Engineering Lots Clause Samples

Engineering Lots. For each and every engineering Lot started by Jazz as an HVL or P1 lot, produced and delivered by Jazz at the request of Skyworks, Jazz shall make and hold a backup Lot, [. . . *** . . .], like the delivered HVL or P1 Lot. Unless otherwise agreed, Jazz will start the backup Lot within [. . . *** . . .] after starting the engineering Lot. Jazz shall hold the backup Lot at Metal One for a reasonable period of time not to exceed [. . . *** . . .], and upon receipt of a PO for the purchase of the back up lot, promptly complete and deliver the lot to Skyworks. Backup lots for any production P1 lot and HVL production lot shall be by mutual agreement only.
Engineering Lots. Minimum Engineering Lot Size: Six (6) Wafers. Cost per Engineering Lot Wafer: [***]. Engineering Lots can be staged at any step of the Process.
Engineering Lots. Engineering Lot pricing shall include a set-up charge per lot of three-hundred and fifty dollars ($350) and a standard cost charged monthly as identified in Exhibit B.
Engineering Lots. MARVELL may order engineering lots where it seeks the qualification of an update to a Product or a Product not previously manufactured by TSMC, or seeks to otherwise improve functionality and yield, or to make any other engineering changes. For purposes of this Agreement, an engineering lot shall contain 12 Wafers. It shall be MARVELL's responsibility to inform and provide TSMC with the specifications for the engineering changes to be made to an engineering lot before production begins.
Engineering Lots. HHNEC shall manufacture and deliver Engineering Lots to AOS in accordance with Schedule 3, part 2, with copies of all relevant test data sheets. During the engineering and Qualification phase, HHNEC shall provide AOS with results of PCM (Process Monitor), CP (Chip Probe) test, die-sort test and in-line monitor testing of every Lot as a partial progress report leading to the outgoing visual inspection specification. As soon as practicable after AOS’ testing of the Engineering Lots, AOS shall provide HHNEC a status update via electronic communications means. If AOS notifies HHNEC that any Wafers in an Engineering Lot are misprocessed for reasons attributable to HHNEC, HHNEC shall at its own expense use commercially reasonable efforts to rerun the Wafers and resubmit Wafers meeting the Specification and the Qualification Criteria. Before release to production, each Product shall fully meet the Qualification Criteria.
Engineering Lots. 4.1.1 For the ENGINEERING LOTS, CSI shall place an order with OKI at minimum twelve (12) WAFERS as one (1) lot or the multiples of twelve (12) per each PRODUCT, provided, however, that OKI shall not be required to engage in more than two (2) runs per month with a maximum of three (3) PRODUCTS at any time). CSI may request, and upon request by CSI OKI shall accept to split the one lot to several groups in the production process for the evaluation purpose. 4.1.2 The output will be shipped to CSI if the WAFER output is not less than nine (9) WAFERS per Lot of input quantity. If the WAFER output is less than nine (9) WAFERS per Lot of input quantity, OKI will inform CSI of the output quantity of the WAFERS and if CSI requires to have the shortage covered, OKI will re-input the WAFERS to cover the shortage of quantity. 4.1.3 Such quantity for ENGINEERING LOTS shall be counted in as part of the allocation foundry capacities provided in Section 4.2.3and 4.2.4 below.
Engineering Lots. Xicor may order engineering lots where Xicor seeks the qualification of an Update or a Product not previously manufactured by ZMD, to seek or otherwise improve functionality and yield, or to make any other engineering changes. For purposes of this Agreement, an engineering lot shall contain at least six wafers. It shall be Xicor's responsibility to inform and provide ZMD with the specifications for the engineering changes to be made to an engineering lot before manufacturing begins. Specifications shall be attached to, or referenced by Xicor's purchase order. Any change to the specifications shall

Related to Engineering Lots

  • Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. (a) A7 to show Purchaser’s performance responsibility. (b) The Schedule of Items to include costs of survey and design, as provided under B5.24, and adjust Timber Sale Account, as provided in B5.

  • Engineering Report Lender shall have received a current Engineering Report with respect to the Property, which report shall be in form and substance reasonably satisfactory to Lender.

  • Fabrication Making up data or results and recording or reporting them.

  • Geotechnical Engineer « »« » « » « » « » « »

  • Engineering Services Definition: Engineering Services includes any service or creative work, the adequate performance of which requires education, training and experience in the application of special knowledge in consulting, investigating, evaluating, planning and designing, engineering principles. Engineering Services covered by the ▇▇▇▇▇▇ Architect-Engineers Act (40 U.S.C. 1102) are not covered in the primary scope of OASIS SB. Examples: Service areas that are included under the Engineering Services discipline include, but are not limited to the following: 1. Systems Engineering 2. Advanced Technology Pilots and Trials 3. Alternative Energy Sources and Engineering 4. Configuration Management 5. Concept Development