Required Infrastructure Improvements Clause Samples

Required Infrastructure Improvements. Subject to all the terms and conditions of this Agreement, Master Developer agrees to construct all infrastructure necessary to support the Project as described in Exhibit E. Master Developer further agrees to install, at Master Developer’s expense, off-site infrastructure necessary to provide services to the Project, including without limitation: (a) Sanitary sewer conveyance upgrades that are necessary based on the increased flows resulting from the anticipated land use changes resulting in a residential unit count that would generate sewage volumes 200% to 300% greater than attributed to the site in the sewer model; and (b) Improvements to public streets, sidewalks, curbs, and gutters that are necessary based on the increased traffic resulting from the anticipated land use changes in the Project. This includes but is not limited to off-site improvements to Highland Ranch Parkway and to the intersection of Highland Ranch Parkway and Pyramid Highway as follows: (i) Prior to issuance of any building permits for structures, the widening to four travel lanes of Highland Ranch Parkway from Pyramid Highway to the entrance to the Project. (ii) Prior to or concurrently with submitting an application for a tentative map and/or for multi-family residential units exceeding, in aggregate, 650 dwelling units, the Master Developer shall submit an encroachment permit application to the Nevada Department of Transportation to complete all improvements to the intersection of Highland Ranch Parkway and Pyramid Highway recommended in the The Quarry Traffic Study dated September (25), 2017, with an addendum dated March 12, 2018, and prepared by Solaegui Engineers, incorporated by reference herein as part of the Infrastructure Plan attached hereto as Exhibit E. All improvements from the entrance to the Project to the intersection of Highland Ranch Parkway and Pyramid Highway shall be completed prior to issuance of any certificate of occupany for or final inspection of any dwelling unit in excess of 650 dwelling units in the Project. (c) Flood control and drainage improvements that are necessary based on the anticipated land use changes in the Project. (i) If the Property is included in Impact Fee Service Area Number 1, the City will consider for inclusion in the Impact Fee Service Area Number 1 Capital Improvements Plan any flood control and drainage improvements that have regional impacts as illustrated by a hydrology study to be completed at Master Developer’s expense. The ...
Required Infrastructure Improvements. Subject to all the terms and conditions of this Agreement, Master Developer agrees to construct all infrastructure necessary to support the Project as described in Exhibit E. Master Developer further agrees to install, at Master Developer’s expense, off-site infrastructure necessary to provide services to the Project, including without limitation: (a) Sanitary sewer conveyance upgrades that are necessary based on the increased flows resulting from the anticipated land use changes and the topography of the site and surrounding areas. (b) Improvements to streets, sidewalks, curbs, and gutters that are necessary based on the increased traffic resulting from the anticipated land use changes in the Project. This includes but is not limited to off-site improvements as follows: (i) Prior to the issuance of any certificate of occupancy for and/or final inspection of any dwelling unit in the Project, all streets from the intersection of Vista Boulevard and Homerun Drive to the Project Entrance shall comply with the 2012 Standard Specifications for Public Works Construction Revision 7. Roadways shall be improved to meet the City of Sparks Standard Residential Street Section to the approval of the City Engineer and the Fire Chief. The roadway construction schedule shall be coordinated with the City’s Parks and Recreation Department and Community Services Department. To maintain public access to Golden Eagle Regional Park for the duration of all construction of the Project, Master Developer shall be responsible for all damages caused by Master Developer’s activities to all streets, sidewalks, curbs, gutters, and other improvements from the intersection of Vista Boulevard and Homerun Drive to the Project Entrance, and shall repair all such damages to the approval of the City Engineer. Any repairs or maintenance made necessary or prudent due in whole or in part to Master Developer’s activities concerning the Project shall be made within 24 hours of notice by telephone call to Master Developer or Master Developer’s general contractor, as applicable, unless another time for repairs is agreed upon by the City. If repairs or maintenance are not timely completed, City may cause such repairs or maintenance to be completed at Master Developer’s cost and expense. (ii) Prior to the issuance of any certificate of occupancy for and/or final inspection of any dwelling unit in excess of seventy-five (75) dwelling units in the Project, the intersection of Vista Boulevard, Homerun Dri...
Required Infrastructure Improvements. Subject to all the terms and conditions of this Agreement, Master Developer agrees to construct all infrastructure necessary to support the Project as described in Exhibit E. Master Developer further agrees to install, at Master Developer’s expense, off-site infrastructure necessary to provide services to the Project, including without limitation: (a) Sanitary sewer collection system upsizing, which shall be completed prior to any issuance of a certificate of occupancy for or final inspection of any residential or commercial unit in excess of 1,650 equivalent residential units (ERUs). Commercial space ERUs are calculated using the following formula: 21.65 weighted fixture units equals 1 (one) ERU. The sanitary sewer system improvements include, without limitation, upsizing approximately 800 linear feet of 8-inch diameter pipe to 10-inch diameter pipe and 520 linear feet of 10-inch diameter pipe to 12-inch diameter pipe along Sparks Boulevard between Pyramid Highway Way and ▇▇▇▇▇ Parkway. Additional sanitary sewer collection system improvements may also be required and shall be installed at Master Developer’s expense. (b) Improvements to public streets, sidewalks, curbs, and gutters that are necessary based on the increased traffic resulting from the anticipated land use changes in the Project. This includes but is not limited to off-site improvements to Highland Ranch Parkway and to the intersection of Highland Ranch Parkway and Pyramid Highway Way as follows: (i) The widening to four travel lanes of Highland Ranch Parkway from Pyramid Highway Way to the entrance to the Project. Master Developer shall complete this improvement prior to issuance of any certificate of occupancy for or final inspection of any dwelling unit in excess of 650 dwelling units in the Project, or upon degradation below Level of Service (LOS) D of the segment of Highland Ranch Parkway between Pyramid Highway Way and the entrance to the Project, or upon degradation below LOS E of the intersection of Pyramid Highway Way and Highland Ranch Parkway, whichever first occurs. (ii) The improvements to the intersection of Highland Ranch Parkway and Pyramid HighwayWay. Prior to or concurrently with submitting an application for a tentative map and/or for multi-family residential units exceeding, in aggregate, 650 dwelling units in the Project, the Master Developer shall submit an encroachment permit application to the Nevada Department of Transportation to complete all improvements to the inte...
Required Infrastructure Improvements 

Related to Required Infrastructure Improvements

  • Notice to Proceed - Site Improvements The Recipient shall not commence, or cause to be commenced, any site improvements or other work on the Land until the Director has issued a Notice to Proceed to the Recipient. Such Notice to Proceed will not be issued until the Director is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and has completed any land acquisition required by the Project. A Notice to Proceed shall be required for all Project prime contractors or direct procurement initiated by the Recipient following execution of this Agreement.

  • Capital Improvements From and after Final Completion, Tenant shall not replace or materially alter the Project, or any part thereof (except as provided to the contrary with respect to Fixtures in Article 13), or make any addition thereto, whether voluntarily or in connection with repairs required by this Lease (collectively, “Capital Improvements”), unless Tenant shall comply with the following requirements and, if applicable, with the additional requirements set forth in Section 11.10: (a) No Capital Improvements shall be undertaken, as applicable, until Tenant shall have procured from all Governmental Authorities and paid for all permits, consents, certificates and approvals for the proposed Capital Improvements which are required to be obtained prior to the commencement of the proposed Capital Improvements (collectively, “Improvement Approvals”). The FCRHA shall not unreasonably refuse to join or otherwise unreasonably refuse to cooperate in the application for any such Improvement Approvals, provided such application is made without cost, expense or liability (contingent or otherwise) to the FCRHA. True copies of all such Improvement Approvals shall be delivered by Tenant to the FCRHA prior to commencement of the proposed Capital Improvements. (b) The Premises after completion of such Capital Improvements, shall have a value at least equal to the value of the Premises immediately before construction of such Capital Improvements. In addition, the Project shall at all times remain in substantial conformity with the original Plans and Specifications therefor (except to the extent specifically consented to by the FCRHA, in its sole but reasonable discretion). (c) All Capital Improvements shall be made with reasonable diligence and continuity (subject to Unavoidable Delays) and in a good and workmanlike manner and in compliance with (i) all Improvement Approvals, (ii) if required pursuant to Section 11.10(a) or (b), in substantial accordance with the plans and specifications for such Capital Improvements as approved by the FCRHA, and (iii) all Applicable Laws. (d) No construction of any Capital Improvement shall be commenced until Tenant shall have delivered to the FCRHA certificates of insurance and copies of the declaration page(s) for the insurance required by Exhibit D. Such insurance policies shall comply with the terms of Section 7.02 above.

  • Needs Improvement the Educator’s performance on a standard or overall is below the requirements of a standard or overall, but is not considered to be unsatisfactory at this time. Improvement is necessary and expected.

  • Existing Improvements All improvements located on the Site as of the date of execution of the Construction Contract, whether above or below the surface of the ground, including but not limited to existing buildings, utilities, infrastructure improvements and other facilities.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If WCS chooses to subtend a Verizon access Tandem, WCS’s NPA/NXX must be assigned by WCS to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 WCS shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from WCS’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office WCS utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow WCS’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.