ASSUMPTIONS AND EXCLUSIONS Sample Clauses
The Assumptions and Exclusions clause defines the specific conditions, limitations, and boundaries under which a contract or agreement is made. It typically outlines what is presumed to be true for the purposes of the agreement—such as the availability of certain resources or the accuracy of provided information—and explicitly states what is not covered or included, such as certain types of damages or services. By clearly stating these assumptions and exclusions, the clause helps prevent misunderstandings and disputes by ensuring all parties are aware of the scope and limitations of their obligations.
POPULAR SAMPLE Copied 16 times
ASSUMPTIONS AND EXCLUSIONS. Geotechnical services are included in this proposal. • Materials sampling and testing to establish the structural capacity of various buildings components is included in this proposal. • Periodic preliminary conferences with DSA are assumed to be required and are included in this proposal. • Accessibility improvements to the Center Street entrance will be required. • With the exception of mechanical shafts, stairs, and elevator enclosures, the non- structural elements of the interior such as partitions and ceilings are assumed to be removed. • No major changes to the building area or exterior enclosure are proposed with the exception of changes associated with added lateral force resisting systems. • Various schemes for structural improvements have been explored and offer different opportunities for the layout and size of interior spaces. New lateral force resisting systems may include drilled piers and footings; shotcrete, concrete masonry or plywood shear walls; additional nailing at plywood shear walls and floor diaphragms; drag members; blocking and strapping. The specific approach for structural improvements will require approval by the Division of the State Architect (DSA) in order to convert this building for use as a community college facility. • The thermal performance of the building may be improved by adding roof and wall insulation. • Replacement of exterior glazing systems is not included due to cost considerations. • Restroom fixture capacity appears to be sufficient under current code if the number of new classrooms is limited. However, if additional classrooms are desired, an increase in the number of restroom fixtures will be required. The test fit assumes that the restrooms will be renovated or expanded at their current location to utilize the existing sewer connection. • The existing elevator is assumed to require modernization but not replacement. • The open stair is assumed to be removed. • The project is assumed to include replacement of all mechanical systems. • The project is assumed to include provision of a new fire sprinkler system and fire alarm system. • The project is assumed to include provision of telecom infrastructure including dedicated MDF/IDF rooms. We hope this brief summary is a useful reference for your review of our proposal. The completed report, entitled “▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇▇ Test Fit Summary”, dated July 16, 2014, includes additional information regarding the proposed renovation and conversion. We appreciate the op...
ASSUMPTIONS AND EXCLUSIONS. It is the City’s intent that the interactive Project water feature will be a packaged system and that the manufacturer will be responsible for its engineering. Working with the City and Steering Committee, the Design Team will help to facilitate the selection of the desired appearance and water effect, and produce the necessary performance specifications for this work to be bid competitively.
ASSUMPTIONS AND EXCLUSIONS. Transportation Conformity Working Group (TCWG) coordination to re- determine Not-Project of Air Quality Concern (Not-POAQC) status is excluded. Previous Not-POAQC determination made July 26, 2006 remains valid. Opening Year and Horizon Year are assumed to be 2022 and 2042, respectively. Preparation of the PM Hot-Spot Summary form is included; however, PM modeling is excluded.
ASSUMPTIONS AND EXCLUSIONS. Scope of work does not include on-site field inspection and verification of site conditions, except for karst feature survey at one 0.25-acre site, as described above. If desktop review finds that such activities are needed, a supplemental scope of work and fee estimate can be provided by B&A. • B&A assumes that the proposed project is not categorized as a federal undertaking. • This scope of work does not include permitting or agency coordination other than specified herein. Should such permitting or agency coordination be required, B&A would submit a separate scope and fee to ▇. ▇▇▇▇▇▇ for consideration. • The project is located within the ▇▇▇▇▇▇▇ Aquifer recharge zone, but includes regulated activities (i.e., the installation of water lines) exempt from the ▇▇▇▇▇▇▇ Aquifer protection plan application requirements, per 30 TAC 213.5(h). Therefore, it is assumed that a Texas Commission of Environmental Quality (TCEQ) Geologic Assessment (TCEQ 0585) will not be required and is not included in this proposal. Should it be determined that a Geological Assessment is necessary, B&A can provide a separate scope and fee for these services. • The project is located primarily in Karst Zone 1, areas known to contain federally endangered cave fauna. It is assumed that a USFWS Karst Survey will likely be required for project areas that include areas that are natural ground and currently unpaved. Based on correspondence with the ▇. ▇▇▇▇▇▇, services included in this proposal are limited to desktop review except for karst field survey at one location. Should desktop review find that a USFWS Karst Survey is required elsewhere in addition to as proposed herein, B&A will provide a separate scope and fee for these services. • Presence/absence surveys or coordination with USFWS or TPWD for protected species is not included in this proposal. Should it be determined that such services are required, B&A will submit a separate scope and fee to your office for review. • Texas Department of Transportation (TxDOT) environmental review is not included. • Client understands that revisions to the project after providing notice to proceed requires additional time and materials and will be billed at an additional cost outside of this current scope of work. • B&A assumes that one report and one cultural resources coordination letter will be composed in fulfillment of the proposed scope of work. • This scope of work does not include preparation of a Waters of the U.S. Preliminary Jurisdicti...
ASSUMPTIONS AND EXCLUSIONS. The Project will require Caltrans review and approval of the Environmental Document and Technical Studies. Caltrans is the NEPA Lead Agency.
ASSUMPTIONS AND EXCLUSIONS. MBCO is under the assumption that NewQuest will be dedicating the east 900 feet of right-of-way by plat out of a 21.89 acre parcel referenced by FBCAD No. R484346; therefore MBCO will not be completing a Category 1A Condition II boundary survey for the above-referenced tract of land. • MBCO must be provided with the recorded plat for the 21.89 acre parcel dedicating the east 900 feet of the proposed ▇▇▇▇▇ Plantation ROW. • MBCO under this proposal will not be monumenting the east 900 feet of the proposed ▇▇▇▇▇ Plantation Dr. ▇▇▇ as this should be monumented by the platting surveyor. • MBCO will be given sub meter locations of the geotech boring locations and boreholes will be marked with lath and flagging in the field prior to surveying. • MBCO will be given right of entry and access to the areas needed to perform our services per this proposal in a timely manner. • MBCO will not be responsible for obtaining right of entry per this proposal.
ASSUMPTIONS AND EXCLUSIONS. Internal assessments of existing pipes via closed-circuit television (CCTV) is not included in this scope of services.
ASSUMPTIONS AND EXCLUSIONS. 7.1 Scope is subject to assumptions and exclusions
ASSUMPTIONS AND EXCLUSIONS. Relocation of other existing utilities, arborist service, SFWMD well construction permit (to be obtained by contractor) is not included within this scope of work.
ASSUMPTIONS AND EXCLUSIONS. ▇▇▇▇ ▇▇▇▇▇ ▇▇▇, ▇▇▇▇▇ ▇▇▇ Miami FL 33145 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇