COMPENSATORY MITIGATION PROJECT ESTABLISHMENT AND OPERATION Clause Samples

COMPENSATORY MITIGATION PROJECT ESTABLISHMENT AND OPERATION. MARS is established as the Sponsor of a qualified Statewide ILF Mitigation Program for Corps authorizations in Montana. An Interagency Review Team (IRT) will advise the Corps on the management of the MARS Montana Statewide ILF Mitigation Program. As Sponsor of the Program, MARS will sell mitigation credits to impact site permittees. The funds received from permittees may be consolidated and used to implement various compensatory mitigation projects. The structure of the Statewide ILF Mitigation Program is outlined in this instrument. Mitigation project planning will be conducted within 16 Service Areas following guidelines established in the Compensation Planning Framework (See Section V-A and Exhibit A) that outlines an approach to prioritizing restoration and conservation needs, project selection criteria, and project site selection criteria. Each compensatory mitigation project will have a separate mitigation project plan reviewed by the Corps and IRT and signed by MARS and the Corps. Mitigation project plans will be developed and implemented in accordance with 33 CFR 332 and will be considered as a modification to the Instrument. Review and approval of subsequent compensatory mitigation project plans will follow the process outlined for Modifications to the Instrument, Section IX, of this Instrument and according to the procedures outlined in 33 CFR 332.8(g). At the District Engineer’s discretion, review and approval of additional compensatory mitigation project plans may follow the Streamlined instrument modification process outlined in 33 CFR 332.8(g)(2). Mitigation project plans will include the following twelve elements: 1. Project objectives 2. Site selection factors 3. Site protection instrument 4. Baseline information 5. Determination of credits 6. Work plan

Related to COMPENSATORY MITIGATION PROJECT ESTABLISHMENT AND OPERATION

  • Development of the Project 4.1 TSP's obligations in development of the Project: a. for procuring and maintaining in full force and effect all Consents, Clearances and Permits, required in accordance with Law for development of the Project; b. for financing, constructing, owning and commissioning each of the Element of the Project for the scope of work set out in Schedule 1 of this Agreement in accordance with: i. the Electricity Act and the Rules made thereof; ii. the Grid Code; iii. the CEA Regulations applicable, and as amended from time to time, for Transmission Lines and sub-stations: • the Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2007; • Central Electricity Authority (Technical Standards for construction of Electrical Plants and Electric Lines) Regulation, 2010; • Central Electricity Authority (Grid Standard) Regulations, 2010; • Central Electricity Authority (Safety requirements for construction, operation and maintenance of Electrical Plants and Electrical Lines) Regulation, 2011; • Central Electricity Authority (Measures relating to Safety and Electricity Supply) Regulation, 2010; • Central Electricity Authority (Technical Standards for Communication System in Power System Operation) Regulations, 2020. iv. Safety/ security Guidelines laid down by the Government; v. Prudent Utility Practices, relevant Indian Standards and the Law; not later than the Scheduled COD as per Schedule 2 of this Agreement; c. for entering into a Connection Agreement with the concerned parties in accordance with the Grid Code. d. for owning the Project throughout the term of this Agreement free and clear of any encumbrances except those expressly permitted under Article 15 of this Agreement; e. to co-ordinate and liaise with concerned agencies and provide on a timely basis relevant information with regard to the specifications of the Project that may be required for interconnecting the Project with the Interconnection Facilities; f. for providing all assistance to the Arbitrators as they may require for the performance of their duties and responsibilities; g. to provide to the Nodal Agency and CEA, on a monthly basis, progress reports with regard to the Project and its execution (in accordance with prescribed form) to enable the CEA to monitor and co-ordinate the development of the Project matching with the Interconnection Facilities; h. to comply with Ministry of Power order no. 25-11/6/2018 – PG dated 02.07.2020 as well as other Guidelines issued by Govt. of India pertaining to this; i. to procure the products associated with the Transmission System as per provisions of Public Procurement (Preference to Make in India) orders issued by Ministry of Power vide orders No. 11/5/2018 - Coord. dated 28.07.2020 for transmission sector, as amended from time to time read with Department for Promotion of Industry and Internal Trade (DPIIT) orders in this regard (Procuring Entity as defined in above orders shall deemed to have included Selected Bidder and/ or TSP). Also, to comply with Department of Expenditure, Ministry of Finance vide Order (Public Procurement No 1) bearing File No. 6/18/2019- PPD dated 23.07.2020, Order (Public Procurement No 2) bearing File No. 6/18/2019-PPD dated 23.07.2020 and Order (Public Procurement No. 3) bearing File No. 6/18/2019-PPD, dated 24.07.2020, as amended from time to time, regarding public procurement from a bidder of a country, which shares land border with India; j. to submit to Nodal Agency information in the prescribed format [To be devised by Nodal Agency] for ensuring compliance to Article 4.1 i) above. k. to comply with all its obligations undertaken in this Agreement. 4.2 Roles of the Nodal Agency in implementation of the Project: 4.2.1 Subject to the terms and conditions of this Agreement, the Nodal Agency shall be the holder and administrator of this Agreement and shall inter alia: a. appoint an Independent Engineer within 90 days of the Effective Date b. provide letters of recommendation to the concerned Indian Governmental Instrumentality, as may be requested by the TSP from time to time, for obtaining the Consents, Clearances and Permits required for the Project; c. coordinate among TSP and upstream/downstream entities in respect of Interconnection Facilities; and d. monitor the implementation of the Agreement and take appropriate action for breach thereof including revocation of guarantees, cancellation of Agreement, blacklisting etc e. provide all assistance to the Arbitrators as required for the performance of their duties and responsibilities; and f. perform any other responsibility (ies) as specified in this Agreement.

  • COMMENCEMENT AND COMPLETION OF THE PROJECT Section 3.01 The Project 8 Section 3.02 Diligent Completion 8 Section 3.03 Filings and Reports 8

  • Development Activities The Development activities referred to in item “b” of paragraph 3.1 include: studies and projects of implementation of the Production facilities; drilling and completion of the Producing and injection ▇▇▇▇▇; and installation of equipment and vessels for extraction, collection, Treatment, storage, and transfer of Oil and Gas. The installation referred to in item “c” includes, but is not limited to, offshore platforms, pipelines, Oil and Gas Treatment plants, equipment and facilities for measurement of the inspected Production, wellhead equipment, production pipes, flow lines, tanks, and other facilities exclusively intended for extraction, as well as oil and gas pipelines for Production Outflow and their respective compressor and pumping stations.

  • Management and Operations Promotes the learning and growth of all students and the success of all staff by ensuring a safe, efficient, and effective learning environment, using resources to implement appropriate curriculum, staffing, and scheduling

  • Management and Operation 6.01 Management of Partnership Affairs 16 6.02 Duties and Obligations of General Partner 17 6.03 Release and Indemnification 17 6.04 Power of Attorney 18