Elbridge Substation. National Grid shall be responsible for and shall make improvements to the Elbridge Substation to receive and accommodate the Proposed Line, Relocated Line 15, and Bused Line 5. • February 2016: Article VII Certificate Order Issued • April 2016: Submission of EM&CP Requesting Approval • April 2016: Submission of USACOE Permit Application • 4 months after EM&CP submission: Issuance of EM&CP Approval Order • 4 months after USACOE application submission: Issuance of USACOE Permit • 5 months after Submission of EM&CP: Commence Construction (Phase 1) (If EM&CP is approved by that time) • 6 months after Phase 1 Construction Start: Complete Construction (Phase 1) • 6 months after Phase 1 Construction Start: In-Service Date (Phase 1) • 2 month after Phase 1 Construction Start: Commence Construction (Phase 2) • 7 months after Phase 2 Construction Start: Complete Construction (Phase 2) • 7 months after Phase 2 Construction Start: In-Service Date (Phase 2) Note: This schedule does not reflect potential federal permit or PSC Certificate conditions that may restrict the ability to begin construction as noted. The dates above represent the Partiespreliminary schedule, which is subject to adjustment, alteration, and extension. Neither Party shall be liable for failure to meet the above Estimated Milestone Schedule, any milestone, any in-service date, or any other projected or preliminary schedule in connection with this Agreement, the Work or the ATP. National Grid does not and cannot guarantee or covenant that any outage necessary in connection with the Work will occur when presently scheduled, or on any other particular date or dates, and shall have no liability arising from any change in the date or dates of such outages. Insurance Requirements In accordance with Section 13 of the Commercial Agreement relating to the ATP Project, National Grid and NYSEG have elected to self-insure to the level of their respective self-insured retention limits of any single loss and maintain excess insurance coverage above this level and in accordance with amounts set forth below:  Workers Compensation and Employers Liability Insurance as required by the State of New York. If required, coverage shall include the U.S. ▇▇▇▇▇▇▇▇▇ and Harbor Workers' Compensation Act and the ▇▇▇▇▇ Act.  Commercial General Liability (Including Contractual Liability), covering all activities and operations to be performed by it under this Agreement, with the following minimum limits: (A) Bodily Injury - $...

Related to Elbridge Substation

  • Water Supply The system may or may not meet state and local requirements. It is the right and responsibility of Buyer to determine the compliance of the system with state and local requirements. [For additional information on this subject, request the “Water Supply and Waste Disposal Notification” form.]

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • ADJACENT EXCAVATION-SHORING If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.