EQUALS Sample Clauses

The "EQUALS" clause establishes that two specified items, values, or conditions must be identical or equivalent for the purposes of the agreement. In practice, this clause is often used to compare data fields, contractual terms, or performance metrics, ensuring that both parties are referencing the same standard or value. Its core function is to eliminate ambiguity and ensure consistency by requiring exact matches, thereby reducing the risk of disputes over differing interpretations or mismatched information.
POPULAR SAMPLE Copied 1 times
EQUALS. Value appreciation subject to recapture. Recapture due equals the lesser of this figure or the amount of subidy received.
EQUALS. The Professional shall promptly and in accordance with all Project schedule requirements, review and approve, reject or take other appropriate action on proposed substitutions or “equal materials or equipment”. The Professional shall not approve any such proposed equal materials or equipment unless such equals conform to (i) the Project design concept; (ii) the Construction Documents; (iii) the Contracts for Construction; and (iv) the Owner’s Approved Construction Budget.
EQUALS. Final ACO Performance Year HCC Risk Score 1.1368 1.1497 1. ACO HCC risk score for a given Performance Year and for a given entitlement category 1.1720 1.2619 2. DIVIDED BY: Coding Factor Adjustment 1.0000 1.0482 EQUALS: Coding Factor-Adjusted HCC Risk Score 1.1720 1.2038
EQUALS. Final ACO Performance Year HCC Risk Score 1.4230 1.4230 6.4 Risk-adjusted trended baseline‌ For a given performance year, the trended, risk adjusted baseline for each entitlement category is equal to:
EQUALS. Final ACO Performance Year HCC Risk Score 1.1720 1.2072
EQUALS. Any reference to a particular product, either by trade name or by limited description, is solely for the purpose of more clearly indicating the minimum standard of quality desired. Such reference shall not be interpreted as limiting competition.
EQUALS. Authorship of a book (1) 9 graduate semester credits Co-authorship of a book (1) 5 graduate semester credits
EQUALS. Professional certification program approved or sanctioned by a recognized professional organization (10) 45 documented contact hours = 2/3 graduate semester credit Third party certification or licensure Credits (10) 1-5 graduate semester credits**
EQUALS. Please indicate dates and price for each day used to determine Market Price:
EQUALS. Any deviation from the Specification which is defined as follows: A replacement for the specified material, device, procedure, equipment, etc., which is recognized and accepted as substantially equal to the first listed manufacturer or first listed procedure specified after review by the Architect/Engineer, and may be rejected or approved at the sole discretion of the Owner. All equals must be substantially equivalent to the first manufacturer or first procedure listed in the Specifications with reference to all of the following areas: the substance and function considering quality, workmanship, economy of operation, durability, and suitability for purposes intended; size, rating, and cost. The equal does not constitute a modification in the scope of Work, the Schedule, or Architect/Engineer’s design intent of the specified material, device, procedure, equipment, etc.