Planning Procedures Sample Clauses

Planning Procedures. The procedures for identifying and remedying impairments shall be handled on a planning basis. The impairment process is not directly applicable to DAM or RT operations under the 600/400 MW transactions. EXISTING IMPAIRMENTS PJM and the NYISO are not aware of any existing impairments that would preclude provision of transmission service under the 600 MW / 400 MW transaction. NOTIFICATION PROCEDURES ConEd and PSE&G shall notify the NYISO and PJM respectively under their existing ISO/RTO interconnection procedures when interconnecting new generation facilities to their transmission systems. PROCEDURES FOR DETERMINATION OF FUTURE IMPAIRMENTS The procedures to be used by the NYISO and PJM for the determination of future impairments shall be in accordance with: The PJM Regional Transmission Expansion Planning Process, as revised from time to time; The NYISO Comprehensive Reliability Planning Process, as revised from time to time; and The Northeast ISO/RTO Planning Coordination Protocol executed by PJM, the NYISO and ISO-New England Inc., as revised from time to time. The Northeast ISO/RTO Planning Coordination Protocol contains provisions for the coordination of interconnection requests received by one ISO/RTO that have the potential to cause impacts on an adjacent ISO/RTO to include the handling of firm transmission service. The Northeast ISO/RTO Planning Coordination Protocol has provisions for notification, development of screening procedures, and coordination of the study process between the ISO/RTOs. The Northeast ISO/RTO Planning Coordination Protocol also provides that all analyses performed to evaluate cross-border impacts on the system facilities of one of the ISOs/RTOs will be based on the criteria, guidelines, procedures or standards applicable to those facilities. Future planning studies by the ISOs/RTOs shall include 1,000 MW8 of firm delivery from the NYISO at Waldwick and 1,000 MW of re-delivery from PJM at the ▇▇▇▇▇▇ and Linden interface independent of the amount of off-cost operation that is required to meet reliability criteria. For PJM load deliverability planning studies, which simulate a capacity emergency situation, the system shall be planned to include 1,000 MW of firm delivery from the NYISO at Waldwick and 600 MW of re-delivery from PJM at the ▇▇▇▇▇▇ and Linden interface.
Planning Procedures. The manuals, procedures and protocols for planning and expansion of the New England Transmission System, as such manuals, procedures, and protocols may be modified from time to time in accordance with this Agreement.
Planning Procedures. The Parties shall mutually communicate certain market, operational and logistics information and data as set forth herein to effectively plan Feedstock supply chain requirements for the Plant.
Planning Procedures documentation and evidence

Related to Planning Procedures

  • Testing Procedures The following test procedure shall apply to all urine tests administered to bargaining unit employees: a. Urine specimens shall be collected at the approved laboratory as stated below in section (e), or at an accredited medical facility when necessary after an accident. b. The employee shall not be observed when the urine specimen is given. c. All specimen containers, vials or bags used to transport the samples shall be sealed with evidence tape and labeled in the presence of the employee. d. The testing shall be done by another approved laboratory. e. The employer shall choose the testing/collection facility to be utilized for toxicology testing on a yearly basis. f. The following standards shall be used to determine what levels of detected substances shall be considered positive. Note: - These are current levels subject to change by Federally Mandated Regulations. Current Federal Regulations shall be controlling in case of change or conflict: DRUG SCREENING TEST CONFIRMATION Amphetamines 500 ng/ml Amphetamine 250 ng/ml GC-MS Marijuana Metabolites 50 ng/▇▇ ▇▇▇▇▇-THC 15 ng/ml GC-MS Cocaine Metabolites 150 ng/ml Metabolites 100 ng/ml GC-MS Opiates Morphine 2,000 ng/ml 2,000 ng/ml GC-MS PCP 25 ng/ml PCP 25 ng/ml GC-MS MDMA 500 ng/ml 250 ng/ml Alcohol .08 Breath .04 Breath – Employees with CDL .02 - .039 Breath - Employees with CDL will be removed from service for 24 hrs. g. Tests which are below the levels set forth above shall be determined as negative. If test results are negative, all non-required documentation regarding supervisors' observations and testing will be destroyed. h. At the time the urine specimen is collected two samples will be taken. One sample will be sent to the laboratory to be tested at the employer's expense. If the first sample tests positive then upon written request by the employee within twenty-four

  • Billing Procedures The Supporting Party will bill the Protecting Party for actual costs incurred for Assistance by Hire. Reimbursements will be limited to the provisions of the Agreement and the applicable OP, regardless of whether or not it is authorized on the Resource Order or other documentation produced by the incident. Reimbursable costs may include transportation, salary, overtime, per diem and other approved expenses of supporting agency personnel. Rates and conditions of use for the equipment and personnel are documented in the OP. Parties shall submit a bill within 90 days of the incident. Parties must use their own invoice form for billing under this Agreement to avoid any confusion with other services that may have been ordered under other agreements. Invoices must identify Supporting Party’s name, address, and Taxpayer Identification Number (Department only), fire name, order and request number, and bill number and amount. Invoice supporting documentation must include description of services performed, period of services performed, and any applicable cost share agreements. Supporting documentation will itemize details of billing, listing personnel, equipment, travel and per diem, aircraft, supplies and purchases as approved in the attached OP. It will also include itemized deductions for maintenance and repair of equipment. Department invoices will include “Record of Activities” (FSLA-5) and U.S. Forest Service invoices will include transaction register. Invoices for services under this agreement must be sent to: ▇▇▇▇▇ ▇▇▇▇▇▇▇, FFMO ▇▇▇▇ ▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Telephone: ▇▇▇-▇▇▇-▇▇▇▇ FAX: ▇▇▇-▇▇▇-▇▇▇▇ Email: ▇▇▇▇▇▇▇▇@▇▇.▇▇▇.▇▇ ▇▇▇ ▇▇▇▇▇▇▇▇, FIRE CHIEF ▇.▇. ▇▇▇ ▇▇▇ ▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Telephone: ▇▇▇-▇▇▇-▇▇▇▇ FAX: ▇▇▇-▇▇▇-▇▇▇▇ Email: ▇▇▇▇▇▇▇▇▇▇▇.▇▇▇▇@▇▇▇▇▇▇▇▇.▇▇▇ All bills will have a payment due date 30 days upon receipt. Contested ▇▇▇▇▇▇▇▇: Written notice that a bill is contested will be mailed to the Party within 30 days of receipt of the invoice and will fully explain the contested items. Contested items should be resolved no later than 60 days following receipt of the written notice. Parties are responsible for facilitating resolution of contested ▇▇▇▇▇▇▇▇. Billing requirements and rates are documented in the attached OP.

  • ORDERING PROCEDURES All task orders under OASIS SB must: 1. Be awarded by an OCO with a Delegation of Procurement Authority (DPA) or by a Contractor authorized to use the OASIS SB Contracts as a Government Source of Supply 2. Be within the scope of Section C and all other terms and conditions of the OASIS SBcontract 3. Be solicited and awarded under the proper NAICS Code and corresponding OASIS SB MA-IDIQ Contract Number (See Section H.4.) 4. Identify the proper Product Service Code (See Section H.5.) and, 5. Comply with the OASIS SB Contract, OASIS SB DPA Training, OASIS SB Ordering Guide, the Ordering Procedures in FAR Subpart 16.505, Ordering, and other applicable agency specific regulatorysupplements

  • Reporting Procedures Enter in the ▇▇▇ Entity Management area the information that ▇▇▇ requires about each proceeding described in paragraph 2 of this award term and condition. You do not need to submit the information a second time under assistance awards that you received if you already provided the information through ▇▇▇ because you were required to do so under Federal procurement contracts that you were awarded.

  • Hiring Procedures Nothing contained in this Article 4 shall impair any of the rights of the Employer to hire new or additional employees to meet the employment needs of the Employer, in accordance with the terms and provisions of this collective bargaining Agreement or to meet the obligations of the Employer under Article 2, Section H of this Agreement or to take affirmative steps to comply with any requirements under any applicable Federal or State law prohibiting discrimination in employment.