DESIGN-BUILDER’S OBLIGATIONS Clause Samples

DESIGN-BUILDER’S OBLIGATIONS. 4. The System requires a broadband connection with the Internet (e.g., at a minimum, T1, cable modem, or DSL) for effective use. Design-Builder must furnish its own hardware and software, including, but not limited to, personal computers, peripheral software, virus protection software and high-speed document scanners. All written communication and document transmittal from Design-Builder to the Commission will occur via the System. In the event that hand signatures and/or stamps are required for a document, unless otherwise directed by the Authorized Commission Representative, the transmittal of such document shall be made simultaneously via the System and hard copy; hard copy shall be transmitted as required by the Contract Documents. Signed and/or stamped documents must then be scanned and uploaded to the System. 5. Design-Builder shall be solely responsible for its use of the System, as well as use of the System by its Subcontractors and Suppliers.
DESIGN-BUILDER’S OBLIGATIONS. Design-Builder can and must perform, or cause to be performed, the Work in strict accordance with the provisions and requirements of this Contract. c. Except for the contents of this Contract, no representation, statement or promise, oral or written, or of any kind whatsoever, by the Commission, its officials, agents, representatives or employees, has induced the Design-Builder to submit a bid or has been relied upon by the Design-Builder, including any reference to (i) the meaning, correctness, suitability or completeness of any provisions or requirements of this Contract; (ii) the nature, existence, or location of materials, structures, obstructions, utilities or conditions, surface or subsurface, which may be encountered at or on the Site; (iii) the nature, quantity, quality or size of any materials, equipment, labor and other facilities needed for the performance of this Contract; (iv) the general conditions which may in any way affect this Contract or its performance; (v) the compensation provisions of the Contract; or (vi) any other matter. d. The Design-Builder was given ample opportunity and time to review the Contract Documents prior to submittal of its bid. e. The Design-Builder acknowledges and understands that the Commission materially relied upon the Design- Builder’s bid in its selection of the Design-Builder to perform the Work. f. Design-Builder’s submittal of its bid establishes that the Design-Builder, in preparing and submitting its bid on which this Contract is based, has complied with and given full consideration to the following bidding requirements: (1) The Design-Builder did obtain for bidding purposes copies of the complete Contract Documents as identified in the advertisement for bids and all addenda issued by the Commission and has become familiar with the same and all Contract requirements and conditions described therein. (2) The Design-Builder has clarified to its satisfaction and complete understanding and acceptance any doubt as to the true meaning and intent of any part or parts of the specifications and plans or other portions of the Contract Documents. (3) The Design-Builder waives any claim for relief because of alleged mistakes or omissions in its bid and that the Design-Builder will be held strictly to its bid as presented. 2. The Design-Builder has the capability and financial resources to perform all of the provisions and requirements of this Contract. 3. The Design-Builder must perform all of its obligations under t...
DESIGN-BUILDER’S OBLIGATIONS. (1) The Design-Builder understands and agrees that time is of the essence in closing out the Work of this Contract. Upon Substantial Completion of the Work, the Punch List will be transmitted to the Design-Builder from the Commission. The Design-Builder agrees to begin performance of Punch List Work immediately after receipt of the Punch List. (2) Failure of the Design-Builder or its Subcontractors to begin the Punch List Work within 3 business Days after receipt of the Punch List will be construed as failure to prosecute the Work of the Contract. (3) Punch List Work will be continuously prosecuted once begun and completed within the period set forth in the Punch List by the Commission Representative. The Commission Representative shall establish the period for completion of the Punch List Work after consultation with the Design-Builder. The period established by the Commission Representative will be based on the Commission Representative’s reasonable, good faith estimate of the time necessary for the Design-Builder to complete the Punch List Work. b. Final Completion and Acceptance of the Work (1) When the Design-Builder deems the Work, including all Punch List Work, to be complete, the Design-Builder must notify the Commission Representative in writing that the Work will be ready for an inspection and/or test on a date specified by the Design-Builder. Such notice is to be given at least 5 Days in advance of said date. If the Commission Representative concurs that the Work will be ready for inspection or testing on the date given, , the Commission will make such inspection within a reasonable period of time. The scheduling of the inspection to determine whether the Work is complete does not relieve the Design-Builder of its responsibilities under the Contract Documents. The Design-Builder must cooperate in all respects in the scheduling and performance of the inspection. Upon inspection, the Commission will determine if Final Completion and Acceptance of the Work has been achieved and will issue a written notice to the Design- Builder confirming the Final Completion and Acceptance of the Work. (2) No action of the Commission, the Commission Representative, the Architect, or their respective Executive Directors, board members, officers, employees, or agents is to be construed as accepting Work done or material furnished in the performance of this Contract, which Work or materials are not in accordance with those specified and required by the Contract. The ...
DESIGN-BUILDER’S OBLIGATIONS. (1) The Design-Builder understands and agrees that time is of the essence in closing out the Work of this Contract. Upon Substantial Completion of the Work, the Punch List will be transmitted to the Design-Builder from the Commission. The Design-Builder agrees to begin performance of Punch List Work immediately after receipt of the Punch List. (2) Failure of the Design-Builder or its Subcontractors to begin the Punch List Work within 3 business Days after receipt of the Punch List will be construed as failure to prosecute the Work of the Contract. (3) Punch List Work will be continuously prosecuted once begun and completed within the period set forth in the Punch List by the Commission Representative. The Commission Representative shall establish the period for completion of the Punch List Work after consultation with the Design-Builder. The period established by the Commission Representative will be based on the Commission Representative’s reasonable, good faith estimate of the time necessary for the Design-Builder to complete the Punch List Work.
DESIGN-BUILDER’S OBLIGATIONS 

Related to DESIGN-BUILDER’S OBLIGATIONS

  • Owner’s Obligations 5.1 The Owners shall pay all sums due to the Managers punctually in accordance with the terms of this Agreement. 5.2 Where the Managers are providing Technical Management in accordance with sub-clause 3.2, the Owners shall: (i) procure that all officers and ratings supplied by them or on their behalf comply with the requirements of STCW 95; (ii) instruct such officers and ratings to obey all reasonable orders of the Managers in connection with the operation of the Managers’ safety management system. 5.3 Where the Managers are not providing Technical Management in accordance with sub-clause 3.2, the Owners shall procure that the requirements of the law of the flag of the Vessel are satisfied and that they, or such other entity as may be appointed by them and identified to the Managers, shall be deemed to be the “Company” as defined by the ISM Code assuming the responsibility for the operation of the Vessel and taking over the duties and responsibilities imposed by the ISM Code when applicable.

  • HIRER’S OBLIGATIONS 10.1 The Hirer must comply with and shall procure that its officers, agents, employees and Delegates comply with: (a) all applicable laws, statutes and regulations from time to time in force in relation to the hire and use of the Facilities and attendance at the Venue; (b) any health and safety regulations, and security and other reasonable requirements that apply to the Venue and/or the Room and have been communicated to the Hirer; (c) any instructions from any member of wallacespace staff in the event of a fire or other emergency or in respect of any other security or health and safety matters. 10.2 The Hirer shall not hold itself out to be connected to wallacespace, nor, without the prior written consent of wallacespace, use the wallacespace name or logos on any promotional or other materials. 10.3 The Hirer will not affix any poster, notice, placard, sign or other item to any part of the Venue or Room nor erect any display or stand unless wallacespace’s prior written agreement has been obtained. 10.4 The Hirer will be responsible for keeping proper order and for ensuring that all Delegates behave in an appropriate manner. This includes the treatment of wallacespace staff with respect, not causing damage to the Venue or Equipment, not introducing any malicious or technologically harmful material to wallacespace’s tech systems and not using the tech systems for any unlawful purpose. wallacespace reserves the right to exclude any Delegate from the Venue who does not behave in such a manner. 10.5 Externally purchased or produced food and drink may not be brought into the Venue for consumption. In particular, other than that supplied by wallacespace, wines, spirits or other beverages are not permitted to be brought into the Venue for consumption unless prior written consent has been given by wallacespace and wallacespace’s “corkage” charges from time to time shall be added to, and payable with, the Price. 10.6 The Hirer shall indemnify wallacespace from and against all claims, demands, actions, costs, expenses, damages, penalties or proceedings arising out of or connected with any loss or theft of or damage to any property of any person at the Venue, damage to the Venue or Facilities, or any death or injury of any person at the Venue as a result of any act or omission of the Hirer or its officers, employees, agents or Delegates or any other person on the Venue with the actual or implied authority of any of them. 10.7 The Hirer shall maintain in force, with a reputable insurance company, public liability and any other insurance at an amount not less than £2,000,000 to cover the liabilities that may arise under or in connection with the Agreement and shall produce to wallacespace on request both the insurance certificate giving details of cover and the receipt for the current year's premium in respect of each insurance.

  • Provider’s Obligations 9.1 The Provider shall: 9.1.1 Ensure or procure the Availability of the DER and perform the Flexibility Services in compliance with this Agreement and all Applicable Laws, Statutory Requirements and Good Industry Practice; 9.1.2 own and/or manage the DER during the Term and shall ensure that all technical, communication and data provision requirements set out in Schedule 4 and Schedule 6 are complied with at all times; 9.1.3 provide the Flexibility Services in accordance with all UK health, safety and environment legislation and approved codes of practice; 9.1.4 remedy any defect of the Flexibility Services with Good Industry Practice and to the satisfaction of the Company; 9.1.5 act diligently and in good faith in all of its dealings with the Company; 9.1.6 ensure that it is available at all times on reasonable notice to provide such assistance or information as the Company may reasonably require in connection with the Flexibility Services; 9.1.7 disclose the existence of any agreement or arrangement the Provider may have in respect of the DER that provides Flexibility Services under this Agreement that could reasonably impact Availability of the DER or the ability of the Provider to perform its obligations under this Agreement; 9.1.8 at the request of the Company, make available to the Company information in relation to the metering equipment at the DER, including but not limited to a manufacturers test certificate, single line diagram, and technical information from the manufacturer of the meter, which sets out the typical errors of the meter; 9.1.9 permit and grant (or procure) free and unrestricted rights of access to and over and egress from the Site to the Company and/or its agents or sub-contractors (upon reasonable notice) as the Company may reasonably require in order to inspect and test the DER, or to install, maintain, replace or remove communication equipment belonging to the Company in relation to the provision of flexibility services.

  • Managers’ Obligations 4.1 The Managers undertake to use their best endeavours to provide the agreed Management Services as agents for and on behalf of the Owners in accordance with sound ship management practice and to protect and promote the interests of the Owners in all matters relating to the provision of services hereunder. Provided, however, that the Managers in the performance of their management responsibilities under this Agreement shall be entitled to have regard to their overall responsibility in relation to all vessels as may from time to time be entrusted to their management and in particular, but without prejudice to the generality of the foregoing, the Managers shall be entitled to allocate available supplies, manpower and services in such manner as in the prevailing circumstances the Managers in their absolute discretion consider to be fair and reasonable. 4.2 Where the Managers are providing Technical Management in accordance with sub-clause 3.2, they shall procure that the requirements of the law of the flag of the Vessel are satisfied and they shall in particular be deemed to be the “Company” as defined by the ISM Code, assuming the responsibility for the operation of the Vessel and taking over the duties and responsibilities imposed by the ISM Code when applicable.

  • Developer’s Obligations 7.1.1 In consideration of the Rights hereby granted, the Developer shall pay to the Authority an annual fee of Rs. /- (Rupees only) (“Fee”) commencing from the 1st (first) anniversary of Appointed Date. The Fee is exclusive of GST and all other applicable taxes and shall be payable by the Developer at actual over and above the Fee. The Fee is payable to the Authority on or before 30 (thirty) days prior to the start of every year in advance as set out in Schedule 1 throughout the Agreement Period. During the Agreement Period the Fee shall be increased by 5% (five percent) every year over the previous year’s Fee on compounded basis. 7.1.2 The Developer should pay the Fee to the Authority notwithstanding the fact that, the development of Project Facilities is not completed within the specified period or Developer does not start the commercial operation of the Project. In other words, the Developer shall not be entitled to seek any reduction of Fee, claim, damages, compensation or any other consideration from the Authority on account of any reason. 7.1.3 Any delay in payment of the Fee shall attract an interest for the delayed period at the rate of SBI PLR plus 5% per annum on the outstanding amount, which shall be due from the date of such payment till the amount is realized by the Authority. In addition to the foregoing, any delay in payment of Fee beyond a period of 60 (sixty) days from the due date of such payment will be construed to be Material Breach under this Agreement.