BASIS OF ENERGY ENGINEERING Clause Samples

BASIS OF ENERGY ENGINEERING. Forecasted energy savings are the difference between the pre- and post-retrofit period consumption for the equipment included in the scope of Work. The pre-retrofit (or Baseline) data for this project covers the period from May 2021 through April 2022. The Baseline data takes into consideration the quantity of facilities and size; 2021/2022 building operational schedules; 2021/2022 School Calendar and 2021/2022 individual school Bell Schedules; occupancy factors and utilization; utility usage, costs and published current effective utility rates along with the available average ASHRAE weather files for the closest weather station. Except weather files, this data has been obtained from the District. Since Contractor does not control/follow the building operations on a day-by-day basis, it is virtually impossible to track the energy consumption and savings from utility bills due to many dynamic factors that are out of Contractor’s control. These factors (permanent or temporary) include, but are not limited to: weather changes; changes in the use of any facility and number of occupants (including, but not limited to, staff, faculty and students); changes to the hours of operation of any facility; changes to the control system scheduling; changes or modifications to the equipment or services provided under this Agreement; changes in utility suppliers, method of utility billing, number of days in the billing cycle, utility rates or method of utility purchasing; improper maintenance of the equipment or of any energy-consuming equipment; changes to the equipment or to any facility required by changes to building codes; additions or deletions of energy-consuming equipment; personal portable heaters; refrigerators and vending machines and/or additions or deletions of any facilities (i.e. portable classroom buildings), etc. Therefore, engineering calculations approach is based on a measure-by-measure (ECM-by-ECM) basis and is to be derived by comparing the specific value of physical parameters after the installation to its value prior to the installations. For example: lighting systems retrofit (see below) will result in lower wattage consumption than Baseline scenario. This measure is not affected by weather changes, HVAC or other unrelated equipment energy consumption that are reflected in the utility bills. Below are some key characteristics and features of the measure-by-measure energy saving calculations method: • It calculates savings based on District inputs, ...
BASIS OF ENERGY ENGINEERING. Forecasted energy savings are the difference between the pre- and post-retrofit period consumption for the equipment included in the scope of Work. The pre-retrofit data (hereinafter, "Baseline data") for the Project under this Work Order #1 covers the period from March 2022 through March 2023. The Baseline data takes into consideration the quantity of facilities and size thereof, 2023/2024 building operational schedules, 2023/2024 School Calendar, 2023/2024 individual school bell schedules, occupancy factors and utilization, utility usage, costs, and utility rates along with the available average NREL weather data for the closest weather station. The District provided the aforementioned information except for the weather data. Contractor does not control or follow the operations of the District’s Facilities on a day-by-day basis, it is virtually impossible to track the energy consumption and savings from utility bills due to many dynamic factors that are out of Contractor’s control. Such factors outside of Contractor’s control include, but are not limited to: weather changes, changes in the use of any facility and number of occupants (including, but not limited to, staff, faculty and students), changes to the hours of operation of any facility, changes to the control system scheduling, changes or modifications to the equipment or services provided under this Agreement, changes in utility suppliers, method of utility billing, number of days in the billing cycle, utility rates or method of utility purchasing, improper maintenance of the equipment or of any energy-consuming equipment, changes to the equipment or to any facility required by changes to building codes, additions or removals of energy-consuming equipment, personal portable heaters, refrigerators, and vending machines, and additions or removals of any supplemental facilities (i.e. portable classroom buildings), etc. Therefore, the engineering calculations approach is based on a measure-by-measure (ECM-by-ECM) basis and is derived by comparing the specific value of physical parameters after the installation to its value prior to the installations. For example: lighting systems retrofit (see below) will result in lower wattage consumption than Baseline scenario. This measure is not affected by weather changes, HVAC, or other unrelated equipment energy consumption that are reflected in the utility bills. Below are some key characteristics and features of the measure-by-measure energy saving calculat...

Related to BASIS OF ENERGY ENGINEERING

  • Reverse Engineering The Customer must not reverse assemble or reverse compile or directly or indirectly allow or cause a third party to reverse assemble or reverse compile the whole or any part of the software or any products supplied as a part of the Licensed System.

  • Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. (a) A7 to show Purchaser’s performance responsibility. (b) The Schedule of Items to include costs of survey and design, as provided under B5.24, and adjust Timber Sale Account, as provided in B5.

  • Geotechnical Engineer « »« » « » « » « » « »

  • Value Engineering The Supplier may prepare, at its own cost, a value engineering proposal at any time during the performance of the contract. The value engineering proposal shall, at a minimum, include the following; a) the proposed change(s), and a description of the difference to the existing contract requirements; b) a full cost/benefit analysis of the proposed change(s) including a description and estimate of costs (including life cycle costs) the Procuring Entity may incur in implementing the value engineering proposal; and c) a description of any effect(s) of the change on performance/functionality.

  • No Reverse Engineering You may not, and you agree not to or enable others to, copy (except as expressly permitted by this License or by the Usage Rules if they are applicable to you), decompile, reverse engineer, disassemble, attempt to derive the source code of, decrypt, modify, or create derivative works of the Apple Software or any services provided by the Apple Software, or any part thereof (except as and only to the extent any foregoing restriction is prohibited by applicable law or to the extent as may be permitted by the licensing terms governing use of open-sourced components included with the Apple Software).