Interconnection Customer Interconnection Facilities Clause Samples
Interconnection Customer Interconnection Facilities. Interconnection Customer shall design, procure, construct, install, own and/or control Interconnection Customer Interconnection Facilities described in Appendix A, Interconnection Facilities, Network Upgrades and Distribution Upgrades, at its sole expense.
Interconnection Customer Interconnection Facilities. Engineering review and compliance verification of the ICIF, including all required drawings and equipment specifications reviews, relay settings, construction and testing assistance by engineering, field verification, and witness testing
Interconnection Customer Interconnection Facilities. Engineering review and compliance verification of the ICIF, including all required drawings and equipment specifications reviews, relay settings, construction and testing assistance by engineering, field verification, and witness testing Engineering, design, construction, testing and commissioning for revenue metering and EMS-RTU at Collector Station and line tap. Contingency $290,400 As described in the Facilities Study for the Small Generating Facility, the estimates provided herein: Assume: • 5X10 construction work week; • outages are available; SERVICE AGREEMENT NO. 2556 • permitting is not required; and • existing equipment to remain is functional. Exclude (as applicable): • discussions and negotiations of issued interconnection study; • application fees; • applicable surcharges; • overall project sales tax; • property taxes; • line switching; • property/easement acquisitions; • future operation and maintenance costs; • recurring monthly communications circuits’ charges, if any, responsible by the Interconnection Customer to the communications utility; • soil testing; • adverse field conditions such as rock, water, weather, and Interconnection Customer electrical equipment obstructions; • environmental mitigation; • extended engineering to minimize outage time or Connecting Transmission Owner’s public duty to serve; • extended craft labor hours, to minimize outage and/or construction time; or • any required permits. Cost adders estimated for overtime will be based on 1.5 and 2 times labor rates if required for work beyond normal business hours. Meals and equipment are also extra costs incurred for overtime labor.
Interconnection Customer Interconnection Facilities. Engineering review and compliance verification of the ICIF, including all required drawings and equipment specifications reviews, relay settings, construction and testing assistance by engineering, fiel verification, and witness testing Connecting Transmission Owner Interconne Engineering, design, construction, testing a revenue metering and EMS-RTU at Coll As described in the Facilities Study for the Small Generating Facility, the estimates provided herein: Assume: • 5X10 construction work week; • outages are available; • permitting is not required; and • existing equipment to remain is functional. Exclude (as applicable): • discussions and negotiations of issued interconnection study; • application fees; • applicable surcharges; • overall project sales tax; • property taxes; • line switching; • property/easement acquisitions; • future operation and maintenance costs; • recurring monthly communications circuits’ charges, if any, responsible by the Interconnection Customer to the communications utility; • soil testing; • adverse field conditions such as rock, water, weather, and Interconnection Customer electrical equipment obstructions; • environmental mitigation; • extended engineering to minimize outage time or Connecting Transmission Owner’s public duty to serve; • extended craft labor hours, to minimize outage and/or construction time; or • any required permits. Cost adders estimated for overtime will be based on 1.5 and 2 times labor rates if required for work beyond normal business hours. Meals and equipment are also extra costs incurred for overtime labor.
Interconnection Customer Interconnection Facilities. Interconnection Customer shall design, procure, construct, install, own and/or control Interconnection Customer
Interconnection Customer Interconnection Facilities. Distribution Provider’s Interconnection Facilities ............................. 11.3 Network Upgrades and Distribution Upgrades ..................................
Interconnection Customer Interconnection Facilities. Interconnection Customer Interconnection Relaying Facilities will include, but are not limited to, the following items:
Interconnection Customer Interconnection Facilities. Engineering review and compliance verification of the ICIF, including all required drawings and equipment specifications reviews, relay settings, construction and testing assistance by engineering, field verification, and witness testing Engineering, design, construction, testing and commissioning for revenue metering and EMS-RTU at Collector Station and line tap. Contingency $431,300 As described in the Facilities Study for the Small Generating Facility, the estimates provided herein: Assume: • 5X10 construction work week; • outages are available; • all major material is delivered to site and no costs are included for transport form storage; and • existing equipment to remain is functional. Exclude (as applicable): • discussions and negotiations of issued interconnection study; • application fees; • applicable surcharges; • overall project sales tax; • property taxes;
Interconnection Customer Interconnection Facilities. Engineering review and compliance verification of the ICIF, including all required drawings and equipment specifications reviews, relay settings, construction and testing assistance by engineering, field verification, and witness testing Engineering, design, construction, testing and commissioning for: Revenue metering and EMS-RTU $280,500 Line 18 Tap $1,540,400 Contingency $330,800 The estimates provided above assume: • outages are available; • permitting is not required; and • existing equipment to remain is functional. In addition, the estimates provided herein exclude, as applicable: • discussions and negotiations of issued interconnection study; • application fees;
Interconnection Customer Interconnection Facilities. Metering Interconnection Customer Interconnection Facilities will include, but are not limited to, the following items: