Drilling and Completion Clause Samples

POPULAR SAMPLE Copied 1 times
Drilling and Completion. APH shall use reasonable efforts to cause each Program Well to be drilled to their respective depth as provided in the Proposal for such Program Well, in accordance with the terms of this Agreement and the JOA.
Drilling and Completion. All ▇▇▇▇▇ shall be Drilled and Completed in accordance with the terms of the Operating Agreement. Prior to spudding each Well subject to this Agreement, Nytis shall deliver an AFE, in the form as set forth on Exhibit D attached hereto (each a “Well AFE”), setting forth the estimate of Drilling and Completion Costs for such Well. It is understood and agreed that the Well AFEs represent an estimate of the costs of drilling and completing the ▇▇▇▇▇, but final billing will be based on actual costs incurred. ▇▇▇▇▇▇▇▇ will be charged pursuant to the Operating Agreement unless otherwise set forth herein. In connection with any Well AFE, Nytis agrees promptly to provide any additional information regarding the Well which is reasonably requested by Liberty. The location of each Well shall be determined by the Operator in its sole discretion. Unless (a) otherwise consented to in writing by Liberty, or (b) pursuant to Section 2.5(a), Nytis shall drill each Well as a Horizontal Well running through the Berea Sandstone Geologic Interval. Nytis shall drill, complete, equip and produce, or plug and abandon each of the ▇▇▇▇▇, with due diligence and reasonable dispatch in accordance with applicable laws and the Operating Agreement.
Drilling and Completion. The Manager agrees to enforce, on behalf of the Company, the obligation of the Operators to conduct drilling and completion operations on each Net Well with due diligence and in a good and workmanlike manner, and further agrees to provide and pay for all tangible and intangible drilling and completion costs which are convenient or necessary in the judgment of the respective Operator to drill and complete the Net Well(s) and which are charged by such Operator to the working interest in the ▇▇▇▇▇ which constitute the Net ▇▇▇▇▇ held by the Manager pursuant to the Operating Agreements and transferred to the Company pursuant to this Agreement, including costs of acquisition, maintenance and operation of equipment, labor, materials, supplies, cementing, casing, well treatment, engineering, geology, surveying, or other technical or consulting services, permitting, bonding, well logs, utilities, insurance, administrative and office expenses and Operator overhead, through Completion. The Manager further agrees to enforce, on behalf of the Company, the obligation of the Operators to cause and supervise the acquisition and installation of the Post-Completion Facilities specifically identified on the AFE with respect to each Net Well or such other post-Completion Facilities as may be actually installed with respect to such ▇▇▇▇▇ to place them in production, with due diligence and in a good and workmanlike manner, and further agrees to provide and pay for the acquisition and installation of all such Post-Completion Facilities with respect to the Net Well(s) and which are charged by such Operator to the working interest in the ▇▇▇▇▇ which constitute the Net ▇▇▇▇▇ held by the Manager pursuant to the Operating Agreements and transferred to the Company pursuant to this Agreement. C.
Drilling and Completion. (a) All Carry ▇▇▇▇▇ shall be drilled and completed as Horizontal ▇▇▇▇▇ (unless otherwise agreed by Operator and Carbon TN Mining Co) in accordance with the terms of the Operating Agreement. ▇▇▇▇▇▇▇▇ will be charged pursuant to the Operating Agreement unless otherwise set forth herein. The location of each Well shall be determined by the Operator in its sole discretion. Operator shall complete, equip and produce, or plug and abandon each of the ▇▇▇▇▇, with due diligence and reasonable dispatch in accordance with applicable laws and the Operating Agreement. (b) With respect to the Tennessee Mining Tract, Operator will provide to Carbon TN Mining Co (i) copies of daily production reports with respect to all completed ▇▇▇▇▇, (ii) at least quarterly with respect to all completed ▇▇▇▇▇ (A) production charts, records and information, (B) all forms and reports filed with any governmental entity and (C) information concerning the drilling, testing and completing of the ▇▇▇▇▇, (iii) upon request of Carbon TN Mining Co, current schedules of the Leases and the ownership interests of all working interest owners in the Leases and (iv) as requested by Carbon TN Mining Co, other information relating to the Leases, Carbon TN Mining Co Working Interest, ▇▇▇▇▇ or any operations otherwise conducted on the Tennessee Mining Tract or with respect to any other assets in which Carbon TN Mining Co jointly owns an interest with Operator or its affiliates that is in the possession of Operator or its Affiliates or is available to, or can be produced by, Operator or Operator without undue burden.
Drilling and Completion. ‌ Production results from the initial ▇▇▇▇▇ would be used to plan future drilling programs. Fewer ▇▇▇▇▇ may be drilled than are proposed because of geologic and market uncertainties or changes in drilling and completion methods. Drilling operations would be conducted in compliance with Federal Oil and Gas Onshore Orders and all applicable NMOCD rules and regulations. A mobile drilling rig (“rig”) and other equipment would be transported to the location, where components would be assembled and the rig ▇▇▇▇▇▇▇ erected. Other facilities and equipment that would be on the drilling site include: pipe racks, catwalk, ▇▇▇▇▇▇, rig personnel camper trailers, closed loop mud system, and personnel vehicles. Drilling would begin, continuing through any fresh water bearing formations, then halt. A “shoe” (i.e. a seal) would be landed at the bottom of the hole, a surface pipe (“surface casing”) would be installed from the surface down to the shoe. Cement would be circulated between the rough wall of the well bore and the casing pipe (“annulus”). The casing would be pressure-tested to ensure that a seal has been created. After the cement is sufficiently cured, drilling would resume and continue until reaching the production zone or other identified “target” formation. An intermediate casing would be installed and cemented in place through most or all of the open hole section just drilled in order to seal off any zones that may present problems in drilling deeper portions of the well and to maintain the integrity of the hole. Drilling would resume, entering and continuing horizontally through the target formation to the bottom hole location. A production casing or “production liner” (shortened string of casing that suspends from the intermediate casing) would typically then be landed and cemented in place. Casings prevent interzonal interaction between fluids from different geologic strata, particularly oil and gas bearing zones and usable water zones, and help to maintain the integrity of the bore. Drilling operations would continue 24-hours a day until complete. Drill cuttings would be hauled from the location and disposed of at an approved facility. Following drilling, the drilling rig is typically moved off the location, and a smaller completion rig is moved onto the location. Perforations would be shot through the production string across the zone of the target formation to provide entry points for the hydraulic fracturing fluids. If hydraulic fracturing is planned, ...

Related to Drilling and Completion

  • PROGRESS AND COMPLETION 8.2.1 All time limits stated in the Contract Documents are material terms and time is the essence of the Contract. A failure by Contractor to do what is required by the time specified in the Contract Documents is a breach of the contract. 8.2.2 The Contractor shall begin the Work on the date of commencement as defined in 8.2.3 If in the sole opinion of the State, the Contractor fails to commence work on the project or to complete the work of said project within the time specified above, or to prosecute the work in such a manner that it appears that the completion date can be assured, the State shall have the right to notify the Contractor by Certified Mail that the terms of the Contract have been violated, and that effective immediately the Contract is terminated and the State has the right to and in fact is taking over and attending to completion of the project without prejudice to the State's remedies for any losses sustained

  • Commencement and Completion The Work shall commence on _______________, 20__ and shall be complete in accordance with this Agreement without delay on ______________, 20__. The term “day”, used throughout this Agreement, refers to calendar days. Contractor shall not be entitled to any additional compensation for any Permitted Delays. If this Agreement is not signed and returned to the Owner before any work commences, this Agreement will be considered as accepted as presented to the Contractor.

  • Felling and Bucking Felling shall be done to minimize breakage of Included Timber and dam- age to residual timber. Unless agreed otherwise, felling shall be done by saws or shears. Bucking shall be done to permit removal of all minimum pieces set forth in A2. B6.411 Felling in Clearings. Insofar as ground conditions, tree lean, and shape of clearings per- mit, trees shall be felled so that their tops do not extend outside Clearcutting Units, construction clearings, and ar- eas of regeneration cutting. B6.▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇▇. Stumps shall not exceed, on the side adjacent to the highest ground, the maximum heights set forth in A6, except that occasional stumps of greater heights are acceptable when Purchaser determines that they are necessary for safe and efficient conduct of logging. Unless otherwise agreed, Purchaser shall re-cut high stumps so they will not exceed heights specified in A6 and shall dispose of severed portions in the same manner as other logging debris. The ▇▇▇▇▇ heights shown in A6 were selected with the objective of maximum reasonable utilization of the timber, unless Sale Area Map shows special areas where ▇▇▇▇▇ heights are lower for aesthetic, land treatment, or silvicultural rea- sons.

  • Synchronization, Commissioning and Commercial Operation 5.1.1 The SPG shall give PGVCL at least thirty (30) days’ advanced preliminary written notice and at least fifteen (15) days’ advanced final written notice, of the date on which it intends to synchronize the Solar Power Project to the Grid System. 5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the SPG to the Grid System when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the SPG at its generation facility of the Power Project at its own cost. The SPG shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/ and checking/verification is made by the concerned authorities of the PGVCL. 5.1.4 The SPG shall immediately after each synchronization/tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. In addition, the SPG will inject in-firm power to grid from time to time to carry out operational/ functional test prior to commercial operation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project. 5.1.5 The SPG shall commission the Project within nine (9) Months from the Date of execution of this PPA. Declaration of COD shall be certified by the commissioning committee. 5.1.6 The Parties agree that for the purpose of commencement of the supply of electricity by SPG to PGVCL, liquidated damages for delay etc., the Scheduled Commissioning Date as defined in this Agreement shall be the relevant date.

  • Construction Completion The related Construction shall have been completed substantially in accordance with the related Plans and Specifications, the related Deed and all Applicable Laws, and such Leased Property shall be ready for occupancy and operation. All fixtures, equipment and other property contemplated under the Plans and Specifications to be incorporated into or installed in such Leased Property shall have been substantially incorporated or installed, free and clear of all Liens except for Permitted Liens.