Schematic Design Stage Clause Samples

Schematic Design Stage. 5.9.2.1 Based on the approved Program of Requirements and the Amount Available for the Construction Contract authorized by the Owner, the Contractor shall develop sufficient alternative approaches to design and construction of the Project and review them with the Owner. The Contractor shall prepare Schematic Design documents and a preliminary Estimated Construction Costs and submit them to the Owner for approval. The Estimated Construction Costs shall affirm adherence to the Amount Available for the Construction Contract. 5.9.2.2 Architect/Engineer shall provide all services necessary to perform the services of this phase (preparation of model(s), relevant data, decision support model views and Schematic Design Documents) including, without limitation, unless otherwise approved by Owner, the preparation and prompt delivery of all items specified in the BIM Execution Plan and “Facility Design Guidelines”. 5.9.2.3 Before proceeding to the Design Development Stage, the Contractor shall obtain Owner’s written authorization to proceed and the Owner’s approval of the preliminary Estimated Construction Costs.
Schematic Design Stage. 5.2.3.1 Based on the approved pre-design documents and any adjustments to the Facility Program or Construction Cost Limitation or the Project Schedule authorized by Owner, Design/Build Contractor shall develop sufficient alternative approaches to the design and construction of the Project and shall review them with Owner. Design/Build Contractor shall prepare Schematic Design documents and the Estimated Construction Cost and submit them to Owner for approval. The Estimated Construction Cost shall affirm adherence to the Construction Cost Limitation. . Design/Build Contractor shall advise Owner of any adjustments to the project scope necessary to align the Estimated Construction Cost with the Construction Cost Limitation and shall revise the Schematic Design Documents, without charge to Owner, as may be required to comply with the Construction Cost Limitation. Owner may, solely at Owner’s discretion and in writing, increase or decrease the Construction Cost Limitation to align with Design/Build Contractor’s Estimated Construction Cost. 5.2.3.2 Design/Build Contractor shall furnish and deliver to Owner the number of complete printed sets of Schematic Design documents as required. 5.2.3.3 Before proceeding to the Design Development Stage, Design/Build Contractor shall obtain Owner’s written authorization to proceed and Owner’s acknowledgement of the Design/Build Contractor’s submission of the Estimated Construction Cost. Owner’s acknowledgement of Design/Build Contractor’s submission of the Estimated Construction Cost prepared at the Schematic Design Phase does not relieve Design/Build Contractor of its obligation to design and construct the Project within the Construction Cost Limitation.
Schematic Design Stage. 2.2.1 During the Schematic Design Stage, the AOR shall: 2.2.1.1 identify and analyze requirements of Applicable Law; 2.2.1.2 review and provide recommendations concerning Site use and improvements and alternative approaches to selection of materials, building systems, and equipment; and 2.2.1.3 provide recommendations on value engineering, constructability, logistics, site use and improvements, availability and suitability of materials, equipment, labor and systems, long-lead items, safety and security plans, quality control, time requirements for construction, and factors related to the cost of the Project including costs of alternative designs or materials, preliminary budgets and possible economies.
Schematic Design Stage. 5.2.3.1 Based on the approved pre-design documents and any adjustments to the Program or Construction Cost Limitation authorized by the Owner, the Design/Build Contractor shall develop sufficient alternative approaches to design and construction of the Project and review them with the Owner. The Design/Build Contractor shall prepare Schematic Design documents and a preliminary construction cost estimate and submit them to the Owner for approval. The construction cost estimate shall affirm adherence to the Construction Cost Limitation. 5.2.3.2 The Design/Build Contractor shall furnish and deliver to the Owner the number of complete printed sets of Schematic Design documents as required. 5.2.3.3 Before proceeding to the Design Development Stage, the Design/Build Contractor shall obtain Owner’s written authorization to proceed and the Owner’s approval of the preliminary construction cost estimate.
Schematic Design Stage. The Design/Build Contractor shall prepare the Schematic Design Documents and such construction cost estimates in accordance with Subparagraph 5.1.3 and in alignment with the procurement and bid/proposal package strategies required under Subparagraph 5.1.5 above and this Subparagraph 5.2.3 (collectively referred to as the “Preliminary Schematic Design Approval Package”) and submit them to the Owner for its initial review. Based on the pre-design documents reviewed by the Owner (and approved for proceeding to the next stage) and any adjustments to the Owner’s Design Requirements, the Project CPM Schedule, or CCL authorized by the Owner, the Design/Build Contractor shall develop sufficient alternative approaches to design and construction of the Project and review them with the Owner.
Schematic Design Stage. 5.9.3.1 Based on the approved pre-design documents and any adjustments to the Program of Requirements or Amount Available for the Construction Contract authorized by the Owner, the Contractor shall develop sufficient alternative approaches to design and construction of the Project and review them with the Owner. The Contractor shall prepare Schematic Design documents and a preliminary Estimated Construction Costs and submit them to the Owner for approval. The Estimated Construction Costs shall affirm adherence to the Amount Available for the Construction Contract. 5.9.3.2 The Contractor shall furnish and deliver to the Owner the model(s) in native file format, the drawings derived from the models in “DWG” and “PDF” file format and number of complete printed sets of Schematic Design documents as required. 5.9.3.3 Before proceeding to the Design Development Stage, the Contractor shall obtain Owner’s written authorization to proceed and the Owner’s approval of the preliminary Estimated Construction Costs.
Schematic Design Stage. 5.9.2.1 Based on the approved Program of Requirements and the Amount Available for the Construction Contract authorized by the City, the Contractor shall develop sufficient alternative approaches to design and construction of the Project and review them with the City. The Contractor shall prepare Schematic Design documents and a preliminary Estimated Construction Costs and submit them to the City for approval. The Estimated Construction Costs shall affirm adherence to the Amount Available for the Construction Contract.
Schematic Design Stage. 3.1.1 Unless the Contracting Authority directs otherwise in writing, the Schematic Design Stage will begin upon completion of the activities described under Section 2.4.
Schematic Design Stage. 5.9.3.1 Based on the approved pre-design documents and any adjustments to the Program of Requirements or Amount Available for the Construction Contract authorized by the Owner, the Contractor shall develop sufficient alternative approaches to design and construction of the Project and review them with the Owner. The Contractor shall prepare Schematic Design documents and a preliminary Estimated Construction Costs and submit them to the Owner for approval. The Estimated Construction Costs shall affirm adherence to the Amount Available for the Construction Contract. 5.9.3.2 Architect/Engineer shall provide all services necessary to perform the services of this phase (preparation of model(s), relevant data, decision support model views and Schematic Design Documents) including, without limitation, unless otherwise approved by Owner, the preparation and prompt delivery of all items specified in the BIM Execution Plan and “Facility Design Guidelines”. 5.9.3.3 Before proceeding to the Design Development Stage, the Contractor shall obtain Owner’s written authorization to proceed and the Owner’s approval of the preliminary Estimated Construction Costs.
Schematic Design Stage