschedules. Section 15.5 Absent an emergency situation, management will notify the Union in the event management intends to institute a long-term change in the present shift times for nurses. Following notification and upon request by the Union, management will meet with the Union to discuss the reason for the change and possible alternatives.
Construction Phase Fee Contractor’s Construction Phase Fee is the maximum amount payable to Contractor for any cost or profit expectation incurred in the performance of the Work that is not specifically identified as being eligible for reimbursement by Owner elsewhere in this Agreement. References in the UGSC to Contractor’s “overhead” and “profit” mean Contractor’s Construction Phase Fee. The Construction Phase Fee includes, but is not limited to, the following items: 9.1 All profit, profit expectations and costs associated with profit sharing plans such as personnel bonuses, incentives, and rewards; company stock options; or any other like expenses of Contractor.