Installation Activities Sample Clauses
The Installation Activities clause defines the responsibilities and procedures related to the setup and assembly of equipment or systems at a specified location. It typically outlines the scope of work, required standards, timelines, and any necessary coordination with other parties or site conditions. For example, it may specify who is responsible for providing materials, ensuring site readiness, and supervising the installation process. This clause ensures that all parties understand their obligations during installation, reducing the risk of delays, disputes, or incomplete work.
POPULAR SAMPLE Copied 1 times
Installation Activities. A digital camera will be used to document the post- retrofit conditions. Inspect and verify the air conditioning compressor controller installation to see if they meet the specifications of the DEA in terms of quantity. An annual visual inspection of a sample of units will occur to ensure the equipment is still in place and operational. Option B is for projects where: i) the potential to perform and generate savings needs to be verified, and ii) actual performance during the term of the Agreement needs to be measured (verified). Option B involves procedures for verifying the same items as Option A plus actual achieved energy savings during the term of the Agreement. Performance verification techniques involve engineering calculations with metering and monitoring. Option B: • Confirms that the proper equipment/systems were installed and that they have the potential to generate the predicted savings • Determines an energy (and cost) savings value using measured data taken as needed throughout the M&V term. Methods employed in this option will involve the use of short or long-term measurement of one or more variables. Reference: NEMVP Version 1.0 4.1 Energy Management System - Temperature Setback / Optimal Start B 4.2 Energy Management System - Demand Controlled Ventilation B 4.3 Energy Management System - Exhaust Fan Control & Kitchen Hood Controls B 8 Heating System - Boiler Replacement B Interaction: Demand Control Ventilation (DCV) Measuring Equipment: Energy Management System Measurement Period: 15-minute samples Measurement Frequency: Continuous measurement Measurement and Verification Details: Energy Management system will continuously monitor post-retrofit outdoor air temperature, space temperature, and unit status. The date-time stamp will be included to differentiate occupied/unoccupied and summer/winter periods. JCI will also monitor and record the setpoint changes during the Guarantee Period. Measuring Equipment: Energy Management System Measurement Period: 15-minute samples Measurement Frequency: Continuous measurement Energy Management system will continuously monitor post-retrofit CO2 levels, outside air temperature, and outside air damper position. The date-time stamp will be included to differentiate occupied/unoccupied and summer/winter periods. Measuring Equipment: Energy Management System Measurement Period: 15-minute samples Measurement Frequency: Continuous measurement Energy Management system will continuously the status of the exhaust ...
Installation Activities. Subject to the timely receipt of NuPathe’s payments as set forth in the payment schedule attached hereto as Annex 4 (the “Payment Schedule”), LTS AG shall use its Commercially Reasonable Efforts to perform the Installation Activities and to perform those in accordance with the Project Plan.
(a) In the event that LTS AG becomes aware that the Commercial Equipment will not meet the Requirements or the Installation Activities will not be completed in accordance with the Project Plan, then LTS AG shall immediately notify NuPathe in writing. In such event, LTS AG and NuPathe shall jointly agree in writing to necessary changes, if any, to the Commercial Equipment or Installation Activities or Project Plan. If the amounts in the Payment Schedule for the purchase of the Commercial Equipment or the man-hours set forth therein for the Installation Activities are not sufficient, the Parties shall discuss in good faith coverage of the costs for completion of the purchase of the Commercial Equipment and the Installation Activities. LTS AG shall not spend any amounts or man-hours exceeding the Payment Schedule or Project Plan, as applicable, without the prior written agreement of the Parties.
(b) In the event that NuPathe requests a material change to the Commercial Equipment or Project Plan (a “Material Change”), LTS AG shall provide NuPathe with a revised Payment Schedule and Project Plan and shall provide an overview of non-cancellable obligations that LTS AG has in connection with the Commercial Equipment and the costs related thereto. LTS AG shall not change the Commercial Equipment or revise the Project Plan without the prior written agreement of the Parties. In the event that due to a Material Change non-cancellable obligations of LTS AG become obsolete, then NuPathe shall cover those costs. LTS AG shall in any event use its reasonable best efforts to minimize those costs after the Parties reached agreement to actually change the Commercial Equipment or the Project Plan.
Installation Activities. EVCS shall, at its sole cost and expense, be responsible for all installation activities (hereafter "Installation Activities") required to support the operation of the Equipment, and services therewith, including the hiring and coordination of all vendors and contractors; the installation of electrical equipment, utility lines, hardware, and software; site preparation, trenching, repaving, and landscaping.
Installation Activities. Accuracy of the as-built will be verified (sampling will be conducted as detailed in the sampling procedure). A digital camera will be used to document the post-retrofit conditions. A thermal gun or an infrared camera will be used to verify installation. Visual inspections of a sample of insulation will occur annually.
Installation Activities a. EVGO shall, at its sole cost and expense, be responsible for all installation activities (the “Installation Activities”) required to support the operation of the Charging Station and services therewith, including furnishing and installing all materials, equipment, and labor required for the installation of the Charging Station. This includes but is not limited to all work related to the development of plans and documents for supplying power to the Charging Station per PG&E standards and CITY requirements; the hiring and coordination of all vendors and contractors; the installation of electrical equipment, utility lines, hardware, and software; and site preparation, trenching, repaving, and landscaping. Following the installation, EVGO shall activate and test the Charging Station. EVGO knows of prevailing wage requirements under the laws of the State of California and shall pay prevailing wages for all Installation Activities in accordance with those laws.
b. EVGO may, at any time during the Term and in its discretion modify, including, without limitation, upgrade, replace, and/or remove all or a portion of the Charging Station (collectively, “Modifications”), whether or not said items are considered fixtures and attachments to the Premises under applicable laws; provided, however, before any such Modifications, EVGO shall provide at least sixty (60) days prior notice to CITY and, to be included in such notice, supporting documentation of the Charging Station’s customer utilization justifying the need for any such Modifications.
c. Before beginning any Installation Activities, EVGO shall provide a copy of the construction schedule, Charging Station specifications, and installation plans to CITY for its approval, which approval shall not be unreasonably delayed or withheld. No work will begin until plans have been approved by CITY and all applicable permits and certifications have been obtained from CITY.
d. With respect to its Installation Activities, EVGO shall ensure that it or its designated contractor(s) and/or service providers perform Installation Activities only during times and days acceptable to CITY and in a manner so as not to unreasonably interfere with CITY’s business operations.
e. On completion of any Installation Activities under this Agreement, CITY shall not retain any ownership rights of the Charging Station and related equipment, hardware, software, signage, and supporting equipment and structures at the Property.
Installation Activities. A digital camera will be used to document the post- retrofit conditions. Inspect and verify the compressor installation to see if they meet the specifications of the DEA in terms of quantity. ECM 15: Refrigeration Compressor Controllers M&V Option: NEMVP-A (One Time) A digital camera will be used to document that a controller does not exist.
Installation Activities. Aptum shall have the right to require Customer to immediately stop any Customer Servicing without liability to Aptum, if Aptum, in its sole discretion, determines that the Customer Servicing or any part thereof is interfering or may interferre with any operation of the Data Center or the activities and quiet enjoyment thereof by other users.
Installation Activities. A digital camera will primarily be used to document the pre-retrofit conditions. An infrared camera will be used to capture the thermo graphic image of pre-retrofit leaking or failed traps.
Installation Activities. A digital camera will be used to document the post- retrofit conditions. Inspect and verify the installed boilers to see if they meet the specifications of the DEA in terms of quantity. Verify if they perform in accordance with the functional specifications in the DEA and meeting all functional tests and provide commissioning report for each unit. A combustion efficiency test using a combustion analyzer will be performed on the new boilers at a minimum 80% load to confirm that it meets specified efficiency specified in the calculations. This will be done one time during the first heating season and visual inspections every year thereafter. Verification Period & Frequency: One time during both pre-retrofit period and post-retrofit period. Pre-Installation Activities: Verify that the boilers do not have any burner controllers installed on them. Post- Installation Activities: A digital camera will be used to document the post- retrofit conditions. Inspect and verify installed boiler controllers to see if they meet the specifications of the contract in terms of quantity, quality and rating. Verify if they perform in accordance with all functional tests and provide start up and check out report for each unit. Visual inspections every year thereafter. ECM 7: Windows - Window Film M&V Option: NEMVP-A (One Time)
Installation Activities. A digital camera will be used to document the post- retrofit conditions. Inspect and verify the refrigeration compressor controller installation to see if they meet the specifications of the DEA in terms of quantity. Verification Method: Visual inspection of equipment operation. Verification Period & Frequency: One-time post-retrofit year. Verification Details: