Trenching Requirements. Project in Excess of Twenty-Five Thousand Dollars ($25,000)
Trenching Requirements a. If the contract involves digging trenches or other excavations that extend deeper than four feet below the surface, the Contractor shall: 1) Promptly, and before the following conditions are disturbed, notify the Owner, in writing, of any: (a) Material that the Contractor believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law. (b) Subsurface or latent physical conditions at the site differing from those indicated. (c) Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract. b. That the Owner, or Engineer, if there is one, shall promptly investigate the conditions, and if he finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in the Contractor's cost of, or the time required for, performance of any part of the work shall issue a change order under the procedures described herein. In the event that a dispute arises between the Owner and the Contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the Contractor's cost of, or time required for, performance of any part of the work, the Contractor shall not be excused from any scheduled completion date provided for by the Contract, but shall proceed with all work to be performed under the Contract. The Contractor shall retain any and all rights provided herein which pertain to the resolution of disputes and protests between the contracting parties. 1-32 UTILITY RELOCATION a. Owner shall assume the responsibility for the timely removal, relocation, or protection of existing main or trunkline utility facilities which may be located on the project site if either Owner, or Engineer, if there is one, fails to identify the utilities in the plans and specifications made a part of the Notice Inviting Bids, and Owner shall compensate Contractor for the costs of locating, repairing damage not due to the failure of the Contractor to exercise reasonable care, and removing or relocating such utility facilities not indicated in the plans and specifications with reasonable accuracy, and for equipment on the project necessarily idled during such work. If the Contractor while ...
Trenching Requirements. Applicant is responsible for all trenching relative to the Gas Extension Installation covered in the Contract. Joint trench width shall be as specified in the Utility Gas Construction Standard 19. 1. For gas trench only (GTO), the trench shall be wide enough to provide a minimum of 3-inches of sand padded clearance at side of the installed gas pipe. All trenching, joint or GTO shall be performed according to the following requirements:
Trenching Requirements a. If the contract involves digging trenches or other excavations that extend deeper than four feet below the surface, the Contractor shall:

Related to Trenching Requirements

  • Testing Requirements 12.1. Workplaces - 12.2. On workplaces where the value of the Commonwealth’s contribution to the project that includes the building work is at least $5,000,000, and represents at least 50% of the total construction project value or the Commonwealth’s contribution to the project that includes the building work is at least $10,000,000 (irrespective of its proportion of the total construction project value) the following minimum testing requirements must be adhered to.

  • Screening Requirements LFAC shall ensure that all prospective and current Covered Persons are not Ineligible Persons, by implementing the following screening requirements. a. LFAC shall screen all prospective Covered Persons against the Exclusion List prior to engaging their services and, as part of the hiring or contracting process, shall require such Covered Persons to disclose whether they are Ineligible Persons. b. LFAC shall screen all current Covered Persons against the Exclusion List within 30 days after the Effective Date and on a monthly basis thereafter. c. LFAC shall require all Covered Persons to disclose immediately if they become an Ineligible Person. LFAC shall maintain documentation (i.e., a print screen of the search results) in order to demonstrate that LFAC: (1) has checked the Exclusion List and determined that its Covered Persons are not Ineligible Persons; and (2) has required its Covered Persons to disclose if they are an Ineligible Person. Nothing in this Section III.D affects LFAC’s responsibility to refrain from (and liability for) billing Federal health care programs for items or services furnished, ordered, or prescribed by an excluded person. LFAC understands that items or services furnished by excluded persons are not payable by Federal health care programs and that LFAC may be liable for overpayments and/or criminal, civil, and administrative sanctions for employing or contracting with an excluded person regardless of whether LFAC meets the requirements of Section III.D.

  • Staffing Requirements Licensee will be in full compliance with the main studio staff requirements as specified by the FCC.

  • Training Requirements Grantee will: A. Authorize and require staff (including volunteers) to attend training, conferences, and meetings as directed by DSHS. B. Appropriately budget funds to meet training requirements in a timely manner, and ensure staff and volunteers are trained as specified in the training requirements listed at ▇▇▇▇▇://▇▇▇.▇▇▇▇.▇▇▇▇▇.▇▇▇/hivstd/training/ and as otherwise specified by DSHS. Grantee shall document that these training requirements are met. C. Follow the appropriate DSHS POPS by funding opportunity (as per Section I: General Requirements for All Grantees) for training and observation requirements.

  • Trunking Requirements The Parties will provide designed Interconnection facilities that meet the same technical criteria and service standards, such as probability of blocking in peak hours and transmission standards, in accordance with current industry standards.