MONITORING DEVELOPMENT PROGRESS Sample Clauses

MONITORING DEVELOPMENT PROGRESS. Through planned design reviews and test activities, Iridium, Inc. will be able to monitor the TND progress. Duplication of testing for the purposes of satisfying requirements of the TND should be avoided. Iridium, Inc. will be afforded the opportunity to attend Gateway Design Reviews and participate in TND testing as described below. The test objectives of the TND contract include verification through test and demonstration that the IRIDIUM Gateway Equipment design meets the Functional Objectives identified in Section 3.1, the Performance Objectives outlined in Section 3.2 and as identified in Appendix A, the services described in Appendix B and the OA&M capabilities listed in Appendix C. The integrated Gateway Equipment will be shown to function as an integral part of the IRIDIUM Communication System. To accomplish the objectives, testing will be performed at four levels. The first testing level is subsystem acceptance testing. This testing will be performed to verify that the suppliers have met the subsystem level requirements. The second level of testing is performed at the Gateway Equipment level by integrating and testing the subsystems together as a functional entity. This level of testing will be performed to verify that the Gateway segment level requirements have been met and all interfaces external to the Gateway have been verified. Simulation will be used for most external interfaces. The third level of testing demonstrates the Gateway Equipment in the Gateway test laboratory. This level of testing introduces other system elements such as the System Control Segment Control Facility, the Message Termination Controller, and the ISU, which replace simulators in the Gateway test laboratory. The objective of this testing is to integrate the Gateway segment into the IRIDIUM Communications System in a laboratory environment. The fourth and final level of testing will be performed to demonstrate the integrated ---------------------------------- * Information has been omitted and filed separately with the Commission pursuant to Rule 406 of the Securities Act of 1933. By its Order Granting Approval pursuant to Rule 406, dated June 9, 1997, the Commission granted confidential treatment. Gateway Equipment functions in the IRIDIUM Communications System using on-orbit satellites as available. *
MONITORING DEVELOPMENT PROGRESS. Through planned design reviews and test activities, Iridium, Inc. will be able to monitor the TND progress. Duplication of testing for the purposes of satisfying requirements of the TND should be avoided. Iridium, Inc. will be afforded the opportunity to attend Gateway Design Reviews and participate in TND testing as described below. The test objectives of the TND contract include verification through test and demonstration that the IRIDIUM Gateway Equipment design meets the Functional Objectives identified in Section 3.1, the Performance Objectives outlined in Section 3.2 and as identified in Appendix A, the services described in Appendix B and the OA&M capabilities listed in Appendix C. The integrated Gateway Equipment will be shown to function as an integral part of the IRIDIUM Communication System. To accomplish the objectives, testing will be performed at four levels. The first testing level is subsystem acceptance testing. This testing will be performed to verify that the ---------------------------------- * Information has been omitted and filed separately with the Commission pursuant to Rule 406 of the Securities Act of 1933.

Related to MONITORING DEVELOPMENT PROGRESS

  • Development Program A. Development activities to be undertaken (Please break activities into subunits with the date of completion of major milestones) B. Estimated total development time

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in ▇▇▇▇▇, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Professional Development Program (a) The parties agree to continue a Professional Development Program for the maintenance and development of the faculty members' professional competence and effectiveness. It is agreed that maintenance of currency of subject knowledge, the improvement of performance of faculty duties, and the maintenance and improvement of professional competence, including instructional skills, are the primary professional development activities of faculty members. (b) Information collected as part of this program shall be the sole property of the faculty member. This information or any judgments arising from this program shall not be used to determine non-renewal or termination of a faculty member's contract, suspension or dismissal of a faculty member, denial of advancement on the salary scale, nor affect any other administrative decisions pertaining to the promotion or employment status of the faculty member. (c) A joint advisory committee consisting of three regular faculty members who shall be elected by and are P.D. Committee Chairpersons and three administrators shall make recommendations for the operation, financing and management of the Professional Development Program.

  • Synchronization, Commissioning and Commercial Operation 5.1.1 The SPG shall give PGVCL at least thirty (30) days’ advanced preliminary written notice and at least fifteen (15) days’ advanced final written notice, of the date on which it intends to synchronize the Solar Power Project to the Grid System. 5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the SPG to the Grid System when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the SPG at its generation facility of the Power Project at its own cost. The SPG shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/ and checking/verification is made by the concerned authorities of the PGVCL. 5.1.4 The SPG shall immediately after each synchronization/tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. In addition, the SPG will inject in-firm power to grid from time to time to carry out operational/ functional test prior to commercial operation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project. 5.1.5 The SPG shall commission the Project within nine (9) Months from the Date of execution of this PPA. Declaration of COD shall be certified by the commissioning committee. 5.1.6 The Parties agree that for the purpose of commencement of the supply of electricity by SPG to PGVCL, liquidated damages for delay etc., the Scheduled Commissioning Date as defined in this Agreement shall be the relevant date.

  • Design Development Phase 1.3.1 Based on the approved Schematic Design Documents, model(s) and any adjustments to the Program of Requirements, BIM Execution Plan or Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Design Development Documents derived from the model(s) in accordance with Owner’s written requirements to further define and finalize the size and character of the Project in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review the Design Development documents as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Design Development. The Architect/Engineer shall allow the Construction Manager to utilize the information uploaded into Owner’s PMIS to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.3.2 As a part of Design Development Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Architect/Engineer shall utilize Owner’s PMIS to accomplish model coordination and collaborate with Construction Manager in the resolution of critical clashes identified by the Construction Manager. Architect/Engineer shall demonstrate and provide written assurance to Owner that conflicts/collisions between models have been resolved. 1.3.3 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.3.4 Before proceeding into the Construction Document Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Design Development documents and approval of the mutually established Amount Available for the Construction Contract and schedule. 1.3.5 The Architect/Engineer shall prepare presentation materials including an animation derived from the model(s) as defined in “Facility Design Guidelines” at completion of Design Development and if so requested shall present same to the Board of Regents at a regular meeting where scheduled within the state. 1.3.6 The Architect/Engineer shall prepare preliminary recommended furniture layouts for all spaces where it is deemed important to substantiate the fulfillment of program space requirements, or to coordinate with specific architectural, mechanical and electrical elements. 1.3.7 Architect/Engineer shall assist the Owner, if requested, with seeking approval of the Project by the Texas Higher Education Coordinating Board (THECB). Such assistance shall include (i) the preparation of a listing of the rooms and square footages in the Project, and (ii) the preparation of project cost information, in accordance with THECB Guidelines. This information shall be provided at the completion of the Design Development Phase when requested by the Owner. The listing of rooms and square footages shall then be updated to reflect any changes occurring during construction and provided to the Owner at Substantial Completion. 1.3.8 At the completion of the Design Development Phase, or such other time as Owner may specify to Architect/Engineer, at Owner’s sole option and discretion, Owner will furnish Architect/Engineer with a Guaranteed Maximum Price proposal prepared by Construction Manager based upon the Design Development documents prepared by the Architect/Engineer and approved by the Owner. The Architect/Engineer shall assist the Owner and endeavor to further and advocate the Owner’s interests in Owner’s communications with the Construction Manager in an effort to develop a Guaranteed Maximum Price proposal acceptable to Owner, in Owner’s sole option and discretion. If the Owner does not accept the Construction Manager’s Guaranteed Maximum Price proposal, the Architect/Engineer shall participate with the Owner and Construction Manager in constructability reviews and shall revise the documents as necessary in order to reach an agreement. If the Construction Manager’s Guaranteed Maximum Price proposal exceeds the Schematic Design Phase Estimated Construction Cost prepared by, or otherwise accepted by the Construction Manager due to an increase in the scope of the Project caused by further development of the design documents by the Architect/Engineer to the extent that such could not be reasonably inferred by the Construction Manager from the Schematic Design documents, and Owner directs Architect/Engineer to revise the documents, the Architect/Engineer shall revise the documents at its own expense so that the Guaranteed Maximum Price proposal for constructing the Project shall not exceed the Owner’s Amount Available for the Construction Contract and any previously approved Estimated Construction Costs. If it is determined to be in the Owner’s best interest, instead of requiring the Architect/Engineer to revise the Drawings and Specifications, the Owner reserves the right to accept a Guaranteed Maximum Price proposal that exceeds the stipulated Amount Available for the Construction Contract. The Architect/Engineer shall analyze the final Guaranteed Maximum Price proposal document, together with its supporting assumptions, clarifications, and contingencies, and shall submit a detailed written analysis of the document to the Owner. Such analysis shall include, without limitation, reference to and explanation of any inaccurate or improper assumptions and clarifications. The A/E will not be required to make revisions to the documents at its own expense under the provisions of this paragraph if the Owner’s rejection of the Guaranteed Maximum Price proposal is not due to a failure of the A/E to provide the services otherwise required herein. 1.3.9 After the Guaranteed Maximum Price has been accepted, the Architect/Engineer shall incorporate necessary revisions into the Design Development documents. The A/E will not be required to make revisions to the documents at its own expense under the provisions of this paragraph if the revisions are required as the result of inaccurate assumptions and clarifications made in the development of the Guaranteed Maximum Price proposal that are not due to a failure of the A/E to provide the services otherwise required herein.