Engineering Analyses Clause Samples

Engineering Analyses. We will use data obtained from the subsurface exploration and laboratory tests to evaluate the subsurface profile and groundwater conditions, and to perform engineering analyses related to pavement design and performance.
Engineering Analyses. Consultant will assist City and Contractor in confirming that cover manufacturer for Project will be same cover manufacturer that supplied the Digester 611 cover. Consultant will meet with Owner and digester cover manufacturer to understand design considerations specific to the manufacturer's scope of supply. Design for a mixing system for Digester 612 is not included in this scope but the possibility of a future mixer installation will be considered in the lid design.
Engineering Analyses. Analyses will include feasibility of stormwater infiltration and flexible and rigid pavement design.
Engineering Analyses. The County has asked that we provide a preliminary engineering evaluation of a slope failures at Slab Creek Road and at Cape Lookout Drive that has put the adjacent road at risk of losing a lane to continued movement due to erosion and/or undercutting of the slope. Specific services to be completed at each site include the following items. • Conduct a program of laboratory testing on select soil and/or rock samples collected under separate contract to evaluate engineering properties of the materials. For budgeting purposes, we have assumed our testing will include moisture content, grain size distribution, Atterberg limit tests, unconfined compression testing of rock cores, and laboratory testing for corrosion potential. However, actual tests will depend upon the materials encountered during our explorations. • Evaluate seismic hazards, including ground shaking, ground shaking amplification, and liquefaction. • Conduct preliminary engineering analysis including slope stability analysis to develop alternatives for the mitigation of the slope instability. • Prepare one report outlining our findings and preliminary recommendations at each site, including information related to the following: • Provide project management and support services for this portion of the work. • A site-specific seismic response analysis is not required. We propose to complete our work on a time-and-materials basis per the attached Fee Schedule. We anticipate costs will be approximately $80,357. Our services will be performed in accordance with the standard of care of our profession. The attached Terms and Conditions and any exhibits or attachments referenced herein are incorporated into our agreement with you, and, by your authorization to proceed, you are agreeing to these Terms and Conditions.
Engineering Analyses. We will use data obtained from the subsurface exploration and laboratory tests to evaluate the subsurface profile and groundwater conditions, and to perform engineering analyses related to pavement design and performance. SEH, Inc. Proposal QTB168701 November 14, 2022 We will prepare a report including: ▪ A sketch showing the boring locations. ▪ Logs of the borings describing the materials encountered and presenting the results of our groundwater measurements and laboratory tests. ▪ A summary of the subsurface profile and groundwater conditions. ▪ Discussion identifying the pavement and subsurface conditions that will impact pavement design and construction. ▪ Discussion regarding the reuse of on-site materials during construction. ▪ Recommendations for preparing pavement subgrades, and the selection, placement and compaction of fill. ▪ Recommended CBR value to aid in pavement design. ▪ Recommended subgrade modulus (k). We will only submit an electronic copy of our report to you unless you request otherwise. At your request, we can also send the report to additional project team members. We anticipate performing our work according to the following schedule. ▪ Drill rig mobilization – within about 6 weeks following receipt of written authorization; we have assumed this work will take place in tandem with the Runway 8/26, Taxiway B, and QTA Facility project. ▪ Field exploration – 1 day on site to complete the work ▪ Classification and laboratory testing – within 2 weeks after completion of field exploration ▪ Preliminary results – within 2 weeks after completion of field exploration ▪ Final report submittal – within 4 weeks after completion of field exploration If we cannot complete our proposed scope of services according to this schedule due to circumstances beyond our control, we may need to revise this proposal prior to completing the remaining tasks. SEH, Inc. Proposal QTB168701 November 14, 2022

Related to Engineering Analyses

  • Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. (a) A7 to show Purchaser’s performance responsibility. (b) The Schedule of Items to include costs of survey and design, as provided under B5.24, and adjust Timber Sale Account, as provided in B5.

  • Reverse Engineering The Customer must not reverse assemble or reverse compile or directly or indirectly allow or cause a third party to reverse assemble or reverse compile the whole or any part of the software or any products supplied as a part of the Licensed System.

  • Technology Research Analyst Job# 1810 General Characteristics

  • Research Analyst Independence The Company acknowledges that the Underwriters’ research analysts and research departments are required to be independent from their respective investment banking divisions and are subject to certain regulations and internal policies, and that such Underwriters’ research analysts may hold views and make statements or investment recommendations and/or publish research reports with respect to the Company and/or the offering that differ from the views of their respective investment banking divisions. The Company hereby waives and releases, to the fullest extent permitted by law, any claims that the Company may have against the Underwriters with respect to any conflict of interest that may arise from the fact that the views expressed by their independent research analysts and research departments may be different from or inconsistent with the views or advice communicated to the Company by such Underwriters’ investment banking divisions. The Company acknowledges that each of the Underwriters is a full service securities firm and as such from time to time, subject to applicable securities laws, may effect transactions for its own account or the account of its customers and hold long or short positions in debt or equity securities of the companies that may be the subject of the transactions contemplated by this Agreement.

  • Geotechnical Engineer « »« » « » « » « » « »