Changes During Construction Sample Clauses

Changes During Construction. IPTC shall promptly communicate with the DPW Construction Representative and the DPW Inspector with regard to all CCDs and COs in accordance with Section 4(b), and shall refrain from releasing its contractor to perform any work under a CCD or CO concerning IPTC Infrastructure (as defined in Section 5(c)(i)) until it has received DPW’s comments, if any, and concerning City Infrastructure until it has received DPW’s approval, all in accordance with Section 4(b).
Changes During Construction. Should the cumulative amount due to the general contractor exceed $854,755,32, the costs in excess of $854,755.32 may be paid by the Library, in its sole discretion.
Changes During Construction. (Shell and Core Tenant Upgrades and Tenant Work). Revisions to the Shell and Core Plans or Tenant Plans, if any, are to be accommodated by Field Change Orders. A "Field Change Order" is a document which outlines the scope of a requested change in the Work as defined by the Shell and Core Plans and Tenant Plans and bears the signature of Tenant and Landlord representatives approving such change in scope. All such plans, specifications, and Field Change Orders shall be approved by Landlord and Tenant prior to being executed or acted upon by the Landlord's or Tenant's Contractors. Landlord and Tenant shall be given 24 hours to respond without causing a Landlord or Tenant Delay unless otherwise specified in said Field Change Order. In the event the Field Change Order increases the cost of the Shell and Core or Tenant Work beyond the maximum Tenant Work Allowance, Tenant shall pay for the work per the terms of this Exhibit and the Lease. As for Tenant Work, Tenant shall pay its Contractor per the terms of the construction contract between the Tenant and its Contractor. EXHIBIT D TO OFFICE LEASE AGREEMENT ▇▇▇ ▇▇▇▇▇▇▇ ▇▇▇▇▇▇ WEST BUILDING OFFICE TENANT BUILDING SHELL AND CORE OUTLINE SPECIFICATIONS The Building Outline Specifications which follow are intended to establish the scope and quality of finishes, materials and systems to be furnished by Landlord for the construction of the basic Building Shell and Core, as well as the parking structure and landscaped surface parking areas (together referred therein as the "Shell and Core"). The Building Outline Specifications are intended to govern the development of the building drawings through the completion of the final building working drawings and specifications ("The Contract Documents"). Capitalized terms used and not defined shall have the meanings given them in the Lease. Landlord is committed to developing a long-term investment quality product, which has lasting quality and landmark stature and will be considered in all respects a first class office building development. This Outline Specification may be amended, through mutual consent of the parties, during the completion of the design development and construction document phases of the design of the buildings. The cost of all maintenance following initial installation shall be as provided under the Lease. FOUNDATION SYSTEM 1. The foundation system shall be designed based upon good engineering practice, soils bearing analysis from a geotechnical engineer an...
Changes During Construction. The Developer shall not vary the design of the System subsequent to the commencement of construction of the System, without first submitting such variation in writing to Hydro Ottawa for approval and shall not implement any such variation until approval in writing has been received from Hydro Ottawa. Hydro Ottawa reserves the right to modify by written direction, upon reasonable notice to the Developer, at any time and as circumstances require, the plans and specifications, Hydro Ottawa’s Work or the Developer’s Work to accommodate the requirements of Hydro Ottawa or the Developer, the existing or changing regulations, standards, specifications or technical requirements of the System, and the Developer shall perform or pay the cost of such changes without accounting or compensation from Hydro Ottawa.
Changes During Construction. If Grantee seeks to change the scope of the Enhancements, Grantee shall meet with Staff to discuss the desired change. Staff has the authorization to approve minor modifications during construction. Any other desired modification shall be placed before the appropriate JEDC Board for reconsideration.
Changes During Construction. The Department shall submit to the Concessionaire accurate and complete copies of any field design changes, notices of design changes, non-conformance reports and variances relating to the design, development and construction of the STE (collectively, “STE Changes” and each, an “STE Change”) prior to delivering any final approvals relating to an STE Change to the STE Design-Build Contract. The Concessionaire shall have the right to approve an STE Change only if such STE Change materially and adversely affects the operations and maintenance of the STE during the Term. The Concessionaire’s review of any submittal pursuant to this section shall comply with the submittal and review procedures set forth in Section 8A.07.
Changes During Construction. Changes to the scope during construction are often a result of changes to field conditions discovered as construction progresses. Prior to initiating any change to approved “Ready for Construction” (RFC) documents, we will work with SHA to identify and determine an appropriate resolution similar to the procedure for change management for design noted above. Once the change and its solution are identified, our Design Project Manager, ▇▇▇▇▇▇ ▇▇▇▇▇▇, PE, will collect all required SHA or third party approvals, by preparing and submitting through our Project Construction Manager, ▇▇▇▇▇▇ ▇▇▇▇▇▇ (CGI), a redline revision to SHA’s Project Design Engineer, for review and approval by appropriate SHA staff or third parties. All changes to approved RFC plans will be tracked and documented in the DMS to ensure they are included on final as-built drawings. Revisions which require minor changes to RFC documents will be shown on office copies of current as-built set of plans and be later documented on the project as-built drawings at the project completion. Only construction documents that are stamped and signed as RFC will be used for construction. Our Project Quality Control team will be responsible for auditing plan sets used in the field to ensure that they are current and approved. The Project Superintendent will also be responsible for checking the control sets to make sure that they are using the most up-to-date documents.
Changes During Construction 

Related to Changes During Construction

  • Delays during construction Without prejudice to the provisions of Clause 10.3 (ii), in the event the Contractor does not achieve any of the Project Milestones or the Authority’s Engineer shall have reasonably determined that the rate of progress of Works is such that Completion of the Project Highway is not likely to be achieved by the end of the Scheduled Completion Date, it shall notify the same to the Contractor, and the Contractor shall, within 15 (fifteen) days of such notice, by a communication inform the Authority’s Engineer in reasonable detail about the steps it proposes to take to expedite progress and the period within which it shall achieve the Project Completion Date.

  • Maintenance during Construction Period (i) During the Construction Period, the Contractor shall maintain, at its cost, the existing lane(s) of the Project Highway so that the traffic worthiness and safety thereof are at no time materially inferior as compared to their condition on Appointed Date, and shall undertake the necessary repair and maintenance works for this purpose; provided that the Contractor may, at its cost, interrupt and divert the flow of traffic if such interruption and diversion is necessary for the efficient progress of Works and conforms to Good Industry Practice; provided further that such interruption and diversion shall be undertaken by the Contractor only with the prior written approval of the Authority’s Engineer which approval shall not be unreasonably withheld. For the avoidance of doubt, it is agreed that the Contractor shall at all times be responsible for ensuring safe operation of the Project Highway. It is further agreed that in the event the Project includes construction of a bypass or tunnel and realignment of the existing carriageway, the Contractor shall maintain the existing highway in such sections until the new Works are open to traffic. (ii) Notwithstanding anything to the contrary contained in this Agreement, in the event of default by the Contractor in discharging the obligations specified in Clause 10.4 (i) above, the Authority shall get these maintenance works completed in the manner recommended by the Authority’s Engineer to avoid public inconvenience at the risk and cost of the Contractor in order to keep the road in traffic worthy condition.

  • During Construction Upon request of the Owner the Contractor shall submit written proposals for unit prices to be applied in the event Change Order Work is authorized by the Owner to be performed under Case (b).

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • ADDITIONAL CONSTRUCTIONS The Promoter undertakes that it has no right to make additions or to put up additional structure(s) anywhere in the Project after the building plan has been approved by the competent authority(ies) except for as provided in the Act.