Horizontal Clause Samples

Horizontal. Wiring Landlord shall provide and install, at its expense, a horizontal subsystem that will provide a cable route from the TR’s and computer room to each station on the floor. The subsystem should be made up of one of the following: (i) Under floor duct system (e.g., ▇▇▇▇▇▇ duct system). (ii) Suspended ceilings. (iii) Raised flooring. (iv) Conduit.
Horizontal. WAC ▇▇▇-▇▇▇-▇▇▇ states, “The datum for the horizontal control network in Washington shall be NAD83 (1991) [the North American Datum of 1983] as officially adjusted and published by the National Geodetic Survey of the United States Department of Commerce and as established in accordance with Chapter 58.20
Horizontal. The top of wall shall be within 4 inches of the plan location. However, the Contractor shall ensure that all blocks are installed and located on City Property or City Right of Way.
Horizontal. Projected Coordinate System Name: NAD_1983_2011_StatePlane_NewJersey_FIPS_2900_Ft_US Projection: Transverse Mercator False_Easting: 492125.00000000 False_Northing: 0 Central_Meridian: -74.50000000 Latitude_of_Origin: 38.83333333 Linear Unit: Foot_US Geographic Coordinate System Name: GCS_NAD_1983_2011 Angular Unit: Degree Prime Meridian: Greenwich Datum: D_NAD_1983_2011 Spheroid: GRS_1980 Semimajor Axis: 6378137 Semiminor Axis: 6356752.314140356 Inverse Flattening: 298.257222101
Horizontal. The combined dimensions of the paved shoulder and the roadway surface remaining outside the Work Zone should be no less than sixteen feet (≥ 16’) in width at any location. Vertical: The overhead clearance should not be reduced to less than fifteen feet (≥ 15’) at any location. The restrictions above apply to all shifts, lane closures, on-site detours and off-site detours whether shown in the Contract or proposed by the Contractor. It shall be the responsibility of the Contractor to verify that these minimum requirements have been met before proceeding with any phase of the Work. Two-lane, two-way roadways may have temporary horizontal restrictions of less than sixteen feet (≥ 16’) during flagging operations. The minimum horizontal clearance should be restored before the flagging operation is removed. At the end of the workday, all equipment, materials, and TTC devices not in use should be moved out of the clear zone or behind positive protection. The clear zone is defined by Georgia Standard 4000W “Lengths of Advancement, Clear Zone Distances, Fill Height Embankment”. For urban roadway with curb, the minimum set back is six (6’) feet from the curb face. If stored behind positive protection, proper lengths of advancement should be maintained. If stored behind guardrail the items shall be a minimum five feet (≥ 5’) from the face of the guardrail and not in the recovery zone of the anchor. The WTCS shall monitor the Work to ensure that all the rocks, boulders, construction debris, stockpiled materials, equipment, tools and other potential hazards are kept clear of the travel lane. Prior approval of the Engineer shall be obtained before any construction traffic is allowed to travel in a reverse direction. If the Contractor’s submittal is approved, the construction traffic shall be separated from normal traffic by appropriate traffic control devices. The parking of Contractor’s and/or workers’ personal vehicles within the work area or adjacent to traffic is prohibited. It shall be the responsibility of the WTCS to ensure that any vehicle present at the worksite is necessary for the completion of the Work. In accordance with MUTCD (6D.03) all workers, within the right-of-way who are exposed either to traffic or to work vehicles and construction equipment within the TTC zone, shall wear high-visibility safety apparel that meets the Performance Class 2 or better. The Contractor shall make every effort to eliminate the use of interim signs as soon as the Work allow...
Horizontal. No change of job classification but a new assignment within the classification in a higher pay bracket. Example: Salad Maker, Senior High in Classification II, moves to ▇▇▇▇▇, Senior High also in Classification II. Although remaining in the same classification, a salary increase results.
Horizontal. The combined dimensions of the paved shoulder and the roadway surface remaining outside the Work Zone shall be no less than sixteen (16) feet in width at any location. Vertical: The overhead clearance shall not be reduced to less than fifteen (15) feet at any location. The restrictions above apply to all shifts, lane closures, on-site detours and off site detours whether shown in the contract or proposed by the Contractor. It shall be the responsibility of the Contractor to verify that these minimum requirements have been met before proceeding with any phase of the Work. Two-lane two-way roadways may have temporary horizontal restrictions of less than sixteen (16) feet provided a flagger operation for one-way traffic is utilized to restrict access to the work area by over-width loads. The minimum horizontal clearance shall be restored before the flagging operation is removed.
Horizontal criteria 1. How will the project contribute to the objectives of the sustainable development strategy? The aims of the project are realistic, identified by locals who know what are their problems, and with the support of project managers from the partnering organization, the activities have been proposed. Its realistic to achieve the objectives set up in the project, because of the trade ▇▇▇▇ which TOKAJ wine has. Nowadays people are coming to the region because of wine, and soon, during the project implementation and after, their number will increase significantly. The strategy how to improve lives of the people in the region fully meets all principles of the sustainable development strategy, because is built on the optimal utilization of natural and human resources of the TOKAJ region. The project with its activities will not harm the environment, will not endangered future generation. It is realistic to expect that the activities proposed will generate earnings in a sustainable way and after the project will end, activities will continue. 2. What are the environmental impacts of the project implementation? What measures are proposed to mitigate the negative environmental impact? All activities in the project proposed comply with the nature protection goals and will contribute to the nature protection. It will not have any negative environment impacts. On the contrary, the activities will set up new systematic approach of urban planning in this wine region will contribute to the optimal utilization of natural resources. The uniqueness of this region will be preserved and maintained properly. 3. How are the gender equality and the non-discrimination principles applied in the project implementation? The key stakeholders of the TOKAJ region have established Association for the purpose of solving their problems and no one is persecuted or excluded form the team, because of gender, race, nationality or religion. 4. How will the project contribute to the enhancement of the bilateral relations with the Swiss Confederation? Institute of Tourism, University of Applied Sciences and Arts, Luzerne, Switzerland is partner 2 in this project and they have contributed to the development of the Final Project Proposal . They have an interest to participate on the whole project management. 5. What innovative technologies/processes will be applied within the project implementation? Revival of the traditional technologies (e.g. traditional wine production used just in the TO...
Horizontal rate of change should not exceed 3 mm per 9.0 m measured in increments of
Horizontal. Wiring LESSOR shall provide and install, at its expense, a horizontal subsystem that will provide a cable route from the TR’S and computer room to each station on the floor. The subsystem should be made up of one of the following: a. Under floor duct system (e.g., ▇▇▇▇▇▇ duct system). b. Suspended ceilings. c. Raised flooring. d. Conduit. e. Powerpoles.